APPROVE CHANGE ORDER No.1
HAETZOLD FIELD IMPROVEMENTS
Proposed Action.
Staff recommends adoption of the following motion: Move that
Council approve Chanae Order No.1 as it pertains to Maetzold
Field Improvements. Proiect 94-05.
Overview.
Maetzold Field improvements are nearing completion and final
payments to contractors are being prepared. Bituminous Consulting
contracted for the general field improvements at the site and has
made application for final payment. Their work includes several
extras that are detailed in Change Order No.1.
Primary Issues to Consider.
. Nature of change order items and funding
. The parks superintendent has prepared the attached support
memorandum that summarizes the work, the dollar
deletion/addition, and justification of the work done. The
changes are generally summarized as those driven by unanticipated
field conditions. Ample contingency funds are available in the
total Maetzold Field project budget to cover the additional
change order costs.
. Staff recommendation
Staff finds the additional costs to be justified and are accurate
and fair. staff recommends approval of this change order for
final payment.
Supportina Information.
~ Change Order No.1
. Staff support memo
~~
e Qmes Gessele
Engineering Superintendent
07/27/95 12:17 '!t612 937 5822 WESTWOOD PRO SVS 141 0021002
'.. '. '"-
---- ,,'-
Westwood Professional Services, Inc.
. 14180 West Trunk Highway 5
Eden Prairie, MN 55344
CHANGE ORDER NO.1
PROJECT: MAETZOLO FIELD
DATE OF ISSUANCE: July 11,1995 EFFECTIVE DATE: May 15. 1995
OWNER: CITY OF HOPKJNS
OWNER's Contract: Proled. No. 94-05 (Field Improvements) ENGINEER: Tim Er1ddla
CONTRACTOR: Bituminous Consulting and Contracting Co.. Inc. PROJECT NO.: 94289
You are directed to proceed promptly with the following d1ange(s):
Oescripd.cfl:
ttem Unit Unit Price Oty. Total
De/etions:
Concrete Curb L.F. 20.00 .12.0 -240.00
2 112" Bit Trail w/o base S.Y. 5.90 .200.0 .1 180.00
Total Deletions: ..$1,420.00
Additions:
Common Excavation C.Y. 9.00 90.00 810.00
Granular Borrow CY 9.00 180.00 1,620,00
. Class 5 C.Y. 19.50 10.00 195.00
Imported T opsoll C.Y. 10.00 97.00 970.00
4" Concrete S.F. 3.55 122.00 433.10
2 112" Bit trail and base SX 12.42 354.00 4,396.68
Cana'ete Maintenance Strip LF. 5.50 38.00 209.00
Sod S.Y. 2.45 1,326.00 3.248.7Q
T etal Additions: $11,882.48
TOTAL CHANGE ORDER NO.1 $10,.462.48
PUl'Dose of Change Order: Correction on field administered units used in construction.
CHANGE IN CONTRACT PRICE/COMPLETION DATE
Original Conbad: Price:
$86,470.50
Net d1anges fn:Im previous Change O~ No. a to No. a
$0.00
-
Contracl: Price prior to !his Ch.mge Order
$86,470.50
Net In~_183..) of thls ChanQe Order
$10,462.48
. Contrad: F'l'iclIl with all approved Change Ordel5
$96,9:32.98
Original Completlon Date: Mav 15 199~
Completion Date with Change Order. June 15 1995
~e 1 at 1
~ by -.a............. s.w:- TIllS
~~EI..DC01_COC
ATTACHMENT FOR CHANGE ORDER NO 1
MAETZOLD FIELD PROJECT
BITUMINOUS CONSULTING AND CONTRACTING
4Il This change order is necessary to close out the second and final phase of
the Maetzold Field redevelopment. The change order covers both deletions
and additions, resulting in a total addition to the project of
$10,462.48. The breakdown of the listed items with an explanation of
each follows: .
DELETIONS:
1) Concrete Curb - $240 delete
Actual lineal footage poured was 20 ft less than proposed.
2) 2.5" Bituminous Trail without base - $1,180 delete
site conditions which showed up during construction required trail to be
installed with a base material.
ADDITIONS:
1) Common Excavation
2) Granular Borrow
3) Class 5
4) Imported top soil - Total 1-4: $3,595 addition
tit These four items were all required in order to change the grade for the
northeast corner service road/pedestrian path.
5) 4" Concrete - $433.10 addition
Actual concrete square footage poured under and around shelter and
players benches was 122 square feet more than what the plans showed.
6) 2.5" Bituminous Trail with base - $4,396.68 addition
A combination of changing 200 feet of trail without base to 200 feet of
trail with base and changing the service road from 8' to 10' wide.
7) Concrete Maintenance strip - $209 addition
Actual lineal feet poured was 38 feet more than called for in plan
drawings. These maintenance strips go under all fencing for the
ballfields.
8) Sod - $3,248.70 addition
This addition was necessary to re-sod the water and sewer excavation
coming into the shelter from 14th Ave No. Although this was anticipated,
it was originally going to be funded from general line item budgets. We
felt it was more appropriate to have the contractor already on site do
4Itthe work, and include the costs on this project. This resulted in 1,326
square yards of sod in addition to what the plans called for.
MAETCHGLDOC