IV.6. Resolution Accepting Bids for the 2024 SCADA Fiber Project – City Project 2024-002; Moilanen CITY OF HOPKINS City Council Report 2024-036 To: Honorable Mayor and Council Members Mike Mornson, City Manager From: Sean Moilanen, Utilities Superintendent Date: April 2, 2024 Subject: Award Contract; SCADA Fiber Project – City Project 2024-002 _____________________________________________________________________ RECOMMENDED ACTION MOTION TO Adopt Resolution 2024-028, Resolution Accepting Bids, 2024 SCADA Fiber Project, City Project 2024-002 OVERVIEW This project is part of the 2024 CIP that was approved on November 21, 2023. The bid opening for the 2024 SCADA fiber project was held March 22, 2024. There were bids from Electrical Production Services, Inc, Honda Electric, Inc and Castrejon Incorporated. Electrical Production Services, Inc came in lowest. The base bid was $266,034.10. Electrical Production Services, Inc has a good reputation with previous similar projects in the wider metro area. Staff is recommending award of the project contract to Electrical Production Services. SUPPORTING INFORMATION • Resolution 2024-028 • Abstract of Bid • Bid Tab UTILITIES ANALYSIS OF ISSUES Project Summary Our current system of monitoring and controlling our critical infrastructure can be vulnerable to hackers and environmental conditions. Our current radio signals can be intercepted by unauthorized individuals using radio scanners or other devices. By converting the current system to fiber optic, our critical infrastructure will be much more protected from unauthorized people, and environmental conditions. Bid Results and Analysis Contractor Base Bid Electrical Production Services, Inc $266,034.10 Honda Electric, Inc $507,670.00 Castrejon Incorporated $594,042.40 Engineers Estimate $324,050.00 Project Costs Based on the bid the total estimated project cost is $266,034.10. This bid comes in under the engineers estimate, the project is under the CIP budgeted amount of $350,000.00. This item will be paid for from the water fund. Project Schedule Award Contract April 2, 2024 Begin Project Spring 2024 Complete Project Fall 2024 CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 2024-028 RESOLUTION FOR AWARD OF CONTRACT 2024 SCADA FIBER PROJECT 2024-002 BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, that the lowest bid of Electrical Production Services in the amount of $266,034.10 is the lowest responsible bid for the 2024 SCADA Fiber, City Project 2024-002, and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of the City of Hopkins, Minnesota, this 2nd day of April, 2024. By___________________________________ Patrick Hanlon, Mayor ATTEST: _____________________________________ Amy Domeier, City Clerk Line Item Item Description Unit Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 MOBILIZATION LUMP SUM 1 $10,000.00 $10,000.00 $1.00 $1.00 $25,000.00 $25,000.00 $4,000.00 $4,000.00 2 TRAFFIC CONTROL LUMP SUM 1 $5,000.00 $5,000.00 $3,500.00 $3,500.00 $7,800.00 $7,800.00 $2,500.00 $2,500.00 3 1.25" NMC DIRECTIONAL BORE LIN FT 20600 $7.50 $154,500.00 $8.22 $169,332.00 $9.85 $202,910.00 $19.00 $391,400.00 4 30" X 48" X 36" HANDHOLE EACH 26 $1,000.00 $26,000.00 $1,153.85 $30,000.10 $3,625.00 $94,250.00 $2,200.00 $57,200.00 5 144 STRAND FIBER OPTIC CABLE LIN FT 11000 $3.00 $33,000.00 $3.70 $40,700.00 $4.50 $49,500.00 $4.21 $46,310.00 6 TRACER WIRE LIN FT 10500 $1.00 $10,500.00 $0.20 $2,100.00 $0.28 $2,940.00 $0.65 $6,825.00 7 LOCATE POST EACH 26 $100.00 $2,600.00 $45.00 $1,170.00 $180.00 $4,680.00 $132.00 $3,432.00 8 3" BITUMINOUS PATCH SQ YD 400 $50.00 $20,000.00 $18.00 $7,200.00 $90.00 $36,000.00 $22.80 $9,120.00 9 4" BITUMINOUS STREET PATCH SQ YD 150 $65.00 $9,750.00 $18.00 $2,700.00 $96.00 $14,400.00 $25.60 $3,840.00 10 4" CONCRETE WALK SQ FT 725 $20.00 $14,500.00 $10.00 $7,250.00 $22.00 $15,950.00 $30.40 $22,040.00 11 6" CONCRETE WALK/DRIVEWAY SQ YD 60 $150.00 $9,000.00 $10.00 $600.00 $198.00 $11,880.00 $60.30 $3,618.00 12 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 180 $40.00 $7,200.00 $5.50 $990.00 $58.00 $10,440.00 $97.43 $17,537.40 13 EROSION CONTROL LUMP SUM 1 $5,000.00 $5,000.00 $1.00 $1.00 $6,500.00 $6,500.00 $2,220.00 $2,220.00 14 TOPSOIL CU YD 180 $50.00 $9,000.00 $0.50 $90.00 $115.00 $20,700.00 $60.00 $10,800.00 15 HYDROMULCH AND SEED MIX SQ YD 1600 $5.00 $8,000.00 $0.25 $400.00 $2.95 $4,720.00 $8.25 $13,200.00 Base Bid Total:$324,050.00 $266,034.10 $507,670.00 $594,042.40 Honda Electric,Inc. Castrejon Incorporated Hopkins 2024 City Fiber Project 0T1.132920 (#9007138) Owner: Hopkins MN, City of Solicitor: Bolton & Menk, Inc. 03/22/2024 10:00 AM CDT Electrical Production Services, Inc.Engineer Estimate H:\HOPK\0T1132920\6_Plans-Specs\C_Bids Received\2024 City Fiber_Bid Tab.docx BID TABULATION 2024 City Fiber Project City of Hopkins Hopkins, MN 0T1.132920 Bid Taken: Friday, March 22, 2024 Addendums: None Time: 10:00 a.m. BIDDERS TOTAL BID 1 Electrical Production Services, Inc. $266,034.10 2 Honda Electric, Inc. $507,670.00 3 Castrejon Incorporated $594,042.40