Loading...
CR 98-74 Award Bid- Alley Reconstruction Project 97-16May 15, 1998 Primary Issues to Consider. Bid tabulation and recommendation Funding Agreement with U S West Schedule Supporting Information. Bolton and Menk recommendation Tabulation • Resolution 98 -28 James Gessele Engineering Supt. I ....,,G_ Award Bid Alley Reconstruction Project 97 -16 Council Report 98 -74 Proposed Action. Staff recommends adoption of the following motion: Move that Council adopt Resolution 98-28., Resolution for Award of Bid, Alley Reconstruction, Project 97 -16. Overview. Council at its April 21 meeting approved plans and ordered bids concerning reconstruction of an alley between the Hopkins Center for the Arts and the U S West Central Office Building. A bid opening was conducted May 15, and Council needs to take action on award of the contract. Analysis. Bid tabulation and recommendation Contractor Bid Gunderson Bros. (A) $54,549.50 (B) $57,549.50 Thomas and Sons (A) $59,556.00 (B) $58,121.00 Kassa Const. (A) $61,378.00 (B) $63,714.00 Engineer's Estimate (A) $53,376.50 (B) $53,306.50 (A) — Bituminous parking area (B) — Concrete parking area Three bids were received and tabulated. The low bidder was Gunderson Brothers Cement Contractors. All bids were reviewed for accuracy and qualifications. The City has considerable positive experience with Gunderson Brothers on past sidewalk and alley projects. The contractor has the equipment and manpower to complete the project successfully and on schedule. Staff concurs with Bolton and Menk's recommendation that alternate B of the contract be awarded to Gunderson Brothers. Staff feels there is considerable value in the $3,000 additional expense for concrete parking areas. Future maintenance issues are diminished considerably. Funding The engineer's estimate of $53,306.50 for option B was raised substantially over that given in earlier project Council reports, almost $10,000.00 more. Bidding results of this past spring have come in consistently higher than anticipated. Thus the consultant's move to revise his estimate. When this project was grouped with the Interlachen Park bid package, the successful low bidder would have been awarded a contract for the same work at $63,483.40. Funding for this project is proposed to be through the storm sewer utility. Agreement with U S West The City is still negotiating with U S West representatives over issues of parking sign placement on their building and limiting their designated permitted parking to three stalls during daytime hours. Schedule May 19 Bid award June 1 Begin construction June 26 Completion BOLTON 8t. M E N K, i N C_ Consulting Engin rs 8c Surveyors May 14, 1998 Mr. Jim Gessele Engineering Supervisor 1010 1st Street Hopkins, MN 55343 RE: Recommendation of Award 1998 Alley Improvements BMI Project No. TC97.0210 Dear Mr. Gessele Enclosed please find an abstract of bids for the above referenced project. We have reviewed the bids received on May 14, 1998, for the above referenced projects. The low bidder was Gunderson Brothers Cement Contractors for $54,549.50 (Alternate A) and $57,549.50 (Alternate B) with bids also received from Thomas & Sons and Kassa Construction. The latest engineer's estimate, which is shown in the bid abstract, is based on previous similar construction projects, those bids received for Holly Road and Preston Lane, and those factors discussed in our letter to the City dated March 23, 1998. It is our recommendation that the low bidder, Gunderson Brothers be awarded the contract with Alternate A or Alternate B being chosen at the City's discretion. Sincerely, BOLTON & MENK, INC. IMGIA C40,4_ A -- 7 . 01+t a-4- Marcus A. Thomas, E.I.T. Project Engineer cc: Steve Stadler, City of Hopkins 1515 East Highway 13 • Burnsville, MN 55337 -6857 Phone (612) 890 -0509 FAX (612) 890 -8065 1 MANKATO, MN FAIRMONT, MN SLEEPY EYE, MN BURNSVILLE, MN AMES, IA LIBERTY, MO An Equal Opportunity Employer KASSA CONSTRUCTION BLOOMI■GTON,: MN UNIT PRICE ' AMOUNT 1 00'000`£$ 1 1 09166$ 09166$ 1 0 00' 0001• 9ZZ$ '8$ $750.00 $1,368.00 100'08Z'L$ 00'009$ 00'00£$ 00'000`9$ 1 00'00Z$ 00'000'1.$ $2,800.00 I $450.00 $600.00 $10,080.00 $3,577.50 00'086$ 09'LL9`£$ $1,500.00 $720.00 $3,200.00 I $1,100.00 $225.00 I $150.00 $2,000.00 $1,500.00 1 $1,500.001 00'000`£$ I 96'£$ 96'£$ 00' 09'L$ 00'Z6$ 00'96$ $600.00 $56.00 00'00£$ 00'009'Z$ $500.00 $20.00 00'96$ 00'06$ $15.00 $28.00 $7.95 00'£$ 9 6'L$ 1 00•86$ 00'£$ $400.001 $5.00 $75.00 $75.00 00'009$ 00'000'Z$ i THOMAS & SONS ROGERS, MN UNIT PRICE AMOUNT 00'009`£$ $150.00 $500.00 $150.00 $3,240.00 $550.00 $1,710.00 1 00'06Z`17$ 00'096$ $2,600 001 $150.00 00'06$ 00'009'1.$ $3,360.00 $15.00 $20.00 $13,140.00 $7,650.00 $7,425.00 I $360.00 $2,000.00 $660.00 $1,600.00 $286.00 $240.00 I $250.00 I 00'09t$ 00 $2,000.001 00'009`£$ 00'06$ 00'£$ 00'14 00 00'96$ 00'66$ $150.00 $33.00 $1,300.00 $150.00 00 00'008$ $12.00 $0.50 $0.50 $36.50 $17.00 00'9$ 09'96$ 109'96$ 00'17$ 0£'6$ 0 $80.00 $125.00 $1.500 001 $150.00 GUNDERSONbROS. MINNEAPOLIS, MN _ UNIT PRICE AMOUNT 00 6$ $125.00 $250.00 $150.00 $5,467.50 $750.00 $1,026.00 $660.00 $6,396.00 $2,752.00 $586.00 $1,760.00 $250.00 $3,080.00 $390.00 $400.00 $15,120.00 $2,925.00 $3,870.00 I $225.00 $1,375.001 $680.00 $2,000.001 $187.00 $1,000 00 $1,050 00 $1,00 00'000` 6$ 00'9$ 09'Z$ 9L'9$ 00 100'6$ 00'96$ OZ'617$ 00'099$ $1,376.00 $586.00 $880.00 $25.00 $11.00 $13.00 $10.00 $42.00 $6.50 9L' 1 £$ 09'8$ 0016$ 9L'Z$ 198'0$ l 00'09Z$ 00'09£$ 00 000' i.$ 00'96$ 00'96$ NQINEER'S ESTIMATE UNIT PRICE AMOUNT 00'000'1.$ $175.00 $325.00 $150.00 $3,240.00 $337.50 $1,254.00 00'006'£$ 00'00L$ $1,800.00 $200.00 $1,200.00 $250.00 0 00' 00'9L8'L$ 00'009`Z I. $ 00'001'$ 100'096$ 00'9L8`L$ 1 00'009$ 00'000'Z$ $1,600.00 $220.00 $750 00 $450 00 $1,000.001 00'000`6$ I 09'9$ _- I 09'£$ 00'17$ 00'9$ 00'66$ 92.'9$ 00'0£$ 00'0 0 00'006$ $600.001 $25.00 00'6$ 00'06$ $10.00 $35.00 $17.50 09 0 00'96$ 00'17$ 00' 6$ 00'OOZ$ 00 9L$ 00'9£$ $750.00 $150 00 11NII LUMP SUM 13 Nil 13 Nll QA OS 13 Nil OA no OA OS 13 NIl HOV3 HOV3 HOV3 GA n3 HOV3 CIA no NOl'. QA OS CIA OS CIA no lVO GA OS __ 13 Nll Id OS r 13 Nil HOV3 LUMP SUM I EACH APPROX. QUANT. 09 09 069 '0£ 161 09 0£6 6 j 01. 0£ 09Z 0917 09£ 0i 09 0917 017 009 OZZ 9 CO N r- C '1111311 MOBILIZATION ■ ■ SAW CUT BITUMINOUS PAVEMENT SAWCUT CONCRETE PAVEMENT REMOVE CONCRETE CURB REMOVE BITUMINOUS PAVEMENT REMOVE CONCRETE PAVEMENT i COMMON EXCAVATION (EV)(P) CONNECT TO EXISTING STORM SEWER 12" RC PIPE SEWER CONSTRUCT CATCH BASIN, DES S -10 (24 "x36 ") SALVAGE AND REPLACE CASTING CASTING ASSEMBLY (NEENAH R- 3360 -A) SUBGRADE EXCAVATION (EV)(1) SELECT GRANULAR BORROW (LV)(1) 6" CONCRETE ALLEY PAVEMENT BITUMINOUS WEAR COURSE, TYPE 41 ■ BITUMINOUS BASE COURSE, TYPE 31 BITUMINOUS MATERIAL FOR TACK COAT 4" CONCRETE SIDEWALK CONCRETE CURB. TYPE V6 FURNISH AND INSTALL BOLLARD 4" SOLID WHITE LINE TURF RESTORATION INLET PROTECTION TRAFFIC CONTROL 1 I Z V... e- NMettACOls-000) . Z I 66 ;CD�� 96 L6 96 96 I OZ I 66 I ZZ I 6Z 17 Z I £Z 9Z 9Z 9 Z 1 LZ CO co ci Ei v 8 Z -z0 1 w u) aY 0. m co a_ Q .- =m cv ALTERNATE A (BITUMINOUS PARKING AREA) KASSA CONSTRUCTION E).OQMINGTGN, MN UNIT PRICE AMOUNT 1 00'000`£$ $118.501 $197.50 I 00' 0 0L`8$ 0 0'9Z Z $ $750.00 I $1,368.00 I ocrosz`L$ 00'009$ 1 00'00£$ 0 0'000`5$ 00 00'000'1.$ $2,800.00 I $450.00 $600.00 $14,280.00 $2,685.00 $2,685.00 $180.00 $1,500.00 $720.001 $3,200.00 $1,100.00 $225.00 00 00'05I. $ $1,500.00 I $1,500.00 1 00'71.1'89$ 00'000`£$ I 6'£$ 6'£$ 00'01$ 09'1$ $15.00 $12.00 $600.00 $56.00 00'00£$ 00'009'Z$ 00 00'005$ $10.00 $15.00 00 00'91$ 196'9$ 96'9$ 00'£$ I owa $18.00 $400.00 $5.00 $75.00 00 00'9L$ $500.00 $1,500.00 THOMAS & SONS ROGERS, MN UNIT PRICE AMOUNT 00'009`£$ $90.00 $400.00 $150.00 $3,240.00 $500.00 $1,710.00 $200.00 $4,290.00 $2,600.00 $150.00 $1,600.00 $50.00 100'91$ 00'09£`£$ $20.001 $17,850.00 $4,500.001 $4,800.00 $360.001 $1,750.00 $660.001 $1,600.00 $286.00 $240.00 $250.00 I $1,500.00 $450.00 I $2,000.00 1 00' bZ L`9S$ 00 00 00'E$ 00'7$ 00'9$ $10.00 $15.00 00'££$ 00'003 $1,300.00 $150.00 00'9$ 00'008$ 09'0$ 00'Z L$ 1 00"9£$ 09 00'9 L 00'91.$ I 09'£$ I 00 100 09'9 L$ 00'09$ 0E11 100'009'1.$ I 00'9Z3 1 00 00'091$ 'GUNDERSON bROS, MINNEAPOLIS, MN UNIT PRICE AMOUNT 00'0 1.$ $75.00 $250.00 $150.00 $5,467.50 $750.00 $1,026.00 $660.00 $6,396.00 $2,752.00 $586.00 $1,760.00 $250.00 1 00'06£$ 00'090`£$ $400.00 $19,380.00 $2,475.00 I $3,225.00 1 00'00£` 1.$ 00 $640.00 I $2,000.00 1 00'97$ 00'181$ I 00'000`I.$ 00'0£$ $1,050.001 $1,000.00 0S'67S`LS$ 00'0 L$ 00'9$ 09'Z$ 9L'9$ 00'9$ 00'6$ 00'91.$ OZ'6•$ 00'099$ $1,376.00 $586.00 $880.00 $25.00 0 00'I. $ 00'9£$ 00'01.$ 19L'01.$ 9Z'8$ 09'Z$ 9L'£$ $16.00 $250.00 I 00'9L$ 98'0$ $15.00 $1,000.00 1 00'000` L$ 0 ENGINEER'S ESTIMATE UNIT PRICE AMOUNT 00'000` 1.$ $105.00 $325.00 00'07Z`E$ 00'091.$ $337.50 $1,254.00 1 00'006`£$ 00'00L$ $1,800.001 1 $200.00 $1,200.00 $250.00 $2,800.00 $270.00 $400.00 $17,850.00 00'09Z`9$ 00'09Z`9$ 1 00 . 000`Z$ 00'091$ $600.001 $1,600.00 $220.001 $105.00 $150.001 $750.00 100'000'1.$ 00'097$ 1 09'90£`£9$ $1,000.00 09'9$ 09'£$ 00'7$ 00'9$ 00'11$ 9L'9$ 00'0E$ 00'00L$ 00'00Z$ 00'006$ $600.00 $25.00 00'6$ 00'01$ $10.00 $35.00 09'1.14 09'11$ 00 09 00'00Z$ 00'94$ 1 00•9£$ 00'14 $75.00 $750.00 $150.00 $1,000.00 „.INA LUMP SUM 13 NIl Id Nil OA OS 13 NIl OA no OA DS Id N11 HOV3 HOV3 HOV3 OA no HOV3 I OA n0 Nall CIA DS OA no I OA OS CIA as I 13 OS IVO HOV3 l� Nll HOV3 13 NIl EACH LUMP SUM EACH LUMP SUM : APPROX. QUANT. 09 0£ 01.9 0£ 74 1109 0£ 1. 01. Z 0£ 09Z 01.9 07 I'� 00£ 00£ 009 09 8 07 0Z N a- M � 11 MOBILIZATION ■ SAW CUT BITUMINOUS PAVEMENT SAWCUT CONCRETE PAVEMENT REMOVE CONCRETE CURB REMOVE BITUMINOUS PAVEMENT REMOVE CONCRETE PAVEMENT COMMON EXCAVATION (EV)(P)1 1 CONNECT TO EXISTING STORM SEWER 12" RC PIPE SEWER CONSTRUCT CATCH BASIN, DES S -10 (24 "x36 ") SALVAGE AND REPLACE CASTING CASTING ASSEMBLY (NEENAH R- 3360 -A) COARSE FILTER AGGREGATE (LV)(1) AGGREGATE BASE, CLASS 5 (P) SUBGRADE EXCAVATION (EV)(1) SELECT GRANULAR BORROW (LV)(1) 6" CONCRETE ALLEY PAVEMENT BITUMINOUS WEAR COURSE, TYPE 41 BITUMINOUS BASE COURSE, TYPE 31 BITUMINOUS MATERIAL FOR TACK COAT 4" CONCRETE SIDEWALK I CONCRETE CURB, TYPE V6 FURNISH AND INSTALL BOLLARD 4" SOLID WHITE LINE PAINTED HANDICAP SYMBOL PAINTED CROSS HATCHING AT HANDICAP STALLS TURF RESTORATION INLET PROTECTION TRAFFIC CONTROL TOTAL w Z r NM�lncOt�000) Z I L 1. 71. I 91. I 91. 91. 1 LL OZ I 61. NM I N N i 1 9 Z I 9Z I 8Z LZ CI cu us Z Z ' 1_ ^ _ )2us U) QZ CO 0. N ALTERNATE B (CONCRETE PARKING AREA) BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, that the bid of Gunderson Brothers Cement Contractors in the amount of $57,549.50 is the lowest responsible bid for the reconstruction of an alley between 1 lth/l2th Avenues North adjacent to the U S West Building and the Hopkins Center for the Arts, City Project 97 -16 and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of the City of Hopkins this 19th day of May, 1998. ATTEST: Terry Obermaier, City Clerk CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 98 -28 RESOLUTION FOR AWARD OF BID ALLEY RECONSTRUCTION CITY PROJECT 97 -16 Charles D. Redepenning, Mayor