Loading...
CR 95-41 Finance Computer System I Y () c"j r . March 2, 1995 o P 1\ \ ~ Council Report 95-041 FINANCE COMPUTER SYSTEM Pro Dosed Action. Staff recommends adoption of the following motion: Move to approve the Purchase of a new Finance Computer System from Precision Computer Systems. Overview, The existing computer system was installed in 1984 and upgraded in 1987. The present system is inadequate in both hardware and software applications. The proposed system will provide much needed increase in capacity and allow for installation of a network system. Primary Issues to Consider. 0 Replacement of the Finance System was in the Equipment Replacement Plan for 1994 at $70,200. 0 Purchase of a network system is scheduled in the Equipment Replacement Plan for 1995 at $24,300. . SUDDortinS! Information. 0 Background 0 Executive Summary - Giske Consulting Group (/~ olm E. Schedler Finance Director . e CR95-041 Page 2 Back2round. The standard useful life of a computer system, hardware and software, is generally five to eight years. The first computer used in the Finance Department replaced an old bookkeeping machine in 1984. In 1987, a partial upgrade was made for some hardware and software. At present we are limited, at times, as to the ability to perform all required operations. At month end and year end we must download information on a floppy disk (take the application software and data off the present system) in order to run current payroll or utility billing and then restore the information for daily inquiry and updates. This is very time consuming, especially in light of current technology, and is prone to errors which have frequently occurred in this process. In July, 1994, the Council authorized the engagement of the Giske Consulting Group. Mr. Giske, along with input from all members of the Finance Department, developed an RFP for a new system. Our goal was to replace the existing functions with better software, add new functions - fixed e assets and miscellaneous billing, and replace most of the hardware with current state of the art equipment for a faster operation. Present newer PC computers will be retained as work stations. Bids were solicited in September, 1994. Replies were received from seven different companies. Mr. Giske and Finance reviewed the bids and selected three vendors to make demonstrations of their system to the City. The major work then began in earnest to clarify how certain functions would be handled to the Citis satisfaction. Also, we needed to make some modifications to ensure comparable bids. Mr. Giske interviewed all department heads to understand their needs and plans for use of a network and direct access to the finance computer for information only purposes. A detailed report was prepared by Giske Consulting and discussed by staff. The executive summary higWights the detailed report. Based on these reports and involvement with the vendors through demos, letters and phone calls, staff recommends purchase of the Precision Computer Systems. . e CR95-041 Page 3 Costs Purchase - Hardware, Software & Installation $81,700 Annual Maintenance on Hardware, Software & Network $10,250 Plus cabling and installing of network depends on number of units connected to network and distance from main computer. Budget Finance & Network $94,500 . . . I ! . I . I , . CITY OF HOPKINS e Financial System Request For Proposals Executive Summary THE PROJECT This document summarizes the results of a project conducted by Ray Giske of Giske Consulting Group on behalf of the City of Hopkins. The purpose of the project was to acquire financial system software and hardware for the City through the use of the Request for Proposals (RFP) process. Specifically, the project included acquisition of software to support the financial accounting, payroll, and utility billing functions within the City. The Request for Proposals (RFP) process included three major steps; 1 ) A Request for Proposals was prepared which outlined In detail the City's requirements for application software along with forms detailing the data to be provided by the vendors; . 2) The proposals received were evaluated which resulted in the selection of three primary vendors; 3) The primary vendors were invited to provide on-site demonstrations of the application software after which a final vendor was selected. Additional detail on the project as well as the results is available in a companion document, the project's Final Report. PROPOSALS RECEIVED Table 1 below provides a summary of the proposals received. The table lists the vendors submitting proposals, the total one-time costs, the total recurring costs for maintenance on the proposed hardware and software, along with comments regarding the evaluation. Proposals were received from a total of seven vendors offering a significant range of options for the City to choose among. Four of the vendors proposed a PC-based configuration while three vendors proposed hardware configurations based on mid-range computers. All vendors were able to propose a complete suite of application software although there were substantial differences in the ways the application software was implemented. The one-time costs for the proposed configurations ranged from a low of $34,376 to a high of $141,794. . Giske Consulting Group 1 CITY OF HOPKINS Financial System Request For Proposals Executive Summary . Table 1 Financial System Request for Proposals Proposal Summary VENDOR ONE-TIME ANNUAL COMMENTS COSTS COSTS Banyan Data Systems $34,376 $5,358 One of three finalists; However, software lacked significant features. Black Diamond (HTE) 141,794 8,972 Proposed costs were higher than other vendors wi comparable equipment. Eden Systems 59,510 5,663 Firm equipment configuration not included in proposal. LOGIS 19,260 48,476 Combined initial and annual costs resulted in most expensive option. New World Systems 132,943 9,729 One of two finalists. Precision Computer 80,690 9,703 Recommended Option. Systems Tautges, Redpath & Co 80,300 11, 550 Firm equipment configuration not included . (Fund Works) in proposal. PRIMARY VENDORS After reviewing the proposals and contacting the vendors for clarification and additional information, three primary vendors were selected and invited 10 demonstrate the applicatioll software for the Finance Dept. staff. The primary vendors included Banyon Data Systems, Precision Computer Systems, and New World Systems. The demonstrations were scheduled one vendor at a time (one day each) over a 2 week period. All demonstrations were scheduled at the City of Hopkins City Hall. After meeting with the primary vendors, customers/users for some of the vendors were contacted to discuss the features, level of satisfaction, and service provided by the vendors. In addition, a number of Questions were asked the vendors and issues were discussed which provided clarification on service and application software capability. Finally, adjustments to hardware configurations were made in order to provide comparable configurations both for purposes of comparing costs and to more accurately meet the needs of the City. . Giske Consulting Group 2 CITY OF HOPKINS Financial System Request For Proposals Executive Summary . Table 2 Financial System Request for Proposals Finalists Comparable Configurations COMPONENT PRECISION COMPUTER SYSTEMS NEW WORLD SYSTEMS APPLICATIONS General Ledger General Ledger Budgeting Budgeting Accounts Payable Accounts Payable Purchase Order Purchase Order Accounts Receivable Accounts Receivable Payroll Payroll Utility Billing Utility Billing Fixed Assets Fixed Assets SYSTEM SOFTWARE Novell 3.12 05/400 Progress Novell 3.12 COBOL Run-Time Client Access/400 Results RPG Query/400 EQUIPMENT INTEL Pentium 100 PCs rBM AS/400 Mini-Computer 2 Gigabytes Disk 2 Gigabytes Disk Backup Storage Device Backup Storage Device . Local Area Network Local Area Network Laser Printer Laser Printer Hi-Speed Printer Hi-Speed Printer Modem Modem UPS UPS COST: One-Time $81,700 $107,448 Annual Mtnce. 51,250 53,165 RECOMMENDED NEXT STEPS Based on the responses received, the approaches presented by the vendors and the analysis conducted, we believe that the proposals presented by either Precision Computer Systems or New World Systems could satisfactorily meet the needs of the City. The vendors have the following strengths in common: Both have full-featured software; Both have strong and loyal customer base; Both have strong commitment to the municipal government sector; Both appear to have made a strong commitment to the upgrading software and hardware to continue to be current; Both provide substantial improvements over the current software and fully meet the needs of the city. . We believe, however, that the Precision Computer Systems configuration most closely meets the needs of the City. The major strengths of the Precision Computer System proposal are: Giske Consulting Group ~ 3 CITY OF HOPKINS Financial System Request For Proposals Executive Summary . 1. The proposed one-time costs are less than the New World Systems proposal by more than $25,000. A very significant portion of the cost difference is due to the central computers proposed. Precision Computer Systems proposed a local area network (LAN) using an Intel Pentium-1 00 processor as the server. New World System proposed an IBM AS/400 mid-range computer which requires a significantly higher investment. 2. The Precision Computer Systems proposed hardware and system software configuration is a PC-based local area network and offers a more uniform platform environment throughout the City. The City appears to be committed to implementing computer applications which operate on local area networks. The Precision Computer Systems proposal is consistent with this approach while the New World Systems proposal would require the City to support two substantially different operating environments. The New World System proposal would be more acceptable if the City were committed to implementing more applications in a central computer environment. The limitations of Precision Computer Systems proposal, however, include: 1. While the Payroll and Utility Billing applications have recently been re-written using a fourth generation language, financial applications, those to be use in the long term, are currently in the final stages of development. Consequently, the City's financial records may need to be converted twice, once to the new vendor and once to the . newly programmed application. 2. The vendor has a history of supporting the UNIX operating system and is relatively new to the Novell operating system. Based on our analysis, the comments of the City staff following a review of user documentation and vendor demonstrations, we recommend the City proceed with the acquisition of the Precision Computer Systems application software. In order to do so, one of the first steps should be to meet with the vendor and begin the lrTlplementation planning. VVe believe the following steps should be taken: 1 . Make final decision on the vendor and on the specific application modules to be acquired at this time. Certain applications were proposed (e.g., cash receipting) but were not necessarily considered a requirement for the City. 2. Meet with the selected vendor to make final adjustments to the proposed hardware configuration to more accurately reflect the needs of the City. 3. Review the standard contract offered by the vendor and ensure that written and verbal considerations made since the initial proposal was received are, in fact, included. 4. Prepare a more detailed implementation plan including dates for system installation and training, data conversion, and full implementation. . ***** Giske Consulting Group ~ 4 . . . ._____ ____ ._.____n___ .__. ____________ -------