CR 95-135 CO #1 Maetzold Field Improvements 1 , ,) c., ,. July 28, 1995 ~ council Report 95-135 'Y '<' . o P K \ .". APPROVE CHANGE ORDER No.1 HAETZOLD FIELD IMPROVEMENTS Proposed Action. Staff recommends adoption of the following motion: Move that Council approve Chanae Order No.1 as it pertains to Maetzold Field Improvements. Proiect 94-05. Overview. Maetzold Field improvements are nearing completion and final payments to contractors are being prepared. Bituminous Consulting contracted for the general field improvements at the site and has made application for final payment. Their work includes several extras that are detailed in Change Order No.1. Primary Issues to Consider. . Nature of change order items and funding . The parks superintendent has prepared the attached support memorandum that summarizes the work, the dollar deletion/addition, and justification of the work done. The changes are generally summarized as those driven by unanticipated field conditions. Ample contingency funds are available in the total Maetzold Field project budget to cover the additional change order costs. . Staff recommendation Staff finds the additional costs to be justified and are accurate and fair. staff recommends approval of this change order for final payment. Supportina Information. ~ Change Order No.1 . Staff support memo ~~ e Qmes Gessele Engineering Superintendent 07/27/95 12:17 '!t612 937 5822 WESTWOOD PRO SVS 141 0021002 '.. '. '"- ---- ,,'- Westwood Professional Services, Inc. . 14180 West Trunk Highway 5 Eden Prairie, MN 55344 CHANGE ORDER NO.1 PROJECT: MAETZOLO FIELD DATE OF ISSUANCE: July 11,1995 EFFECTIVE DATE: May 15. 1995 OWNER: CITY OF HOPKJNS OWNER's Contract: Proled. No. 94-05 (Field Improvements) ENGINEER: Tim Er1ddla CONTRACTOR: Bituminous Consulting and Contracting Co.. Inc. PROJECT NO.: 94289 You are directed to proceed promptly with the following d1ange(s): Oescripd.cfl: ttem Unit Unit Price Oty. Total De/etions: Concrete Curb L.F. 20.00 .12.0 -240.00 2 112" Bit Trail w/o base S.Y. 5.90 .200.0 .1 180.00 Total Deletions: ..$1,420.00 Additions: Common Excavation C.Y. 9.00 90.00 810.00 Granular Borrow CY 9.00 180.00 1,620,00 . Class 5 C.Y. 19.50 10.00 195.00 Imported T opsoll C.Y. 10.00 97.00 970.00 4" Concrete S.F. 3.55 122.00 433.10 2 112" Bit trail and base SX 12.42 354.00 4,396.68 Cana'ete Maintenance Strip LF. 5.50 38.00 209.00 Sod S.Y. 2.45 1,326.00 3.248.7Q T etal Additions: $11,882.48 TOTAL CHANGE ORDER NO.1 $10,.462.48 PUl'Dose of Change Order: Correction on field administered units used in construction. CHANGE IN CONTRACT PRICE/COMPLETION DATE Original Conbad: Price: $86,470.50 Net d1anges fn:Im previous Change O~ No. a to No. a $0.00 - Contracl: Price prior to !his Ch.mge Order $86,470.50 Net In~_183..) of thls ChanQe Order $10,462.48 . Contrad: F'l'iclIl with all approved Change Ordel5 $96,9:32.98 Original Completlon Date: Mav 15 199~ Completion Date with Change Order. June 15 1995 ~e 1 at 1 ~ by -.a............. s.w:- TIllS ~~EI..DC01_COC ATTACHMENT FOR CHANGE ORDER NO 1 MAETZOLD FIELD PROJECT BITUMINOUS CONSULTING AND CONTRACTING 4Il This change order is necessary to close out the second and final phase of the Maetzold Field redevelopment. The change order covers both deletions and additions, resulting in a total addition to the project of $10,462.48. The breakdown of the listed items with an explanation of each follows: . DELETIONS: 1) Concrete Curb - $240 delete Actual lineal footage poured was 20 ft less than proposed. 2) 2.5" Bituminous Trail without base - $1,180 delete site conditions which showed up during construction required trail to be installed with a base material. ADDITIONS: 1) Common Excavation 2) Granular Borrow 3) Class 5 4) Imported top soil - Total 1-4: $3,595 addition tit These four items were all required in order to change the grade for the northeast corner service road/pedestrian path. 5) 4" Concrete - $433.10 addition Actual concrete square footage poured under and around shelter and players benches was 122 square feet more than what the plans showed. 6) 2.5" Bituminous Trail with base - $4,396.68 addition A combination of changing 200 feet of trail without base to 200 feet of trail with base and changing the service road from 8' to 10' wide. 7) Concrete Maintenance strip - $209 addition Actual lineal feet poured was 38 feet more than called for in plan drawings. These maintenance strips go under all fencing for the ballfields. 8) Sod - $3,248.70 addition This addition was necessary to re-sod the water and sewer excavation coming into the shelter from 14th Ave No. Although this was anticipated, it was originally going to be funded from general line item budgets. We felt it was more appropriate to have the contractor already on site do 4Itthe work, and include the costs on this project. This resulted in 1,326 square yards of sod in addition to what the plans called for. MAETCHGLDOC