Loading...
CR 97-209 Change Order #1- EVP Project~ t Y o G ,n H 5 November 12, 1997 ~ a K~`' Council Report No. 97-209 CHANGE ORDER NO. 1 1997 EVP PROJECT Proposed Action. Staff recommends adoption of the following motion: Move that Council approve Change Order No. 1 as it pertains to Project 97-06, 1997 EVP Svstem Installation. Overview. At its October 21 meeting Council awarded the contract for the 1997 Emergency Vehicle Preemption System installation to Electrical Installation and Maintenance. Subsequent to that award, staff learned that the consultant bid documents were in error in terms of quoted quantities. The contractor was approached and agreed to include quantities at the bid price. Council needs to authorize the change order to effect the additional quantities. Primary Issues to Consider. Nature of change order The contract documents should have reflected a total of ten units each for pedestal and light fixture EVP conduit extension. The documents actually detailed six units. The change order calls for an additional four units to meet plan quantity. Cost and funding The change order will cost an additional $3,020.00. The contract amount will increase to $21,960.00. The funding source for the entire EVP system will be State Aid monies. Recommendation Staff recommends authorization of the change order to meet planned quantities. Supportiaa Information. Change Order No. 1 ~~ es Gessele Engineering Superintendent MdDOT TP-21840.02 (5/83) Sheet ~_ of 1 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION CHANGE ORDER # 1 tractor Elechical Installation & Maintenance Comnanv ess 4985 Broadmoor Drive. Manle Plain MN 55359 S.P. No. 132-030.02. 132-020-12 F.P. No. Job Location SiPgg] 3vstems A-D Honldns. Minnesota BMI No. TC97.0084 ht accordance with the terms of this Conttact, you are hereby authorized and instnicted to perform the Work as altered by the following provisions: WHEREAS, the contract quantity £or Item No. 0565.601 EVP Conduit Extension-Pedestal and Item No. 0505.601 EVP Conduit Extension - Light Fixttrre is 6 Each and 6 Each respectively. WHEREAS, the plan quantity for each of these items is 10 each. THEREFORE, BE TT MUTUALLY AGREED, the contract quantity for the following two items shall be increased by 4 units to meet plan quantity: ESTIMATED CHANGE IN COST ITEM NO. ITEMNAME UNIT QUANTITY CONTRACT UNIT PRICE AMOUNT 05.601 EVPCONDUITEXl'ENSION-PEDESTAL EACH 4 365 $1,460.00 0$0$.601 EVPCONDUITEXTENSION-LIGHTFDCCURE EACH 4 390 $1,560.00 $0,00 $0.00 $0.00 TOTAL DUE TO CHANGE ORDER NO. 1 $3,020.00 ORIGINAL CONTRACT COSTS TOTAL CONTRACT COSTS DUB TO CHANGE ORDERNO. 1 Due to this change the Contract Time: c Working ( ) Issued by a. is increased ( ) by Calendar ( )days. Prdl decreased () ' Accepted by b. is not changed (x ). t c. may be revised if the work affected the controlling Approved by ration ( ). t Approved by gmeer for~~C,,ity//e 2TQ's'~i ractot's Authorized of Hopkins $18.940.00 $21,960.00 Date /3/4T Date Dale Asst District Engineer Daze Reference Coast Mam~at 5-591.200.@.367 3/'