VII.2. Fee Schedule Review; Bishop
CITY OF HOPKINS
Memorandum
To: Honorable Mayor and Council Members
Mike Mornson, City Manager
From: Nick Bishop, Finance Director
Date: April 2, 2024
Subject: Fee Schedule Review
_____________________________________________________________________
PURPOSE
To provide input on proposed changes to various fees charged by the City.
INFORMATION
Beginning in the Summer of 2021 staff has reviewed various fees charged by the City to
ensure that the rates accurately reflect the cost to provide a service. As part of this
continued effort City Council approved fee increases in November 2021 and July 2022.
The review of fees included staff time, equipment, technology costs, supplies and space
allocation. The objective of this fee review is to have fees correctly aligned with the cost
of service.
November 16, 2021
City Council approved fee increases for Planning and Zoning Application Fees, which
included base fees, escrows and new fees related to traffic studies, environmental
studies and applications for financial assistance. The approval also established solar
fees for residential and commercial and increased park dedication fees.
July 19, 2022
City Council approved increases for rental licensing, notary services, alarm registrations
and fire inspections.
Newly Proposed Fees
Tree Assessment Fee: The City’s Forestry division inspects public and private trees for
diseases, such as Dutch Elm Disease, Oak Wilt and Emerald Ash Borer. Diseased trees
on private property must be removed at the owner’s expense. Tree removal can be
expensive and the City offers homeowners a program to assess the cost of removal to
their property taxes over a ten-year period with interest. Administering the program
requires staff time and other overhead costs. There is currently no fee associated with
the program.
Finance Department
Water Meter Reading Fee: The utilities division will install smart water meters
throughout the City in 2024. The new MXU radio meters have many advantages
including the ability to automatically download water usage. Currently, meters require a
utility staff person to drive every street of Hopkins to collect data. A non-radio meter can
be installed, but would require more staff time and other resources to collect data. A fee
will offset the additional cost.
Electric Vehicle Supply Equipment Permit: The City has created a permit and permit
checklist for Electric Vehicle Supply Equipment (EVSE). A permit is only required for
projects where EVSE will be directly wired to the electrical system. Vehicles with
internal charging units can plug into existing 120-volt outlets, although that method
takes the vehicle longer to charge than if it were plugged into EVSE. The permit also
supports the City's work towards incorporating best practices related to electric vehicles
and equipment into City processes. EVSE permit fees are identified for commercial and
residential projects respectively.
Use determinations: The Zoning Administrator is asked to make a determination on a
proposed use that is not listed in the zoning ordinance. Staff would review a submitted
application which describes the characteristics of the proposed use and assesses
whether it would fit within a category of uses or whether it is similar to a use that is
described.
Administrative site plan review: Residential buildings with 4 or fewer units; smaller new
buildings and expansions; and certain site improvements are administratively reviewed.
There is a range of complexity within these types of projects. Simpler projects such as
residential additions, garages, and decks require minimal amounts of staff time for
review. These project types had previously been reviewed for zoning compliance as
part of the building permit process; however, planning staff time is not accounted for in
building permit fees.
FUTURE ACTION
If supported by City Council, staff will bring forward the attached fee changes for
approval.
Fees Reviewed (from Appendix A of City Code)Current Proposed
Dogs, spayed or neutered $22.00 $25.00
Dogs, not spayed or neutered $30.00 $30.00
Chicken License $150.00 $125.00
Impound Fee (1st offense)$35.00 $70.00
Impound Fee (2nd offense)$45.00 $100.00
Impound Fee (Additional Offenses)$35.00 $100.00
Driveway Permit $40.00 $40.00
Street Excavation-residential $35.00 $50.00
Residential Fences $35.00 $65.00
First and Second Fire Inspection (per hour)2 $60.00 $115 for first hour + 60/additional
Third Inspection (per hour)2 $120.00 $120/ hour
Fourth and additional inspections (per hour)2 $180.00 $180/hour
Concept review1 $350.00 $375.00
Site plan review1 $500.00 $550.00
Conditional use permit1 $800.00 $900.00
Conditional use permit for fences, signs and other uses1 $150.00 $175.00
Variance-Residential (4 or fewer units)1 $500.00 $550.00
Variance-All Other1 $500.00 $800.00
Vacate street or alley1 $500.00 $550.00
Rezoning or text amendment1 $1,000.00 $1,100.00
Administrative subdivision1 $300.00 $325.00
Subdivision approval, preliminary1 $1,000.00 $1,100.00
Subdivision approval, final1 $1,000.00 $1,100.00
Subdivision, combined application1 $1,800.00 $2,000.00
Planned unit development1 $2,500.00 $2,750.00
Comprehensive plan amendment1 $2,000.00 $2,200.00
Park dedication fee per residential unit1 $5,000.00 $5,500.00
Environmental review1 $1,000.00 Actual Costs + Deposit based on scope
Traffic/travel demand management study1 $500.00 Actual Costs + Deposit based on scope
Zoning verification letter1 $100.00 per parcel $110 per parcel
Extension of approvals1 $250.00 $275.00
Planning and Zoning
Fire Inspection
Fences
Engineering
Animals
Fees Reviewed (from Appendix A of City Code)Current Proposed
Application for city financial assistance1 $2,000.00 $2,200.00
Zoning appeal1 $350.00 $375.00
Interim use permit1 $800.00 $900.00
Alarm Registration $30.00 $35.00
Snow Removal - Residential $2.00 per foot $100.00
Snow Removal - Commercial $3.00 per foot $250 or actual costs
Initial Inspection $100 + $25 Per Dwelling Unit Inspected $100 + $100 Per Dwelling Unit
First Re-Inspection $50.00 $150.00
Second Re-Inspection $75.00 $225.00
Each Additional Re-Inspection Double Previous Amount Double Previous Amount
License - Single Family Units2 $100.00 $100.00
License - Buildings with 3 or More Units2 $100 per building + $10 per unit $200 per building + $10 per unit
Temporary Signs $50.00 $75.00
Permanent Signs $100.00 $75.00
Special Event Permit $50.00 $375.00
1 - Previously Reviewed on November 16, 2021
2 - Previously Revied on July 19, 2022
Newly Proposed Fees Current Proposed
Tree Assessment Fee N/A $325.00
Water Meter Reading Fee (Radio Opt Out)N/A $25 Per Month
Inspections
Electric Vehicle Supply Equipment Permit-Residential N/A $80.00
Electric Vehicle Supply Equipment Permit-Commercial N/A $160.00
Planning and Zoning
Use Determination N/A $150.00
Administrative Site Plan Review-Commercial N/A $350.00
Administrative Site Plan Review-Residential (4 or fewer units) New Build/Addition N/A $100.00
Administrative Site Plan Review-Residential (4 or fewer units) Decks N/A $50.00
Planning and Zoning (continued)
Public Works
Rental
Signage
Miscellaneous
Police
Public Works