CR 95-224 Approval Of Agreement w/RCMNovember 29, 1995 Overview. APPROVAL OF AGREEMENT WITH RCM, INC. FOR PROFESSIONAL SERVICES RELATING TO DESIGN AND CONSTRUCTION OVERSIGHT OF SECOND PHASE DITCH CLEAN OUT - NINE MILE CREEK Council Report: 95 -224 Proposed Action. Staff recommends adoption of the following motion: "Move that Council authorize the Mayor and City Manager to enter into an agreement with RCM, Inc. for professional services as they relate to design and construction oversight of second phase ditch Clean out Nine Mile Creek." Previous Nine Mile Creek cleaning has resulted in unstable banks in several areas and the sloughing of material into the channel. This material must be removed and the channel side slopes flattened to prevent further erosion. The project are is from Dovre Drive (Edina) upstream to T.H. 169 and along the west side of T.H. 169. Primary Issues to Consider What are the costs and how will the work be funded? Engineering services fees for design, construction administration and permit administration are not to exceed $4,000. A construction estimate will be prepared during design. The project will be funded from the Permanent Improvement Revolving (PIR) fund. Nine -Mile Creek Watershed has agreed to reimburse the city as they are doing for the 1994/95 9 -Mile Creek Clean -out work. What is the project schedule? Design: December 1995 /January 1996 Construction: February /March 1996 Supporting Information o RCM, Inc. Letter proposal Steven J. Stadler, Public Works Director J.J.i jai rieke Carroll muller associates, inc. engineers architects land surveyors equal opportunity employer 10901 red circle drive box 130 minnetonka, minnesota 55343 612- 935 -6901 fax 612- 935 -8814 J. V • VV AA I I V.1 .7VV V VJ.2 November 29,1995 Mr. Steven Stadler Public Works Director City of Hopkins 1010 First Street South Hopkins, MN 55343 Dear Mr. Stadler: 1 \V1S1 L1�.7 n7VV 11111iJ WJ VVi. VVV Thank you for this opportunity to provide a proposal covering continuing engineering services for second -phase ditch cleanout of parts of Nine Mile Creek. This proposal has been written in the form of a letter agreement. If the proposal is acceptable to the City, you may return one signed copy to RCM, and keep one for city records. The signed letter will serve as our authorization to proceed. The second -phase project covers the same portion of Nine Mile Creek that was cleaned as part of City Project 94-15: from Dovre Drive upstream to T.H. 169, and along the west side of T.H. 169. As you know, material from the stream banks has fallen into the channel at several locations. The second -phase project will include removal of this material, flattening of bank slopes in limited areas, and restoration. The scope of RCM services includes the following tasks: • Inspect channel with City personnel to identify areas to be cleaned and stabilized. • Prepare drawings and specifications. • Prepare permit applications for permit extensions or new permits as required by DNR, COE, MPCA, Hennepin County, MnDOT, and Watershed District. • Assist City with bidding and award of construction project. • Attend preconstruction meeting. • Periodic observation of construction on an "as- needed" basis. • Project documentation and closeout. We propose to provide engineering services at the following hourly rates: Senior Civil Engineer $82/hour Civil Engineer $66/hour Civil Technician $60/hour Resident Project Representative $55/hour 2- Person Survey Crew $88/hour • 14 ;00 UO ±L V44 001% Mr. Steven Stadler November 29,1995 Page 2 CADD Technician $45/hour Secretary $40/hour Mileage $0.301nile CADD Equipment Charge $20/hour RCM fees for design and bidding assistance will not exceed $4,000 without prior written authorization from the City. In addition, all required permit fees shall be paid by the City. Fees for services during construction will depend on the level of service required and shall be billed at the above hourly rates. Engineering services for design will be completed in accordance with the following schedule: Following authorization to proceed, RCM and the City will meet to inspect the channel at the City's earliest convenience. Following channel inspection and determination of the scope of work, RCM will complete drawings, specifications, and permit applications within 30 days. Services related to construction administration will be completed within 30 days following completion of construction. We hope this proposal meets with your approval and we look forward to completing the project with you If the proposal is acceptable, please execute the agreement in the space provided below and return one signed copy to RCM. Sincerely, (Rua U304141-, Paul W. Blum, P.E. RIEKE CARROLL MTJ LER ASSOCIATES, INC. Accepted by: Rieke Carroll Muller Associates, Inc. City of Hopkins, Minnesota 0?le 17 0? Robert F. Roskopf, P.E. C.E.O. Sam L. Claassen, P.E. Vice President Dated :. 1 i /Z- s''.m is.7%. /VV &J..J Title Dated: