CR 95-188 CO #3 Mainstreet Construction e . e "\ y o " /' October 13, 1995 o P K \ "" Council Report 95-188 CHANGE ORDER NO.3 HAINSTREET RECONSTRUCTION 5th AVENUE TO T.H.169 Proposed Action. staff recommends adoption of the following motion: Move that Council approve Chanae Order No. 3 as it relates to Mainstreet improvements. proiect 93-18. Overview. The Mainstreet project between 5th Avenue and T.H. 169 is now complete. Only a few minor inspection punch list items remain. At the time Council acted on change orders 1 and 2 the consultant advised a final change order would be necessary. Council is now requested to act on that change. Primary Issues to Consider. + Nature of the change order items · Cost and funding · Staff recommendation Supportina Information. · Change Order No.3 · RLK letter of support ~ d~essele Engineering Superintendent . CR 95-188 Page 2 Primary Issues to Consider. . Nature of the change order items 1. Staff worked with the consultant in designing a more practical and durable electrical receptacle at each boulevard tree. It was then necessary to cut proper sized holes in the tree grates. e Attendant to the improved tree receptacles was the staff directed upgrading of the tree light electrical 120/240 volt system. 2. Field conditions engendered lowering of a 3" PVC signal conduit at 5th Avenue and Mainstreet. 3. Widening of a sidewalk adjacent to Walser-Chrysler required relocation of a private irrigation system. 4. A staff field decision was made to replace the existing sanitary manhole castings. 5. A final tally of contract work performed indicates quantities below the estimated amount and in some cases the contract item was entirely omitted. This quantity tally is the basis for the compensating portion of the change order. · Cost and funding The net cost of this change order is - $14,642.82. A negative $20,955.70 is attributable to compensating quantities in the contract. $6,312.88 is related to items 1-4 above and a funding breakdown follows: Tree grate holes $1,375 Funded by assessmentsjTIF G.O. Bonds Lower 3" conduit $ 633.92 II Repair irrigation system $ 942.44 $799.18 Assessments $163.26 TIF/G.O.Bonds MH castings $1,577.77 Sanitary Sewer Fund Revise electrical $1,753.75 Funded by assessments/TIF G.O. Bonds · Staff recommendation ~ Staff concurs with RLK's support letter and recommends that council authorize Change Order No.3. . . e MAINSTREET RECONSTRUCTION PROJECT I hereby acknowledge that the items listOO here have been reviewed by RLK Associates, and ace recommended for payment. I hereby acknowledge that tire items listed here have been reviewed by Midwest Asphalt Corporation, and ace recommended for payment. I hereby acknowledge that the items listed here have been reviewed and are recommended for payment. CITY PROJECT 93-18 CHANGE ORDER 3 TO CONTRACT PREPARED BY: RLK ASSOCIATES, LTD 922 MAINSTREET HOPKINS, 1m 55343 CONSTRUCTION BY: MIDWEST ASPHALT CORPORATION P.O. BOX 5477 HOPKINS, MN 55343 4~~ / tf()~ t . ~~ DATE: DATE: DATE: /~hz(9~ /O/;Z/jS" I { . . e MAINSTREET RECONSTRUCTION PROJECT CITY PROJECT 93-18 CHANGE ORDER NO.3 CONTRACT SUMMARY Original Contract Amount Previous Changes to Contract Change Order 1 Change Order 2 + + Current Change to Contract Change Order 3 Revised Contract Amount $ 387,410.90 $ 8,768.14 $ 10,789.60 $ 14,642.82 $ 392,325.82 . October 11, 1995 RLK Project 94044 Mr. Jim Gessele Engineering Superintendent City of Hopkins 1010 1st Street South Hopkins, MN 55343 RE: Mainstreet Reconstruction Project Justification for Change Order City project 93-18 Dear Mr, Gessele: The following items have been presented to RLK Associates for changes to the Contract for the above referenced project. A brief description of work ordered, by whom it was approved, and e documentation/invoices have been attached following the descriptions provided. Refer to Invoice Midwest Asphalt dated June 26, 1995 Tree Grate Holes $ 1,375.00 Holes were cut in the tree grates to provide access for the tree grate receptacles, Refer to Invoice Midwest Asphalt dated October 13, 1994 Lower 3" PVC Signal Conduit 5th Avenue and Mainstreet $ 663.92 During the installation of the storm sewer, pipe crews unearthed a signal conduit for the traffic signal at the southeast quadrant of 5th Avenue and Mainstreet. Killmer Electric was called in temporarily interrupt the traffic signal, and lower the conduit. Refer to Invoice Midwest Asphalt dated October 26, 1994 . Repair of Walser-Chrysler Irrigation System $ 942.44 . . . The widening of the concrete sidewalk adjacent to Walser-Chrysler Lot on the south side of Main street required the relocation of the irrigation system. This is a change from the original contract, as it was not noted on the survey that an irrigation system was present in this area. Frame Castings and Adjustments $ 1,577.77 Plans originally called for the salvage and reinstall of the existing castings for sanitary sewer. Castings were raised to final wearing surface elevation by the contractor once the base course had been placed, After castings were raised, the utility department stated that castings needed to be replaced with castings with a larger diameter opening, Castings were removed and replaced with new castings, Revise Electrical 1201240 Volt System $ 1,753.75 Work was ordered by the utility department. Work was completed on time and materials basis. Total $ 6,312.88 Invoices submitted by Midwest Asphalt are attached for your reference in processing this change order. If you have any questions, or need additional information, please do not hesitate to contact me at our offices. Sincerely, ;f/4~~ Matt 10 son Design Engineer