CR 95-236 PH Residential Street ImprovementsDecember 11, 1995
Overview.
1 Y
0
0 P K
PUBLIC HEARING
1996 RESIDENTIAL STREET IMPROVEMENTS
Council Report: 95 -236
Proposed Action.
Staff recommends adoption of the following motion: "Move that Council
adopt Resolution No. 95 -120 ordering 1996 Residential Street and
Alley Improvements and Authorize the City Manager to enter into an
agreement with MSA Consulting Engineers for preparation of plans and
specifications."
Council at its regular November 21st meeting accepted a feasibility
study concerning 1996 Residential Street Reconstruction and ordered a
public hearing for December 19th. Notices were sent to all affected
property owners. A public information meeting was held on December
7th for the Peaceful Valley and Westbrooke East neighborhoods. The
Campbell neighborhood meeting was December llth. At these meetings,
residents didn't question the need for the project. Rather, they had
concerns regarding the amount of the assessment, how the assessment
policy would be used, consideration for retired on fixed incomes, and
whether the 8th Avenue & 7th Avenue reconstruction had to include two
foot subgrade excavation and backfill.
MSA Consulting Engineers prepared the project feasibility report and
topographic surveys of the project areas. Staff is now recommending
MSA continue with construction plans and specifications. MSA has
proposed a fee of $90,582. The total engineering fee for the project,
including feasibility report and survey, would be $99,785 or 14.7% of
the estimated construction costs. This is a very reasonable cost as
engineering fees for previous street projects have averaged 20% of
construction costs.
Primary Issues to Consider
o Staff recommendation on assessment policy
o Estimated construction costs
o Proposed schedule
Supporting Information
o Notice . of Hearing of Improvements
o Location Maps
o Estimated Assessments, Sweetbriar Lane and Burnes Drive
o Proposed Resolution 9a -120
o MSA Consulting E;in = s Letter of Proposal - Engineering Fees
Steven J. Stadler, Director of Public Works
Council Report: 95 -236
Page 2
Analysis of Issues
o Staff recommendation on assessment policy
Current City policy allows several options for determining
assessments and allows some staff discretion in "certain unusual
cases ". This project involves three separate assessment areas.
One of these areas is 8th Avenue south from 6th Street to 7th
Street and 7th Avenue south from 7th Street to 8th Street.
Another assessment area is the alley east of 6th Avenue south,
north of 8th Street. The third area is the Sweetbriar Lane and
Burnes Drive area.
The first area (8th Avenue South and 7th Avenue South) is a
rectangular lot area. As such, staff recommends distributing
assessable project costs using actual front footage with 75 foot
maximum of each lot abutting the improvement. Lot frontages
range from 50 feet to 100 feet. The assessable project costs of
$166,635 are high for two blocks of reconstruction. The higher
costs are due to a recommendation to remove two feet of existing
subgrade and backfill with granular borrow. This adds $69,380 to
the project cost and means an assessment fee of more than
$70 /foot of frontage. This would mean an assessment of at least
$5,250 for each 75' lot. If challenged, the city may find it
difficult to show this amount of benefit to these properties. As
such, staff is recommending this additional work be paid by the
city. This would lower the assessment to approximately $50-
$55 /frontage foot, or $3,750 - $4,150 per 75' lot. The city has
set precedent in using a 75' maximum front footage in past alley
reconstruction projects.
The second assessment area is the alley east of 6th Avenue South.
Reconstruction assessments would be approximately $14 /LF based on
actual frontage, or about $840 per 60' lot.
The Sweetbriar Lane /Burnes Drive area involves primarily 75'
frontage rectangular lots on Sweetbriar and odd - shaped lots with
83' to 220' of frontage on Burnes Drive. As a result, staff is
recommending using an adjusted front footage based on lot areas
as a percentage of total project lot area. Further, we're
recommending a 75' minimum and 125' maximum front footage. This
formula results in assessments ranging from $3,056 for the
predominant 75' front footage rectangular lots on Sweetbriar to
$5,093 for the large 1/2 acre lots on Burnes Drive (see attached
Estimated Assessments spreadsheet). This is consistent with
previous assessments done in Hobby Acres and Knollwood. In both
of these cases, an adjusted front footage based on relative lot
sizes was determined and a minimum and maximum assessable footage
was used.
Council Report: 95 -236
Page 3
o Estimated construction costs
The estimated total project cost is $880,000. A breakdown of
funding is shown below.
Assessed Street /Alley costs:
City Street /Alley costs:
Water Fund costs:
Sanitary Sewer Fund costs:
Storm Sewer Fund costs:
$230,000
$396,000
$ 62,000
$ 97,000
$ 95.000
TOTAL: $880,000
o Proposed schedule
City Council Receives Feasibility Report/ Nov. 21, 95
Public Hearing Date Ordered
Public Hearing /City Council Orders Plans Dec. 19, 95
and Specifications
City Council Receives Plans and Specifications/ Feb. 20, 96
and Sets Bid Opening
City Council Receives Bids, Schedule Mar. 19, 96
Assessment Hearing
City Council Holds Assessment Hearing Apr. 16, 96
City Council Awards Contract May 21, 96
Construction Begins June 3, 96
Construction Complete Aug. 30, 96
CITY OF HOPKINS
Hennepin County, Minnesota
NOTICE OF HEARING OF IMPROVEMENTS
TO WHOM IT MAY CONCERN:
WHEREAS, the City Council of the City of Hopkins, Hennepin
County, Minnesota, deems it necessary and expedient that the
improvements hereinafter described be made,
NOW, THEREFORE, notice is hereby given that the City Council will
hold a public hearing on said improvements at the following
time and place within the said City.
DATE: December 19, 1995
TIME: 7:30 P.M.
LOCATION: CITY HALL
Council Chambers
1010 First Street South
Hopkins, MN 55343
The general nature of the improvements is the reconstruction of
streets, storm sewer, sanitary sewer, water main and alley, City
Projects 95 -16 and 95 -17, in the following described areas:
8th Avenue South (6th to 8th Street South)
7th Avenue South (5th to 8th Street South)
8th Street South (6th to 8th Avenue South)
Alley (east of 6th Avenue South between 7th /8th
Streets South)
Burnes Drive (Mtka. Mills Rd. to Campbell Rd.)
Sweet Briar Lane (Mtka. Mills Rd. to 670 feet North)
THE TOTAL ESTIMATED COST OF SAID IMPROVEMENTS IS $880,345.00
It is proposed to assess every lot, piece or parcel of land
benefited by said improvements whether abutting thereon or not,
based upon benefits received without regard to cash valuation.
Persons desiring to be heard with reference to the proposed
improvements should be present at this hearing.
This Council proposes to proceed under the authority granted by
Chapter 429 MSA.
Dated this 21st day of November, 1995.
BY ORDER OF THE CITY COUNCIL
f
44.....0 /'/
-' A. Genellie, City Clerk
t y of Hopkins, Minnesota
Publish: Hopkins Sailor
November 29, December 6
...•"."-
! :b
. 2,.1.1
.:::".-
24
1
23
2
22
3
21
4
23
20
5
19
49e
21'
4
21
18
7
5
20
6�s
i7
8
)
6
19
16
9
VL
7
15
10
` '7
18
7
14
11
8
6TH
8
t3 SKEET
24
! :b
. 2,.1.1
.:::".-
24
1 0
6
/
/
/
/
24
1 0
23...
23
2
23
v`Lt d. 1 5'
,:...
21'
4
21
4
-k; � '
'20.
5
20
6�s
20
5
'a0
6
19
8
19
VL
7
18
` '7
18
7
8
17
8
17
8
60 9
16
9
16
9
10
::
..
: . :
:::::::::::‘,7TH
15
10 W
15
10 =
11 W
14
11 L
14
1 1 �WW
12' <
13
12 <
1 2>
STREZ <
HPOO6 -Ex1
5
MILL AND OVERLAY
RECONSTRUCTION
(118
8TH
5TH
STREET
STREET
......................... ...............................
•
......................... ...............................
19
18
17
18
15
14
13 /
11
S0,
2
3
4
5
7
8
9
10
14
0
11 4
10 5
13 2
12 3
6
8 7
18 63r 9
Q
15
t0
14 11
13 •3 12
_
S0.
S0.
PT OUTLOT
2
3
4
1 5
6
7
8
9
10
2
3
4
4 5
7
14
3 13
12
0
1111MI HMI
1.1 £
�%1 1L•.
MEW RION=
KAMM
MOMMLA EAMM
MMOMW11 it»
!J LUOMMMS
X1/ iI►lf4011
EMMA AMMO
ILA
MOMMIES RUM,
111111M3 WAMOMOM
MOWN ryMMONt
.4 iii Wp.
. IMMOIL RUM=
(
(8)
(
(4)
•
2
3 >:4
•
(12)
(13)
(14)
(15)
(16)
(2)
8
(1)
6
v
•
300
MSt
CONSQI,TI C MIMS
CITY OF HOPKINS
1996 RESIDENTIAL STREET IMPROVEMENTS
LOCATION MAP
(8)
24
23
22 8
21
(
HP006 -EX1
ST.
2
3
2
4 U')
N O. 7
RECONSTRUCTION
COKSUR EN
CITY OF HOPKINS
1996 RESIDENTIAL STREET IMPROVEMENTS
LOCATION MAP
ENO:Mg
0 0 0 0 0 0 0 LO e- O O O LO O O L() O O CO O I` O I` O O LC) O
✓ N N N N N N N CO N N N N N N N N I` O CO O N N Imo- I`I`I`
. .. . . . . . . . . . . . . . . . . . . . . . . .
CO CO CO O CO CO CD CO N CO CD CO CO CO CO CO CD M 4 4 r 6 4 co M co M
✓ Ln OOOO LLD COOOOOOOO M Nd'CD0)0)O)
r 0 0 0 0 0 0 0 T 0 0 0 0 Co 0 0 0 0 00 d' N CO r - 0 0 0 0
. .. _
M M M M M M M M M M M M M M M M M O •t '� d' co co O O O LC)
Ef} Ef}
EA- Ef} 6F} Ef} Ef} Ef} Ef} EA- Ef} Ef} EF} Ef} (f). bF} OS- el- Ef} Ef} Ef} Ef} 69 Ef} Ef} Ef}
0 0 0 0 0 0 LC) 0 0 0 0 0 0 0 0 0 0 O O O O O O O LC) O O
. . . . . . . . . . . . . . . . . .. . . . . . . . . .
O O O O O O O O O O O O O O O O O O O O O O O O O O O
4"Ct Nt. ' d'4 4 444 VVd'V dt1'1' Nr ttd'd'd'd' '1' `4"
69 6g to Ef} Ef} bg Ef} to Ef} Ef} Ef} Ef} Ef} Ef} Ef} Eft Ef} Ef} En- 69 Ef} Ef} to Ef} Ef} Ef}
N- 0 0 0 0 0 0 0 r 0 0 0 0 0 0 0 0 0 't I` M CD CO 0 0 0 0
'Cr 0 0 0 Co 0 0 Co CO 0 Co 0 0 0 0 0 0 0 CO O CO Co r 0 0 0 0
. . . . . . . . . . . . . • . . . . . . . . .
CO 0 0 0 0 0 0 0 I� 0 0 0 0 0 0 0 0 0 00 CD M CD 1` O O O LC)
I` I` I` I` I` I` I` I` N. I` I` I` Ns I` I` I` I` N O O 00 I` N N N N
r r r r r
T
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
. . . . . . . . . . . . . . .
0 0 0 0 0 0 0 0 0 0 0 0 ) O O
N- N- N N- N- N- N- I-I`I`I`N-N-N-I`
O O O O
O O O
O O O O
N N N N
r r r r
N.- 00 00 00 00 00 00 CD r 00 00 00 CO 00 00 00 O 00 4 I` co CO CO op 00 00
4 00 00 00 00 CO 00 O Cfl 00 00 00 00 00 00 00 O0 O CO O 00 O r CO I` LO CO
Cfl d) 0) 6 d) O) 6 O ti 0) O O 6 0) O O 00 O 00 d) Cr) O) I` of I- L N
I` CO C O CO CD C O CD C O I ` CD CO CO CO CD CO C O CD N r O O 00 I` O O M (`
r r r r r r r r
00 O O O O O O r O 0 0 0 0 0 0 0 M 0 I` O O d' O MOO d'
00 0 0 0 0 0 0 I` 0 0 0 0 0 0 0 0 0 0 CO O O I` I` NOM O
CO 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 d- O O) O O O N 00 O M O
O I` I` I` F- I` I- C D O I` I` I` I` I` I` I` d" O CA O O O N O C3) 00 N
T r r r r r r r N
O d d' v. v- v. C D C D C D
• N N N N N N O d' N N N N N N N N 00 00 d' M co d' C3) O 01 O
N N N N N N N N N N N N N N N N N' M M M N N d' LO Nt L 1)
O O O O O O O O O O O O O O O O O O O O O O O O O O O
• O C O I ` 00 CA O r- N M d' O CO I` 00 C D O CO I` 00 C)) O r N M Li) I`
I` I` I` I` I` N- 00 00 OD 00 00 00 OD 00 00 00 C7) O L0 O O CO CO CO CO C3) C3)
O 00000000000000000000000000
O 00000000000000000000000000
V r r r r r r r r r r r r r r r r r r r r r V r r r r
N N N N N N N N N N N N N N N N N N N N N N N N N N N
1 1 1 1 1 1 1 1 1 1 1 N N N N N N N N N N N N N N N N N N N N N N N N N N N
I` I` ti I\ I` ti I` I` I` ti I` I` I` I\ I` Ns I` ti ti ti I` ti ti Ns I` ti ti
✓ r r r r r r r r r r r r r r r r r r r r r r r r r V
T r r r r r r r r r r r r r r r r r r r r r r r r r r
t l l t • l t l ■ l l l l l l l ■ l l l l l l l l l l l l l
t d' 'd' d' ' d' d' d' d' 4 d' 4 'Ct d' 'd' d' 4 4 d' d' d' 4 'd' 4 4 d' d'
N N N N N N N N N N N N N N N N N N N N N N N N N N N
N CU Cv N N 0 0 N 0 0 0 N 0 0 0 0 4)
C C C C C C C C C C C C C C C C C
06 C6 Ca C13 CO C6 C6 C6 CO R3 CQ CCS CCI CO CQ C6 Ctf
J J J J J J J J J J J J J J J J J a) O a a) a O a) a
1. '• L L L L L L L L L L L L 4.3 L L > > > > > > > > > >
C15 CTf t0 c C6 CLS C6 c t6 c6 c� ci co 's. 's.
'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L.. 'L 'L ' Q 0 Q o Q 0 Q Q o Q
m m m m m m co m m m m m m m m m m N N N Cl) N N
-F.r a--� -. a
� --� 4 — -- �
+ --� 4 -- �
� --� — _ � - a
� .. as � C1) CU d) CI) CU CU N CU N
N N N N a N N N N � N N N � N N N N - N N
N CU CU N CU Cv CU N CD CU CU N CU N N CU CU EE i i i i i i i i iC..
cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn m Cn m m m m m m m m m m
▪ 00 N CO O 00 N CD M I r O CD M I` T O Nr CD 00 O N r M O I`
• M MNN r 00 'CCMMN�- r 00 d'MNr r OM Nr - O
M M M M co) M M M M M M M M M M M M M M M M M M M M 0) 01
r N M t}' O t0 1` 00 CA O r N M d' O CC 1■ 00 O O r- N M 't Lt) CG 1`
r r r r r r r r r r N N N N N N N N
1
2
3
4
5
6
7
8
9
10
11
630
638
646
645
641
637
633
631
625
621
601 -61
12 -
13 739
14 733
15 729
16 725
17 719
4111 715
709
20 701
21 702
22 704
23 714
24 716
25 716
26 716
27 720
28 724
29 724
30 724
31 726
32 734
33 738
34 738
35 738
36 738
37 738
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
8th Avenue South
9 8th Avenue South
8th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
7th Avenue South
c:Uotsuite \123r5w\ work \projects\proj_96 \9517ph.wk4
Preliminary Asses ment Roll
Proj ct 95 -17: Str et Improv m nt
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
25- 117 -22 13
thru
25- 117 -22 13
thru
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22.42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
25- 117 -22 42
0057
0058
0059
0072
0073
0074
0075
0076
0077
0105
0108
0117
0120 296.88
0159
0004
0005
0006
0007
0008
0009
0010
0011
0045
0046
0047
0048
0049
0050
0051
0052
0053
0054
0055
0057
0056
0058
0059
0060
0061
100.00
100.00
100.00
50.00
50.00
50.00
50.00
50.00
50.00
100.00
196.90
2,381.93
75.00 75.00 $54.00 $4,050.00
75.00 75.00 $54.00 $4,050.00
75.00 75.00 $54.00 $4,050.00
50.00 $54.00 $2,700.00
50.00 $54.00 $2,700.00
50.00 $54.00 $2,700.00
50.00 $54.00 $2,700.00
50.00 $54.00 $2,700.00
50.00 $54.00 $2,700.00
75.00 75.00 $54.00 $4,050.00
196.90 $54.00 $10,632.60
296.88 $54.00 $16,031.52
115.00 75.00 75.00 $54.00 $4,050.00
65.00 65.00 $54.00 $3,510.00
65.00 65.00 $54.00 $3,510.00
65.00 65.00 $54.00 $3,510.00
65.00 65.00 $54.00 $3,510.00
75.00 75.00 $54.00 $4,050.00
85.00 75.00 75.00 $54.00 $4,050.00
50.00 50.00 $54.00 $2,700.00
50.15 50.15 $54.00 $2,708.10
50.00 50.00 $54.00 $2,700.00
50.00 50.00 $54.00 $2,700.00
25.00
26.00 75.00 = 75.00 $54.00 $4,050.00
27.00
50.00 50.00 $54.00 $2,700.00
25.00
25.00 75.00 75.00 $54.00 $4,050.00
25.00
62.50 62.50 $54.00 $3,375.00
75.00 75.00 $54.00 $4,050.00
12.50
25.00
25.00 75.00 75.00 $54.00 $4,050.00
25.00
25.00
2,191.43 $118,337.22
1
2
3
4
5
6
7
8
709 -711
715 -717
721 -723
727 -729
731 -733
735 -737
739 -741
6th Avenue South
6th Avenue South
6th Avenue South
6th Avenue South
Valley Park (City)
6th Avenue South
6th Avenue South
6th Avenue South
c: \lotsuite \123r5w\ work \projects \proj_96 \9517pha.wk4
Preliminary Assessment Roll
Proj ct 95 -17: Alley Improvement
25- 117 -22 42 0035
25- 117 -22 42 0036
25- 117 -22 42 0037
25- 117 -22 42 0038
25- 117 -22 42 0079
25- 117 -22 42 0080
25- 117 -22 42 0081
25- 117 -22 42 0082
60.00 $32.76
60.00 $32.76
60.00 $32.76
60.00 $32.76
444.39 $32.76
68.00 $32.76
68.00 $32.76
68.58 $32.76
$1,965.60
$1,965.60
$1,965.60
$1,965.60
$14,558.22
$2,227.68
$2,227.68
$2,246.68
888.97 $29,122.66
WHEREAS,
WHEREAS,
WHEREAS,
NOW
ATTEST:
CITY OF HOPKINS
Hennepin County, Minnesota
RESOLUTION NO. 95 -120
RESOLUTION ORDERING IMPROVEMENT AFTER PUBLIC HEARING
a resolution of the City Council adopted the 21st day
of November, 1995, fixed a date for a Council hearing
on the proposed improvements including: 1) street
reconstruction of Burnes Drive, the Campbell
neighborhood section of Sweetbriar Lane, 8th Avenue
South from 6th Street South to 7th Street South, 7th
Avenue South from 7th Street South to 8th Street South,
8th Street South from 6th Avenue South to 8th Avenue
South; 2) asphalt pavement reconstruction of the alley
east of 6th Avenue South between 7th Street and 8th
Street; 3) asphalt pavement milling and overlay of 8th
Avenue South from 7th Street to 8th Street and 7th
Avenue South from 5th Street to 7th Street, and
the Council deems it prudent to undertake these street
and alley improvements, and
ten days mailed notice and two weeks published notice
of the hearing was given, and the hearing was held
thereon on the 19th day of December, 1995, at which all
persons desiring to be heard were given an opportunity
to be heard thereon,
THEREFORE BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF
HOPKINS, MINNESOTA:
1. Such improvement is hereby ordered as proposed on
the Council resolution adopted the 21st day of
November, 1995.
2. MSA Consulting Engineers is hereby designated as
the engineer for this improvement and shall
prepare plans and specifications for the making of
such improvement.
Adopted by the City Council of the City of Hopkins, Minnesota,
this 19th day of December 1995.
James A. Genellie, City Clerk
BY
Charles D. Redepenning, Mayor
ROM MI MS
16 t'i ;o Pork Drive December 14, 1995
File: 158- 006 -10
5t. Poul, MN 55108
612.644.4389
1-800-888-2923
Fox: 612- 644-9446
EtKIRICAINKHANKAL
P ;W! k 0
SCADA
SYSi M CON1ROLS
OFFICES IN:
MINNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
Mr. Steve Stadler
Director of Public Works
City of Hopkins
1010 lst Street
Hopkins, MN 55343
RE: ESTIMATED ENGINEERING FEES FOR DESIGN AND CONSTRUCTION
SERVICES, CITY OF HOPKINS 1996 RESIDENTIAL STREET IMPROVEMENTS
Dear Mr. Stadler:
As you requested, we have prepared an estimate for engineering services to conplete work
!► f!:?;a!: ..��,A.. for the City of Hopkins' 1996 Residential Street Improvement program. Services include
MUNICIPAL the following tasks:
MANNING
SOLlc: -w4 u Project design - preparation of project plans and specifications
suu:;ru:A(. • Bidding services
I Construction administration including contract management, contractor payments, etc.
1k FW ■ Construction staking and inspection, including preparation of project as- builts
TRI • Public information - newsletters, etc.
The attached sheet summarizes the total estimated fees for each of these tasks. As we have
done for the feasibility report and preliminary surveying, we are suggesting these tasks be
compensated on an hourly basis with a total maximum not -to- exceed figure for each work
element. The basis for these estimates are project segments identified in the feasibility
report, using an estimated budget of $678,000 for construction costs.
You have recently approved additions to the feasibility report and preliminary surveying
to include work on Sweet Briar and the alley, and also extra meetings. As we understand,
these additions will be presented to the City Council for consideration on December 19th.
If approved, the total feasibility report budget will be $6,170 and the surveying budget for
preliminary surveying would be $3,033. This total figure of $9,203 would be added to the
total estimated fee to complete the remaining services for the project, $90,582. The total
engineering fee for the project would then be $99,785, or approximately 14.7% of the total
construction cost for the project.
I58 /006.131O.dec
An Equal Opportunity Employer
Mr. Steve Stadler
December 14, 1995
Page Two
For comparison purposes for projects of this magnitude, our fees normally range between
14% to 16%, so we believe the fee is a realistic estimate of the work effort required to
complete the project. Obviously, should the scope of the project change significantly as
a result of future City Council action or the public hearing, the fees could be a
accordingly.
If you have any questions, please contact me.
Sincerely,
MSA, CONSU G ENGINEERS
en D. Gatlin, P.E.
roject Manager
SDG:tw
15$1006- 1310.dcc
i11:E'.1t'?,�i1f� �til�I11i'f,ItS
158/006- 1310.dec
Fee Estimate - Design /Construction Services
1996 Residential Street Improvements
C I T V C o l H C. P k; J
Proj.
Mgr.
$81 /hr.
Prof.
Engr.
$54 /hr.
CADD
Tech.
$48 /hr.
Field
Tech.
Survey
Grew
Glc;tical
natal
DESIGN
32
180
270
40
20
24
$2,592
$9,720
$12,960
$2,000
$1,500
$960
AutoCADD = 250 hrs (c $1S
$3,750
Total Maximum
(Hourly not -to- exceed)
$33,98
Expenses
$500
BIDDING
16
24
--
--
--
20
$1,296
$1,296
--
--
--
$800
Expenses
$200
Total Maximum
(Hourly not -to- exceed
$3,592
CONSTRUCTION
ADMINISTRATION
16
48
--
16
--
40
$1,296
$2,592
--
800
--
$1,600
Expenses
$300
Total Maximum
(Hourly not -to- exceed)
$6,88
CONSTRUCTION STAKING/
INSPECTION
24
32
60
540
120
8
$1,944
$1,728
$2,880
$27,000
$9,000
$320
Expenses
$1,200
Total Maximum
(Hourly not -to- exceed)
$44
PUBLIC INFORMATION
--
12
--
--
--
40
--
$648
--
--
--
$1,600
Expenses
$100
Total Maximum
(Hourly not -to- exceed)
$2,348
TOTAL ESTIMATED COST
$90,582
i11:E'.1t'?,�i1f� �til�I11i'f,ItS
158/006- 1310.dec
Fee Estimate - Design /Construction Services
1996 Residential Street Improvements
C I T V C o l H C. P k; J