CR 95-236 PH Residential Street ImprovementsDecember 11, 1995 Overview. 1 Y 0 0 P K PUBLIC HEARING 1996 RESIDENTIAL STREET IMPROVEMENTS Council Report: 95 -236 Proposed Action. Staff recommends adoption of the following motion: "Move that Council adopt Resolution No. 95 -120 ordering 1996 Residential Street and Alley Improvements and Authorize the City Manager to enter into an agreement with MSA Consulting Engineers for preparation of plans and specifications." Council at its regular November 21st meeting accepted a feasibility study concerning 1996 Residential Street Reconstruction and ordered a public hearing for December 19th. Notices were sent to all affected property owners. A public information meeting was held on December 7th for the Peaceful Valley and Westbrooke East neighborhoods. The Campbell neighborhood meeting was December llth. At these meetings, residents didn't question the need for the project. Rather, they had concerns regarding the amount of the assessment, how the assessment policy would be used, consideration for retired on fixed incomes, and whether the 8th Avenue & 7th Avenue reconstruction had to include two foot subgrade excavation and backfill. MSA Consulting Engineers prepared the project feasibility report and topographic surveys of the project areas. Staff is now recommending MSA continue with construction plans and specifications. MSA has proposed a fee of $90,582. The total engineering fee for the project, including feasibility report and survey, would be $99,785 or 14.7% of the estimated construction costs. This is a very reasonable cost as engineering fees for previous street projects have averaged 20% of construction costs. Primary Issues to Consider o Staff recommendation on assessment policy o Estimated construction costs o Proposed schedule Supporting Information o Notice . of Hearing of Improvements o Location Maps o Estimated Assessments, Sweetbriar Lane and Burnes Drive o Proposed Resolution 9a -120 o MSA Consulting E;in = s Letter of Proposal - Engineering Fees Steven J. Stadler, Director of Public Works Council Report: 95 -236 Page 2 Analysis of Issues o Staff recommendation on assessment policy Current City policy allows several options for determining assessments and allows some staff discretion in "certain unusual cases ". This project involves three separate assessment areas. One of these areas is 8th Avenue south from 6th Street to 7th Street and 7th Avenue south from 7th Street to 8th Street. Another assessment area is the alley east of 6th Avenue south, north of 8th Street. The third area is the Sweetbriar Lane and Burnes Drive area. The first area (8th Avenue South and 7th Avenue South) is a rectangular lot area. As such, staff recommends distributing assessable project costs using actual front footage with 75 foot maximum of each lot abutting the improvement. Lot frontages range from 50 feet to 100 feet. The assessable project costs of $166,635 are high for two blocks of reconstruction. The higher costs are due to a recommendation to remove two feet of existing subgrade and backfill with granular borrow. This adds $69,380 to the project cost and means an assessment fee of more than $70 /foot of frontage. This would mean an assessment of at least $5,250 for each 75' lot. If challenged, the city may find it difficult to show this amount of benefit to these properties. As such, staff is recommending this additional work be paid by the city. This would lower the assessment to approximately $50- $55 /frontage foot, or $3,750 - $4,150 per 75' lot. The city has set precedent in using a 75' maximum front footage in past alley reconstruction projects. The second assessment area is the alley east of 6th Avenue South. Reconstruction assessments would be approximately $14 /LF based on actual frontage, or about $840 per 60' lot. The Sweetbriar Lane /Burnes Drive area involves primarily 75' frontage rectangular lots on Sweetbriar and odd - shaped lots with 83' to 220' of frontage on Burnes Drive. As a result, staff is recommending using an adjusted front footage based on lot areas as a percentage of total project lot area. Further, we're recommending a 75' minimum and 125' maximum front footage. This formula results in assessments ranging from $3,056 for the predominant 75' front footage rectangular lots on Sweetbriar to $5,093 for the large 1/2 acre lots on Burnes Drive (see attached Estimated Assessments spreadsheet). This is consistent with previous assessments done in Hobby Acres and Knollwood. In both of these cases, an adjusted front footage based on relative lot sizes was determined and a minimum and maximum assessable footage was used. Council Report: 95 -236 Page 3 o Estimated construction costs The estimated total project cost is $880,000. A breakdown of funding is shown below. Assessed Street /Alley costs: City Street /Alley costs: Water Fund costs: Sanitary Sewer Fund costs: Storm Sewer Fund costs: $230,000 $396,000 $ 62,000 $ 97,000 $ 95.000 TOTAL: $880,000 o Proposed schedule City Council Receives Feasibility Report/ Nov. 21, 95 Public Hearing Date Ordered Public Hearing /City Council Orders Plans Dec. 19, 95 and Specifications City Council Receives Plans and Specifications/ Feb. 20, 96 and Sets Bid Opening City Council Receives Bids, Schedule Mar. 19, 96 Assessment Hearing City Council Holds Assessment Hearing Apr. 16, 96 City Council Awards Contract May 21, 96 Construction Begins June 3, 96 Construction Complete Aug. 30, 96 CITY OF HOPKINS Hennepin County, Minnesota NOTICE OF HEARING OF IMPROVEMENTS TO WHOM IT MAY CONCERN: WHEREAS, the City Council of the City of Hopkins, Hennepin County, Minnesota, deems it necessary and expedient that the improvements hereinafter described be made, NOW, THEREFORE, notice is hereby given that the City Council will hold a public hearing on said improvements at the following time and place within the said City. DATE: December 19, 1995 TIME: 7:30 P.M. LOCATION: CITY HALL Council Chambers 1010 First Street South Hopkins, MN 55343 The general nature of the improvements is the reconstruction of streets, storm sewer, sanitary sewer, water main and alley, City Projects 95 -16 and 95 -17, in the following described areas: 8th Avenue South (6th to 8th Street South) 7th Avenue South (5th to 8th Street South) 8th Street South (6th to 8th Avenue South) Alley (east of 6th Avenue South between 7th /8th Streets South) Burnes Drive (Mtka. Mills Rd. to Campbell Rd.) Sweet Briar Lane (Mtka. Mills Rd. to 670 feet North) THE TOTAL ESTIMATED COST OF SAID IMPROVEMENTS IS $880,345.00 It is proposed to assess every lot, piece or parcel of land benefited by said improvements whether abutting thereon or not, based upon benefits received without regard to cash valuation. Persons desiring to be heard with reference to the proposed improvements should be present at this hearing. This Council proposes to proceed under the authority granted by Chapter 429 MSA. Dated this 21st day of November, 1995. BY ORDER OF THE CITY COUNCIL f 44.....0 /'/ -' A. Genellie, City Clerk t y of Hopkins, Minnesota Publish: Hopkins Sailor November 29, December 6 ...•"."- ! :b . 2,.1.1 .:::".- 24 1 23 2 22 3 21 4 23 20 5 19 49e 21' 4 21 18 7 5 20 6�s i7 8 ) 6 19 16 9 VL 7 15 10 ` '7 18 7 14 11 8 6TH 8 t3 SKEET 24 ! :b . 2,.1.1 .:::".- 24 1 0 6 / / / / 24 1 0 23... 23 2 23 v`Lt d. 1 5' ,:... 21' 4 21 4 -k; � ' '20. 5 20 6�s 20 5 'a0 6 19 8 19 VL 7 18 ` '7 18 7 8 17 8 17 8 60 9 16 9 16 9 10 :: .. : . : :::::::::::‘,7TH 15 10 W 15 10 = 11 W 14 11 L 14 1 1 �WW 12' < 13 12 < 1 2> STREZ < HPOO6 -Ex1 5 MILL AND OVERLAY RECONSTRUCTION (118 8TH 5TH STREET STREET ......................... ............................... • ......................... ............................... 19 18 17 18 15 14 13 / 11 S0, 2 3 4 5 7 8 9 10 14 0 11 4 10 5 13 2 12 3 6 8 7 18 63r 9 Q 15 t0 14 11 13 •3 12 _ S0. S0. PT OUTLOT 2 3 4 1 5 6 7 8 9 10 2 3 4 4 5 7 14 3 13 12 0 1111MI HMI 1.1 £ �%1 1L•. MEW RION= KAMM MOMMLA EAMM MMOMW11 it» !J LUOMMMS X1/ iI►lf4011 EMMA AMMO ILA MOMMIES RUM, 111111M3 WAMOMOM MOWN ryMMONt .4 iii Wp. . IMMOIL RUM= ( (8) ( (4) • 2 3 >:4 • (12) (13) (14) (15) (16) (2) 8 (1) 6 v • 300 MSt CONSQI,TI C MIMS CITY OF HOPKINS 1996 RESIDENTIAL STREET IMPROVEMENTS LOCATION MAP (8) 24 23 22 8 21 ( HP006 -EX1 ST. 2 3 2 4 U') N O. 7 RECONSTRUCTION COKSUR EN CITY OF HOPKINS 1996 RESIDENTIAL STREET IMPROVEMENTS LOCATION MAP ENO:Mg 0 0 0 0 0 0 0 LO e- O O O LO O O L() O O CO O I` O I` O O LC) O ✓ N N N N N N N CO N N N N N N N N I` O CO O N N Imo- I`I`I` . .. . . . . . . . . . . . . . . . . . . . . . . . CO CO CO O CO CO CD CO N CO CD CO CO CO CO CO CD M 4 4 r 6 4 co M co M ✓ Ln OOOO LLD COOOOOOOO M Nd'CD0)0)O) r 0 0 0 0 0 0 0 T 0 0 0 0 Co 0 0 0 0 00 d' N CO r - 0 0 0 0 . .. _ M M M M M M M M M M M M M M M M M O •t '� d' co co O O O LC) Ef} Ef} EA- Ef} 6F} Ef} Ef} Ef} Ef} EA- Ef} Ef} EF} Ef} (f). bF} OS- el- Ef} Ef} Ef} Ef} 69 Ef} Ef} Ef} 0 0 0 0 0 0 LC) 0 0 0 0 0 0 0 0 0 0 O O O O O O O LC) O O . . . . . . . . . . . . . . . . . .. . . . . . . . . . O O O O O O O O O O O O O O O O O O O O O O O O O O O 4"Ct Nt. ' d'4 4 444 VVd'V dt1'1' Nr ttd'd'd'd' '1' `4" 69 6g to Ef} Ef} bg Ef} to Ef} Ef} Ef} Ef} Ef} Ef} Ef} Eft Ef} Ef} En- 69 Ef} Ef} to Ef} Ef} Ef} N- 0 0 0 0 0 0 0 r 0 0 0 0 0 0 0 0 0 't I` M CD CO 0 0 0 0 'Cr 0 0 0 Co 0 0 Co CO 0 Co 0 0 0 0 0 0 0 CO O CO Co r 0 0 0 0 . . . . . . . . . . . . . • . . . . . . . . . CO 0 0 0 0 0 0 0 I� 0 0 0 0 0 0 0 0 0 00 CD M CD 1` O O O LC) I` I` I` I` I` I` I` I` N. I` I` I` Ns I` I` I` I` N O O 00 I` N N N N r r r r r T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . 0 0 0 0 0 0 0 0 0 0 0 0 ) O O N- N- N N- N- N- N- I-I`I`I`N-N-N-I` O O O O O O O O O O O N N N N r r r r N.- 00 00 00 00 00 00 CD r 00 00 00 CO 00 00 00 O 00 4 I` co CO CO op 00 00 4 00 00 00 00 CO 00 O Cfl 00 00 00 00 00 00 00 O0 O CO O 00 O r CO I` LO CO Cfl d) 0) 6 d) O) 6 O ti 0) O O 6 0) O O 00 O 00 d) Cr) O) I` of I- L N I` CO C O CO CD C O CD C O I ` CD CO CO CO CD CO C O CD N r O O 00 I` O O M (` r r r r r r r r 00 O O O O O O r O 0 0 0 0 0 0 0 M 0 I` O O d' O MOO d' 00 0 0 0 0 0 0 I` 0 0 0 0 0 0 0 0 0 0 CO O O I` I` NOM O CO 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 d- O O) O O O N 00 O M O O I` I` I` F- I` I- C D O I` I` I` I` I` I` I` d" O CA O O O N O C3) 00 N T r r r r r r r N O d d' v. v- v. C D C D C D • N N N N N N O d' N N N N N N N N 00 00 d' M co d' C3) O 01 O N N N N N N N N N N N N N N N N N' M M M N N d' LO Nt L 1) O O O O O O O O O O O O O O O O O O O O O O O O O O O • O C O I ` 00 CA O r- N M d' O CO I` 00 C D O CO I` 00 C)) O r N M Li) I` I` I` I` I` I` N- 00 00 OD 00 00 00 OD 00 00 00 C7) O L0 O O CO CO CO CO C3) C3) O 00000000000000000000000000 O 00000000000000000000000000 V r r r r r r r r r r r r r r r r r r r r r V r r r r N N N N N N N N N N N N N N N N N N N N N N N N N N N 1 1 1 1 1 1 1 1 1 1 1 N N N N N N N N N N N N N N N N N N N N N N N N N N N I` I` ti I\ I` ti I` I` I` ti I` I` I` I\ I` Ns I` ti ti ti I` ti ti Ns I` ti ti ✓ r r r r r r r r r r r r r r r r r r r r r r r r r V T r r r r r r r r r r r r r r r r r r r r r r r r r r t l l t • l t l ■ l l l l l l l ■ l l l l l l l l l l l l l t d' 'd' d' ' d' d' d' d' 4 d' 4 'Ct d' 'd' d' 4 4 d' d' d' 4 'd' 4 4 d' d' N N N N N N N N N N N N N N N N N N N N N N N N N N N N CU Cv N N 0 0 N 0 0 0 N 0 0 0 0 4) C C C C C C C C C C C C C C C C C 06 C6 Ca C13 CO C6 C6 C6 CO R3 CQ CCS CCI CO CQ C6 Ctf J J J J J J J J J J J J J J J J J a) O a a) a O a) a 1. '• L L L L L L L L L L L L 4.3 L L > > > > > > > > > > C15 CTf t0 c C6 CLS C6 c t6 c6 c� ci co 's. 's. 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L 'L.. 'L 'L ' Q 0 Q o Q 0 Q Q o Q m m m m m m co m m m m m m m m m m N N N Cl) N N -F.r a--� -. a � --� 4 — -- � + --� 4 -- � � --� — _ � - a � .. as � C1) CU d) CI) CU CU N CU N N N N N a N N N N � N N N � N N N N - N N N CU CU N CU Cv CU N CD CU CU N CU N N CU CU EE i i i i i i i i iC.. cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn m Cn m m m m m m m m m m ▪ 00 N CO O 00 N CD M I r O CD M I` T O Nr CD 00 O N r M O I` • M MNN r 00 'CCMMN�- r 00 d'MNr r OM Nr - O M M M M co) M M M M M M M M M M M M M M M M M M M M 0) 01 r N M t}' O t0 1` 00 CA O r N M d' O CC 1■ 00 O O r- N M 't Lt) CG 1` r r r r r r r r r r N N N N N N N N 1 2 3 4 5 6 7 8 9 10 11 630 638 646 645 641 637 633 631 625 621 601 -61 12 - 13 739 14 733 15 729 16 725 17 719 4111 715 709 20 701 21 702 22 704 23 714 24 716 25 716 26 716 27 720 28 724 29 724 30 724 31 726 32 734 33 738 34 738 35 738 36 738 37 738 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 8th Avenue South 9 8th Avenue South 8th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South 7th Avenue South c:Uotsuite \123r5w\ work \projects\proj_96 \9517ph.wk4 Preliminary Asses ment Roll Proj ct 95 -17: Str et Improv m nt 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 25- 117 -22 13 thru 25- 117 -22 13 thru 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22.42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 25- 117 -22 42 0057 0058 0059 0072 0073 0074 0075 0076 0077 0105 0108 0117 0120 296.88 0159 0004 0005 0006 0007 0008 0009 0010 0011 0045 0046 0047 0048 0049 0050 0051 0052 0053 0054 0055 0057 0056 0058 0059 0060 0061 100.00 100.00 100.00 50.00 50.00 50.00 50.00 50.00 50.00 100.00 196.90 2,381.93 75.00 75.00 $54.00 $4,050.00 75.00 75.00 $54.00 $4,050.00 75.00 75.00 $54.00 $4,050.00 50.00 $54.00 $2,700.00 50.00 $54.00 $2,700.00 50.00 $54.00 $2,700.00 50.00 $54.00 $2,700.00 50.00 $54.00 $2,700.00 50.00 $54.00 $2,700.00 75.00 75.00 $54.00 $4,050.00 196.90 $54.00 $10,632.60 296.88 $54.00 $16,031.52 115.00 75.00 75.00 $54.00 $4,050.00 65.00 65.00 $54.00 $3,510.00 65.00 65.00 $54.00 $3,510.00 65.00 65.00 $54.00 $3,510.00 65.00 65.00 $54.00 $3,510.00 75.00 75.00 $54.00 $4,050.00 85.00 75.00 75.00 $54.00 $4,050.00 50.00 50.00 $54.00 $2,700.00 50.15 50.15 $54.00 $2,708.10 50.00 50.00 $54.00 $2,700.00 50.00 50.00 $54.00 $2,700.00 25.00 26.00 75.00 = 75.00 $54.00 $4,050.00 27.00 50.00 50.00 $54.00 $2,700.00 25.00 25.00 75.00 75.00 $54.00 $4,050.00 25.00 62.50 62.50 $54.00 $3,375.00 75.00 75.00 $54.00 $4,050.00 12.50 25.00 25.00 75.00 75.00 $54.00 $4,050.00 25.00 25.00 2,191.43 $118,337.22 1 2 3 4 5 6 7 8 709 -711 715 -717 721 -723 727 -729 731 -733 735 -737 739 -741 6th Avenue South 6th Avenue South 6th Avenue South 6th Avenue South Valley Park (City) 6th Avenue South 6th Avenue South 6th Avenue South c: \lotsuite \123r5w\ work \projects \proj_96 \9517pha.wk4 Preliminary Assessment Roll Proj ct 95 -17: Alley Improvement 25- 117 -22 42 0035 25- 117 -22 42 0036 25- 117 -22 42 0037 25- 117 -22 42 0038 25- 117 -22 42 0079 25- 117 -22 42 0080 25- 117 -22 42 0081 25- 117 -22 42 0082 60.00 $32.76 60.00 $32.76 60.00 $32.76 60.00 $32.76 444.39 $32.76 68.00 $32.76 68.00 $32.76 68.58 $32.76 $1,965.60 $1,965.60 $1,965.60 $1,965.60 $14,558.22 $2,227.68 $2,227.68 $2,246.68 888.97 $29,122.66 WHEREAS, WHEREAS, WHEREAS, NOW ATTEST: CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO. 95 -120 RESOLUTION ORDERING IMPROVEMENT AFTER PUBLIC HEARING a resolution of the City Council adopted the 21st day of November, 1995, fixed a date for a Council hearing on the proposed improvements including: 1) street reconstruction of Burnes Drive, the Campbell neighborhood section of Sweetbriar Lane, 8th Avenue South from 6th Street South to 7th Street South, 7th Avenue South from 7th Street South to 8th Street South, 8th Street South from 6th Avenue South to 8th Avenue South; 2) asphalt pavement reconstruction of the alley east of 6th Avenue South between 7th Street and 8th Street; 3) asphalt pavement milling and overlay of 8th Avenue South from 7th Street to 8th Street and 7th Avenue South from 5th Street to 7th Street, and the Council deems it prudent to undertake these street and alley improvements, and ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held thereon on the 19th day of December, 1995, at which all persons desiring to be heard were given an opportunity to be heard thereon, THEREFORE BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF HOPKINS, MINNESOTA: 1. Such improvement is hereby ordered as proposed on the Council resolution adopted the 21st day of November, 1995. 2. MSA Consulting Engineers is hereby designated as the engineer for this improvement and shall prepare plans and specifications for the making of such improvement. Adopted by the City Council of the City of Hopkins, Minnesota, this 19th day of December 1995. James A. Genellie, City Clerk BY Charles D. Redepenning, Mayor ROM MI MS 16 t'i ;o Pork Drive December 14, 1995 File: 158- 006 -10 5t. Poul, MN 55108 612.644.4389 1-800-888-2923 Fox: 612- 644-9446 EtKIRICAINKHANKAL P ;W! k 0 SCADA SYSi M CON1ROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA Mr. Steve Stadler Director of Public Works City of Hopkins 1010 lst Street Hopkins, MN 55343 RE: ESTIMATED ENGINEERING FEES FOR DESIGN AND CONSTRUCTION SERVICES, CITY OF HOPKINS 1996 RESIDENTIAL STREET IMPROVEMENTS Dear Mr. Stadler: As you requested, we have prepared an estimate for engineering services to conplete work !► f!:?;a!: ..��,A.. for the City of Hopkins' 1996 Residential Street Improvement program. Services include MUNICIPAL the following tasks: MANNING SOLlc: -w4 u Project design - preparation of project plans and specifications suu:;ru:A(. • Bidding services I Construction administration including contract management, contractor payments, etc. 1k FW ■ Construction staking and inspection, including preparation of project as- builts TRI • Public information - newsletters, etc. The attached sheet summarizes the total estimated fees for each of these tasks. As we have done for the feasibility report and preliminary surveying, we are suggesting these tasks be compensated on an hourly basis with a total maximum not -to- exceed figure for each work element. The basis for these estimates are project segments identified in the feasibility report, using an estimated budget of $678,000 for construction costs. You have recently approved additions to the feasibility report and preliminary surveying to include work on Sweet Briar and the alley, and also extra meetings. As we understand, these additions will be presented to the City Council for consideration on December 19th. If approved, the total feasibility report budget will be $6,170 and the surveying budget for preliminary surveying would be $3,033. This total figure of $9,203 would be added to the total estimated fee to complete the remaining services for the project, $90,582. The total engineering fee for the project would then be $99,785, or approximately 14.7% of the total construction cost for the project. I58 /006.131O.dec An Equal Opportunity Employer Mr. Steve Stadler December 14, 1995 Page Two For comparison purposes for projects of this magnitude, our fees normally range between 14% to 16%, so we believe the fee is a realistic estimate of the work effort required to complete the project. Obviously, should the scope of the project change significantly as a result of future City Council action or the public hearing, the fees could be a accordingly. If you have any questions, please contact me. Sincerely, MSA, CONSU G ENGINEERS en D. Gatlin, P.E. roject Manager SDG:tw 15$1006- 1310.dcc i11:E'.1t'?,�i1f� �til�I11i'f,ItS 158/006- 1310.dec Fee Estimate - Design /Construction Services 1996 Residential Street Improvements C I T V C o l H C. P k; J Proj. Mgr. $81 /hr. Prof. Engr. $54 /hr. CADD Tech. $48 /hr. Field Tech. Survey Grew Glc;tical natal DESIGN 32 180 270 40 20 24 $2,592 $9,720 $12,960 $2,000 $1,500 $960 AutoCADD = 250 hrs (c $1S $3,750 Total Maximum (Hourly not -to- exceed) $33,98 Expenses $500 BIDDING 16 24 -- -- -- 20 $1,296 $1,296 -- -- -- $800 Expenses $200 Total Maximum (Hourly not -to- exceed $3,592 CONSTRUCTION ADMINISTRATION 16 48 -- 16 -- 40 $1,296 $2,592 -- 800 -- $1,600 Expenses $300 Total Maximum (Hourly not -to- exceed) $6,88 CONSTRUCTION STAKING/ INSPECTION 24 32 60 540 120 8 $1,944 $1,728 $2,880 $27,000 $9,000 $320 Expenses $1,200 Total Maximum (Hourly not -to- exceed) $44 PUBLIC INFORMATION -- 12 -- -- -- 40 -- $648 -- -- -- $1,600 Expenses $100 Total Maximum (Hourly not -to- exceed) $2,348 TOTAL ESTIMATED COST $90,582 i11:E'.1t'?,�i1f� �til�I11i'f,ItS 158/006- 1310.dec Fee Estimate - Design /Construction Services 1996 Residential Street Improvements C I T V C o l H C. P k; J