IV.3. Resolution Awarding Contract for 2024 City-Wide Water Meter Replacement – City Project 2024-001; Moilanen CITY OF HOPKINS City Council Report 2024-024 To: Honorable Mayor and Council Members Mike Mornson, City Manager From: Sean Moilanen, Utilities Superintendent Date: March 4, 2024 Subject: Resolution Awarding Contract for 2024 City-Wide Water Meter Replacement – City Project 2024-001 _____________________________________________________________________ RECOMMENDED ACTION MOTION TO Adopt Resolution 2024-020 Awarding Contract for 2024 City-wide water meter replacement, City Project 2024-001. OVERVIEW The bid opening for the 2024 City-wide water meter replacement project was February 23, 2024. The lone bid for the base bid was submitted by Ferguson Waterworks. The base bid was $2,099,999.55, Ferguson Waterworks has a good reputation with previous similar projects in the wider metro area. Staff is recommending the award of the project contract to Ferguson Waterworks. SUPPORTING INFORMATION • Resolution 2024-020 • Abstract of Bid UTILITIES ANALYSIS OF ISSUES Project Summary The existing water meters in Hopkins are at the end of their serviceable life. Failing batteries and obsolete reading technology has made meter reading difficult and inefficient. On November 21, 2023, City Council approved the 2024 CIP which included city-wide water replacement. All properties in Hopkins will receive a new water meter with MXU radio to replace the obsolete meters. A new fixed radio network will also be installed. The new meters and fixed radio system will allow water meter readings to be automated. This will eliminate the current meter reading system which requires staff to drive all streets in the city to collect meter data. Fuel usage and staff time required for meter readings will be greatly reduced. A pilot project with approximately 130 meters has been operational for approximately a year without issue. The project will be completed in phases with the project starting with the oldest meters and radios first. Bid Results and Analysis Contractor Base Bid Ferguson Waterworks $2,099,999.55 Engineers Estimate $1,913,975.00 Project Costs Based on the bid the total estimated project cost is $2,099,999.55, while slightly over the engineers estimate, the project remains under the CIP budgeted amount of $2,200,000.00. This item will be paid for from the water fund. Project Schedule Award Contract March 4, 2024 Begin Project Spring 2024 Complete Project Summer 2025 CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 2024-020 RESOLUTION FOR AWARD OF CONTRACT 2024 CITY-WIDE WATER METER REPLACEMENT CITY PROJECT 2024-001 BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, that the lowest bid of Ferguson Waterworks in the amount of $2,099,999.55 is the lowest responsible bid for the 2024 City-wide water meter replacement, City Project 2024-001, and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of the City of Hopkins, Minnesota, this 4th day of March 2024. By___________________________________ Patrick Hanlon, Mayor ATTEST: _____________________________________ Amy Domeier, City Clerk Abstract City of Hopkins Citywide Water Meter Replacements Hopkins, MN BMI Project No. 0T1.130236 Bid: 02/23/2024 09:30 AM CST Engineer Estimate Ferguson Water Works - Blaine Section Title Line Item Item Description UofM Quantity Unit Price Extension Unit Price Extension 1 3/4" ULTRASONIC WATER METER EACH 2946 $185.00 $545,010.00 $200.00 $589,200.00 2 1" ULTRASONIC WATER METER EACH 130 $245.00 $31,850.00 $240.00 $31,200.00 3 1.5" ULTRASONIC WATER METER EACH 204 $780.00 $159,120.00 $700.00 $142,800.00 4 2" ULTRASONIC WATER METER EACH 94 $950.00 $89,300.00 $800.00 $75,200.00 5 3" ULTRASONIC WATER METER EACH 40 $2,865.00 $114,600.00 $2,700.00 $108,000.00 6 4" ULTRASONIC WATER METER EACH 21 $3,685.00 $77,385.00 $3,500.00 $73,500.00 7 6" ULTRASONIC WATER METER EACH 2 $6,280.00 $12,560.00 $6,500.00 $13,000.00 8 RADIO FREQUENCY METER INTERFACE UNIT EACH 3437 $110.00 $378,070.00 $115.00 $395,255.00 9 INSTALL METER AND RADIO - UP TO 1" METER EACH 3076 $100.00 $307,600.00 $125.00 $384,500.00 10 INSTALL METER AND RADIO - 1.5" TO 2" METER EACH 298 $250.00 $74,500.00 $420.00 $125,160.00 11 INSTALL METER AND RADIO - 3" METER EACH 40 $350.00 $14,000.00 $920.00 $36,800.00 12 INSTALL METER AND RADIO - 4" METER EACH 21 $475.00 $9,975.00 $1,295.00 $27,195.00 13 INSTALL METER AND RADIO - 6" METER EACH 2 $690.00 $1,380.00 $2,295.00 $4,590.00 14 CONFINED SPACE ENTRY EACH 2 $2,500.00 $5,000.00 $1,250.00 $2,500.00 15 EXISTING WATER SERVICE INVENTORY EACH 2045 $25.00 $51,125.00 $1.59 $3,251.55 16 FIXED ADVANCED METERING INFRASTRUCTURE (AMI)LUMP SUM 1 $30,000.00 $30,000.00 $74,100.00 $74,100.00 17 AMI SYSTEM SOFTWARE LUMP SUM 1 $12,500.00 $12,500.00 $13,748.00 $13,748.00 BASE BID TOTAL:$1,913,975.00 $2,099,999.55