CR 95-157 Approval Of Agreement With RCM, INC e . . 1 Y o September 1, 1995 u m ',. '" o ~ P K \ council Report: 95-157 APPROVAL OF AGREEMENT WITH RCM, INC. FOR PROFESSIONAL SERVICES RELATING TO DESIGN AND CONSTRUCTION OVERSIGHT OF A SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM Proposed Action. Staff recommends adoption of the following motion: "Move that Council authorize the Mayor and city Manager to enter into an aqreement with ReM, Inc. for professional services as they relate to desiqn and construction oversight of a supervisory control and data acquisition (SCADA) system.1I overview. A SCADA system is a computer-based monitoring and control system. This project will upgrade our existing water and sewer control system. The current system relies on phone company lines for transmission which have reliability problems, and high rental costs. The service of the system is becoming difficult, due to the hybrid design and combination of manufacturer's equipment. An upgrade to a newer electronic and radio transmitted system would allow more reliable monitoring, easier service, more control of functions in response to changing conditions and especially allow us faster response to sewer station problems. Radio or beeper information will be able to be relayed to the operating staff with regard to system status. Three bids were received for these professional services. BIDDER COST RCM Sebestan & Assoc OSM $ 9,000 $13,900 $17,500 Primary Issues to Consider o Summary of proposal o Project funding and schedule o Staff Recommendation Supporting ~C~ proposal,~ ~\~, Steven J. stadler, Public o Works Director council Report: 95-157 Page 2 . Analysis of Issues o Summary of proposal RCM's proposal will provide the following services at a not-to exceed cost of $9,000 Analysis of present individual control systems Define the requirements of the SCADA to existing local control interfaces Design the SCADA control system with Programmable Logic Controller (PLC) remote telemetry units, personal computer interface, and radio telemetry Develop equipment supplier pre-qualifications Construction oversight Individual site (wells, lift stations, towers, plant) system check-out Final system check-out o Project funding and schedule Project design will be completed by March, 1996. Construction should be completed by February, 1997. This project, including design and construction, will be funded as follows: e Water Fund: Sewer Fund: $81,500 $60,000 The project is included in the current CIP as a 1995/96 project. o Staff Recommendation staff recommends that Council authorize an agreement with RCM. RCM has the necessary staffing and SCADAjcontrol system project experience to successfully complete this design. It will also be beneficial to have RCM complete this work as it meshes will with ReM's Moline Wellhouse (Well #1) schedule and design. . 08/22/95 11: 18 . 1.Clll rieke canoll muller . ass?ciates, inc. engmeers arcllilects land surveyors equal opportunity employer .10901 red circle drive box 130 minnetonka, minnesota 55343 612-935-6901 fax 612-935-8814 '5'612 935 8814 ReM ASSOCIATES ~ 0021004 August 22, 1995 City of Hopkins Attn: Mike Lauseng 1010 1 st Street Hopkins, MN 55343-7573 Dear Mr. Lauseng: We are pleased to have this opportunity to submit this proposal to design and prepare contract documents for the installation of a SCADA system to monitor and control the City of Hopkins' water system and sewage collection system. We understand that the Hopkins water system includes: Three wells, One water treatment plant with two gravity filters, One booster pumping station with a ground storage reservoir and Two elevated storage tanks, one with a ground storage reservoir. And that the Hopkins sewage collection system includes seven lift stations. Under this proposal, we will: Examine the present control strategy in each facility to determine: The extent to which the proposed SCADA system should supplant and/or supplement individual local control systems. The feasibility of interconnecting each individual control system with the proposed SCADA system and the optimum method of making such interconnections. Design the proposed SCADA system, including any required modification to and interconnection with existing local control systems. The design of the SCADA system will provide: Continuous monitoring of the status (runlstop) and of the hoW's of operation of pumps and other significant pieces of equipment. Immediate reporting of abnormal conditions such as pump failure, power failure, flooding or freezing. Recording and reporting of flows and electrical demands, both instantaneous and integrated values. 08/22195 . . . 11: 19 '5'612 935 8814 RCM ASSOCIATES I4J 003/004 Mr. Mike Lauseng City of Hopkins Page 2 Assist the City of Hopkins in the receipt of bids and in the award of contracts for the manufacture and installation of the SCADA system. . Examine the Contractor's shop drawing submittals to assure compliance with the intent of the design. Periodically observe the Contractor's work to assure compliance with the intent of the design and the requirements of the contract. Identify any demand and/or energy conservation measures that may qualify for low-cost funding under the various grant and loan programs administered by the Minnesota Department of Public Service or Northern States Power Company. We will assist the City of Hopkins in performing the engineering analysis and in the preparation of applications for such low- cost funding. . We expect that the City of Hopkins will: Make available existing reports, maps, plans, specifications, installation drawings, Owner's Manuals and such other materials as may be of help to us in providing these services. Make available City personnel who are familiar with the existing facilities to make available their background knowledge and operating experience. Conduct such special system operations as may be required for test purposes to provide data fur the evaluations and analyses. We anticipate that the services to be provided under this proposal will require three months from the time we are notified to proceed. Our fee for these services will be detennined by applying our standard hourly charges for the personnel involved plus outside costs at actual cost, subject to a maximum charge for all services of nine thousand dollars ($9,000.00). If this proposal is acceptable, please sign below and we will proceed with the described work. Sincerely, RIEKE CARROLL tvfULLER ASSOCIATES, INe. 'i!~~ Project Manger . Mr. Mike Lauseng City of Hopkins Page 3 OWNER: By ATTEST Type Name Type Name Title Title Date ~8/22/95 11:19 e . '5'512 935 8814 RCM ASSOCIATES 14I 004/004