Memo Interviews W/Developers Suburban Chevrolet
. .
C I T Y o F HOP KIN S
M E MaR AND U M
DATE: April 6, 1994
TO: Honorable Mayor and City Council
FROM: -;I)(Jim Kerrigan, Director Planning & Economic Development
SUBJECT: INTERVIEWS WITH DEVELOPERS
SUBURBAN CHEVROLET PROPERTY
Recently the five developers that expressed an interest in the
Suburban Chevrolet's property were asked to complete a
questionnaire on the specifics of their project. Four of these
individuals have now completed and returned these questionnaires.
One developer has stated that he is no longer interested in
undertaking a project.
e The next step being proposed by staff is to have the City Council
interview the prospective developers. This has been scheduled .
for the April 12 workshop session as follows:
0 Marcus Corporation - 7 to 7:30 p.m.
0 Alan ChazinjLaSalle Group - 7:30 to 8 p.m.
0 Baton Corporation - 8 to 8:30 p.m.
0 Beard Group - 8:30 to 9 p.m.
Each of the individuals has been informed that they will have
approximately 15 minutes to make a presentation on their project.
It is anticipated that the last 10 to 15 minutes will be used to
answer questions from the council and staff.
Sid Inman, a representative of Publicorp, a local consulting firm
the city uses from time to time on development lssues, has agreed
to sit in on the interviews at no cost to the city. Staff feels
his expertise can provide an unbiased third party opinion on who
is the best developer and also help to justify the Council's
decision.
Staff has prepared a list of potential questions which can be
. used by the Council. An evaluation sheet has also been prepared
to provide a basis for ranking of the various individuals. .
It is proposed that the actual interviews be completed by 9 p.m.
At that time it is recommended that the Council and staff discuss
the pros and cons of each individual/firm and try to make a
decision on which developer to select for the project. If such a
------
Honorable Mayor and City Council
Page 2
. decision can be made that night it will be proposed that there be .
an agenda item on the next regular Council/HRA meeting
authorizing city staff to negotiate a preliminary development
agreement with that individual.
An option for the Council might be to identify two developers and
then ask for additional information. A second interview may also
be "appropriate following receipt of this information.
If it is determined through the interview process that none of
the developers are acceptable the following alternatives are
available:
0 Solicit developers through a formal Request For
Proposal (RFP) process
0 Informal solicitation of developers
Finally, a more radical alternative would be for the HRA to build
the movie theater and lease it to an operator. In this situation
the city becomes the developer.
Attached to this memo for Council review is the following:
. 0 A staff prepared summary of the various proposals e
0 Information as provided by each of the four developers
0 Questions to be asked of the developer
0 Developer rating form
JK03234J
. .
---
NA' "E OF SPECIFICS OF "El\ANT PROJECT C
-
DEVELOPER PROJECT IN}'ORMATION AND DEVEL-
EQUIT)
Baton Corporation 40 owner occupied, independent living, Baton Corporation feels secure in the Construction costs for the
331 Second Avenue North senior housing condominium units. marketability of the Condominium units condominiums is app!'~u.
Minneapolis, MN 55401 based upon past performance of $2.24 million. CO!lIiU "e,
7,000 square feet of retail space. Citigables. Construction would be the retail is yet to be dele,
Lindberg Pierce, Inc. contingent upon successful pre-sale of Developer equity in the -
units. (4 - 12 month process) approximately $492,000 :
Architects to come from Baton CQfi=
Tenants for retail space are yet to be Richard-Zejdlik, owner.
identified.
********************** *************************** **************************** *****************
Alan Chazin 8-10 screen movie theatre of Standard Theatres Inc.lSuper Saver Anticipated construction
Alan Chazin Homes/ approximately 25 - 30,000 square feet. Cinema has tentatively approved the site, time is $2.5 million.
LaSalle Group, Ltd. A restaurant is also proposed to be subject to a developer being selected.
constructed on the site Potential users of the restaurant space Amount of developer <'-'.
5353 Wayzata Blvd. include "Caribou Coffee" and "Starbucks has not yet been lut!!iifif'
Suite 602 Coffee". Other possibilities include a
Minneapolis, MN 55416 "Boston Chicken" franchise.
********************** *************************** **************************** *********~*~~~*~~
Mark Senn 6 screen movie theatre of approximately Proposed tenants are Midcontinent Estimated total project,.:
Marcus Corporation 25,000 square feet and a restaurant of Theatres, and Ciatti's or Spur's million.
1001 Wayzata Blvd. approximately 7,000 square feet on the Steakhouse.
south parcel of property. If the grocery Developer equity is t;St'_
Suite 100 store project proceeds, they propose to The office component would include First $515,000.
Minnetonka, MN 55343 construct a Bank building of Bank and RLK Assoc.'s, a local planning
approximately 5,000 square feet on the firm.
north parcel.
********************** *************************** **************************** "_' . '._.__"__'__0__'__'_'. .__.._.__.__._._
~~~~~~~=====~====
..-.-.----------------------------
Bill Beard 10 screen movie theatre, and a sit-down, Wallace Theatre Corporation is proposed Total estimated conSlIm"
The Beard Group full service restaurant facility. to be the theatre operator. They presently are $2.76 million.
4606 Sunnyside Road have locations on the West Coast and
Hawaii. Developer equity is to"," -
Edina, MN 55434 $800 - $900,000. (30% '
The restaurant tenant wishes to remain project costs)
anonymous until such a time as a formal
development agreement is ready to be
signed.
. - - .
.
. .
DEVELOPMENT QUESTIONNAIRE - FORMER SUBURBAN CHEVROLET PROPERTY
Information submitted by: William H. Beard, President
The Beard Group, Inc.
4606 Sunnyside Road
Edina, MN 55424
(612) 924-0824
Specifics of project: (size of building(s), description, and
proposed use)
See attached Development Outline
Tenant information: (proposed tenants and level of commitment)
See attached Development Outline
. Project costs: .
0 Construction costs? $2,760,000 Est.
0 Land costs? $ 0
0 Soft costs? $ 966,000 Est.
Anticipated source of funds for
0 Equity? Tvpically 30% of
Total proiect Cost
Source? Land/Partner Equity
0 Debt? 70% of Total pro;ect
Cost
. Source? (Anticipated) Bank/Institutional e
Rate/terms? (Anticipated) 9.5%/15 Yr Amort/
7 Year Term
Guarantees required? (Form) Guarantee from Citv
will be required on
permanent loan.
-
.
.
. .
0 Name, address, contac~ person for anticipated lender?
No decision at this time. To be determined.
0 Anticipated public assistance? $Land
Form of public assistance? See attached outline
0 Do you have ability to provide personal
financial guarantees if required by lender? Partial
Projects completed or in-process during the last three years: (If
you have completed a number of projects, identify those which may
be most similar to what you are proposing in Hopkins)
0 Name of project(s), location(s), specifics:
See attached .
.
References: Provide name, address, phone #'s of at lest one
individual In each of the following areas you have
worked with in the
0 Private lending institution
Name Mr. John Hermanson
Address MidAmerica Bank
2104 Hastinqs Avenue
Newport, MN 55055
Phone 459-9718
0 Public sector?
Name Mr. Craiq Waldron
City Administrator - City of Oakdale
Address 1584 Hadlev Avenue North
Oakdale, MN 55128
Phone 730-2820
0 Private sector? .
.
Name Mr. Thomas Kirbv
President - MEC Contractors
Address 5250 West 74th Street Suite 20
Edina, MN 55439
Phone 835-9077
- ...- -. - . ------..--. --
.
.
. .
0 Other?
Name
Address
Phone
Please attach the following:
A) Experience of development team including:
l. Resume of persons proposed to have either a
development or ownership interest.
2. Detail any similar projects designed or built.
3. List contractors/consultants proposed to be
utilized on this project.
. B) Proposed timeline (based on a Development Agreement
being executed July 1, 1994) .
C) Other pertinent information you feel appropriate to
provide.
. .
.
.
. .
II C
HOPKINS ENTERTAINMENT CENTER
DEVELOPMENT OUTLINE
MARCH 1994
OVERVIEW: Development or Downtown Entertainment Center on
the former site of Suburban Chevrolet. The
Entertainment Center would include a 10 screen,
second run movie theater occupying approximately
30,000 SF and a casual theme dinner house
occupying approxi~ately 6,000 SF.
DEVELOPER: William H. Beard
. President .
The Beard GrouPf Inc.
4606 Sunr.yside Road
Edina, MN 55424
(612) 924-0824
TENANTS: THEATER
Wallace Theater Corporation
3375 Koapaka Street, Suite 345
Honolulu, Hawaii 96819
RESTAURANT
The Restaurant Group wishes to remain anonymous
until the Development Agreement is entered into.
The Restaurant Group operates restaurants on a
regional basis. The restaurant would be a sit
downf full servicef casual theme dinner house.
The seating capacity would be for 240.
INCENTIVES: Land for one dollar ($1.00)
City credit enhancement guaranteeing the payment
the project's permanent debt service with some
type of revenue sharing agreement until the City's
guarantee lS no longer required.
. SITE PLAN: We have been using for concept development .
purposes the site plan produced by/for the City.
A copy of which is attached.
~,-~I~'r-- :1.:-,'-,'"~:'':2 ~=;:~l~. ~.':i~.~. :\!>-l~-.~:=>~L~. ='-:~~~ 1 'j:2) I?:=~_I:~~:~~ . ::::::.~ I,~~~\ l~<~- -;--~
-------
.
-
. .
~
....
Cl'
~
....
cc
~
....
r--
~
....
-Q
~
....
lI'\
~
....
~
~
....
!'I'l
ex: ~
~ ..:l g:
8 ~
Z Q ....
N
~ ~
. U x: lI'\
U 0"-
E-l UJ .... .
Z ....
~ 8 <:j4 iii
~ u en ~
0"-
Z ~ 0'\ ....
1-1 ~ ...-t N
....
~ 0
8 a: x: ~
cr: ll; u c- .
~ cr: ....
....
Eo; >t ,:;( ....
;:: ex: ~
~ ~ ~
Z 0"-
U) 1-1 ....
0
Z ~ ....
H H
::.:: ~ -t'
0.. r:.:J 0"-
....
0 a:: 0"-
x: ll;
-t'
Cl'
....
cc
-t'
Cl'
....
r--
~
Cl'
....
..0
-t'
""
....
lI'\
~
. a-
....
~ e
----
'" UJ ~
f- ~ ~ CI'l f-
Z < f- Z ....
UJ ... <:z:f-.... UJI- Z \i! L.l.l I-
z; I-UJ L.l.lZI- all~ ...z ~~ z; ~ u
CI.. <I- ;S~~ u~~ L.l.l .... L.l.l ::l
0'" ...UJ z... I- z: "'f-~ u 01: 0.... Q:
O...Jf- 0...1 ...JWf- .......w l.!lZUJ ZW SliiO::UJ Z ::lUJ Z~ l- 'UJ
O::UJ= UJCI.. ~~~ ...Ia:u ~%:n <lJJ <'"' < u '" ~~ ",,,,
<>l.!l ~~ <lJ<CO ~~~ za: <a..> Z o~ ~~
3UJ.... UJ<.:lUJ :JWQ: UJl.!l ....ww .... =- Q:Q:
<.co:: .OI:U .c<cz Q.,==- Q"-"- f-< tl.Cl"" "" "-CI.. (,:l;JJ wOo
.--
.
. <Dffi .
oj .
I - '
I- ,;
Z ..
~ " 1
1-1.<, ;.
Z -J
W i J ';
::2:!l I v
z. J ~
~ i ~ . j
a: ;.
~ ~ ~
UJ . ..
Cf) .! :!
;;,; "B
j J ~ r::: ::
a. <
0 1
:r:
,."
. ~ .
J,.::-...-;~'i~
----.....
- .._\
I I
I
I
,
(/)
III ,
J
~ ~
.,..
a. 1 ,,;
..
~ <: 4'
;j '-
-< ,
><
W
~ ~
:)
0
. .
I
Ul i
I- .l
- a.
tJ) g
. .
-
. .
I N c
WIWAM H. BEARD
PRESIDENT
THE BEARD GROUP, INC.
THE BEARD GROUP, INC.
William H. Beard, founded The Beard Group, Inc., in 1990 to
provide development and commercial real estate brokerage
services. The Beard Group, Inc. is a site location specialist
for national/regional retail chains. The Beard Group, Inc. also
provides consulting services to retailers/developers/owners from
pre-entryjpre-development stages right through to project
completion.
MEMBERSHIPS: -International Council of Shopping Centers
. -Childrens Museum of Minnesota - Executive Vice .
President/Board Member
-Economic Development Committee - Board Member
Oakdale, MN
-Metro East Development Partnership
Saint Paul, MN
PARTIAL LIST OF PROJECTS MR. BEARD HAS PERFORMED DEVELOPMENT/
LEASING/CONSULTING SERVICES FOR:
Bergen Plaza A 280,000 SF center anchored by
Shopping Center K-Mart, Rainbow Foods, Big Top Liquors,
Oakdale, MN and Snyder Brothers Drug Store.
Newport Landing A 16,000 SF retail and professional
Newport, MN center anchored by SuperArnerica, Burger
King and a large family dental clinic.
Oakdale Crossing An 82 acre mixed use office/industrial
Business Park park.
Oakdale, MN
. Gateway Development A 80 acre mixed use retail/commercial/ .
Oakdale, MN housing project.
~~ ~~if~ '~j_~r;...~'\,;Sil~~ ~CE'.C. ~ji1~a, \tir~r;e5L:I~ ':"S~~~ ' ~ rj ~ 2": ')~~_~~ltS=~ ~ = ~~: . rj l.2.; ~j.~ ~ -"-: ~ ::.:.;
.. ..---...-- ----~
.
-
. .
Blaske Franchise Group Represented the Seller in the sale or
Brooklyn Park, MN twenty-two ( 22) Burger King Restaurants
in the Minneapolis/St. Paul area.
The Newport Center 30,000 SF neighborhood center.
Newport, MN
Torchwood Franchise Represented the Buyer in the acquisition
Group, Inc. of 15 Burger King Restaurants in Daytona
Minneapolis, MN Beach, Florida.
Sauk Rapids City Center 17,000 SF convenience center.
Sauk Rapids, MN
GameBusters, Inc. Turnkey project development from site
Eagan, MN selection through build-out. Locations
in Minneapolis and Denver.
. Hardee's Restaurant Represented the Franchisee in the site .
Big Lake, MN acquisition and Governmental Approvals.
e .
... ..-------- ------ -~~
ARCUS
al Estate Development
ORPORATJON .
DEVELOPMENT PROPOSAL
~
CITY OF HOPKINS
SUBURBAN CHEVROLET SITE
.
.
..
1 COOl VVayzata Blvd. · Suite 100. Minnetonka i'v1N 55343 · (61 2) 593-1177
------
"'1ARCUS .
Real Estate Development
fiORPORATION .
.
<:.
. 'I:.
~
"
city of Hopkins
1010 First street South
. t~ Hopkins! MN 55343
Herewith submitted is our proposal to redevelop the former
Suburban Chevrolet site. Our proposal outlines the phased
.,
r development of a cinema, restaurant, bank and office. It is our
::; assumption and desire to develop such in conjunction with a City
" owlled arts facility. We feel that through a coordinated
~: -
development approach, certain economics can be realized and
common areas can be better assimilated to maximize utilization of
<- the Site.
~.
We feel all elements of the project are achievable under the
f proposal as submitted. The only question remaining is if
I additional financing measures will be necessary on the cinema
I which is considered a single purpose building and not real
r. .
desirable from a lenders perspective in todayfs market. We feel,
however, that with overall scope and nature of the project that
hurdle can be overcome.
Given the strong local base and commitment of our development
team we have every hope that the city will designate us tentative
developer so that we can proceed to more completely firm up all
aspects and details of our proposed project.
1
I If you have any questions, I will make myself available at your
1 convenience to address them in an appropriate manner.
I
RespectfUllY" f
I
j
, )?4z'4b~
I
Mark O. Senn
I MOSjbjm
. .
I
i
10001 \Nayz3ta Blvd.. SUite 100 .lV1innetonka i'vlN 55343. (612) 593-1177
r-
r ,
DEVELOP~E~ QUESTIONNAIRE - Fa~~ER SUBURBAN CHEVROLET PROPER'.ry .
Return no later than 3/14/94
Please attach additional pages if necessary.
specifics of project: (size of building(s) , description, and
proposed use)
Scuttl Side: 6 scre~~ ~~eatre approximately 25,000 Sq. ft.
family restaurant approximately 7,000 sa. ft.
Nor,-h Side: (de~end~~t on Tait's
5aD~ approximately 5,000 sa. ft. olus drive t..'"u:u prnr.c.:::or1ing)
Ei t..'1er Side: office building approximatelY 25,000 sa. ft. decendent CP lr.r.~Tion
or Cltv ~s facility.
~ -
Tenant . <= . . (proposed tenants, and level of cornmit:nent)
In.1..0rna1:l0n:
Theatre: Mi.c.C:~ntine."1t Theac::es * (tentative)
. Restaurant: Ciatti 's Inc. (S~ur's Ste~'1ouse) * (tentative) * Exclusive Pep .
Bar..k : First 3ank * (firm) if Tait's redeveloces * Exclusive Reo
I Office: RU: C: inn ) * L""<clusive Rep
I Est,:....na tee..
I Project cos"ts;
0 construction casts? $ 5 , 150 ,000
0 Lend costs? $ Citv
0 Soft casts? (A&Er finance, legal, etc. ) $ 515,000
- p...nticipated source of funds for project:
0 Equity? $c:po f"'wr1pr-::bi~
Source? (name, address)
. .
$ See financing
0 Debt?
Source?
Rate/ter:ns? (anticipated)
I Guarantees recuired? ( f Cl:t":n)
-r
-- -
f
, .
.
0 Name, add::-ess, contact person for anticipated 1 . ?
_enaer.
Have not apf?rcached a lender ocher G.'1an ve.....ry preliminarv. Leakinc to
First Bank, Miller Schroeder and/or consortium for financinc.
Estimated
0 ~~ticipated public assistance? $ Land olus $1, 000 , 000
- Land
Form of public assistance? TIF - other
0 Do you have ability to provide personal
financial guarantees if required by lender? Yes
p:::-ojects completed or l.n-process during the last three years_: (T-F
--
you have completed a nmnber of projects, identify those which IDay
be mos-;: similar to what you are proposlng in Hopkins)
0 Name of project(s) , location(s) , specifics:
See Att:.2.ched
.
References: (P:r-ovide name, address, phone .!J.' of at least one
rr S
individual in each of the following areas you have
worked with i::1 the past)
0 Private lending institution?
Name eel Smi t.c'1jIlmy Hen.nen First Minnetonka City Bank 935-8663 .
Address Mark Ouradnick First EarLl.::. Hopkins 936-2637
Phone Marshall MacE<ay ~et.::"osolitan Financial 922-3545
.
Projects completed or in-process in the last three years:
MARCUS
20,000 sq. ft. ( each) H.I. Enterprises Plymouth Retail
Golden Valley service
10,000 sq. ft. (each) KinderCare Woodbury Retail
Chanhassen Daycare
Golden Valley
30,000 sq. ft. The Press Chanhassen Industrial
65,000 sq. ft. Metro Lakes Chanhassen Industrial
5,000 sq. ft. Met Financial Hudson, WI Retail-Bank
15,000 sq. ft. The New England Minnetonka Office
. 12,000 sq. ft. Olson Building Hopkins Office
.
MlI-R,CO
7,000 sq. ft. (each) ciatti's 8 Projects Retail
Restaurant
7,000 sq. .c..... Spur's Madison, WI Retail
.1..'-.
Restaurant
Best Buy 10 Projects Retail
7,000 sq. ft. Pannekoeken 3 Projects Retail
Restaurant
25,000 sq. ft. united Artists Maplewood Retail
Theatre Entertain
RLK
400,000 sq. ft. Park Nicollet st. Louis Pk Office/
Retail
. 150,000 sq. ft. Target Chanhassen Retail
.
300,000 sq. ft. Hartford Eden Prairie commercial/
Residential
250,000 sq. ft. ITT Plymouth Office
__ _0__-
. 0 Public sector? .
S teve ~elJ.::.e City of Ho~kins 939-1326
Name .2l.J'..n Perry Ci ty of Minner.:mka 939-8200
Con AshwDr-,-"~ CiL.Y or G'1annassen 9j f-19UU
p,_ddress
Phone
0 Private sector?
W. Thcrnas Brun.berg CPA's 545-2353
Name Bever1 y Kottas HI En:ccrprises 551-9702
Boo COT:t.lIlgLcn NovaC-are, iliC . :)4:J-)UUl.
Address Grec:J Eswine Kince...rCare (404) 578-4232
Phone
-
0 other?
Name Nelson Berg Berg & Leaf 935-3425
Har::"'j Srru. t.h H09kL~s Eye Clinic 935-2020
Address Larrv Ccwell TwinWest Charnter 540-0234
Phone .
.
Please at"'c.ach the follcw'ing:
-~ ) ::S.:.~pe!:""le!1Ce of . 1 . team including:
c.eve.;..ccmeTlL.
1- resume of Fersons proposed to have either a
develcsrnent or ownership in\:erest.
2 . Detail any similar projects designed or ' '1'
DUl_L..
] - Lis"'c. contractors/ccnsultants proposed to be u-l-~li..,.~,-1
~.....----.....~........
on t.his project.
3) prcE:JOsed timeline ('cased on a Development fl..greemeYl"C. being
executed July 1, 1994)
C) other pertinent. information you feel appropriate to
provide.
.. .
i
!
!
i
I
i
,
t
I
.
DEVELOPMENT TEAM
Developer; Mark O. Senn, Marcus Corporation 593-1177
Architectural/Engineering; Dick Koppy, RLK 933-0972
Contractor; Reg Plowman, Marco Construction 484-5506
OWNERSHIP INTEREST
-
Theatre: Senn/Koppy/others
Restaurant: Ciattifs
Bank: First Bank
Office: senn/Koppy/Others
DEVELOPMENT CONCEPT
ONE DEVELOPER FOR ALL ELEMENTS INCLUDING THE CITY ARTS FACILITY SO .
THAT M&{IMU~ UTILIZATION fu~D COST SAVINGS CAN OCCUR AS WELL AS
! COORDINATION OF COMMON CONSTRUCTION ELEMENTS.
i
TIMELINE
I start: Fall 1994
All elements completed: Fall 1996
. .
-.-
I
.
-
RESUME
MAR...T{ O. S ENN
. .
lliLqCUS CORPORATION
I
!
i
I
e .
~ -~ ..._---~-_.-._--- ---...- -. - - - .
. e
RESUME
MARX o. SENN
CURRENT POSITION: PRESIDENT, MARCUS DEVELOPMENT CORPORATION
1984-Present 10001 Wayzata Boulevard, Suite 100
Minnetonka, Minnesota
Principal Shareholder
MAJOR RESPONSIBILITIES:
1- Act as Real Estate Department for national, regional and local
corporate clients.
A. site Selection/Market Survey E. Tenant Improvement
B. Leasing F. Space Needs Analysis
C. Contract Negotiation G. Government Relations
D. Contract Administration
2 . To create development opportunities.
3. Development of commercial properties for own portfolio.
A. Retail Centers C. Office/Warehouse
B. Office/Manufacturing D. Office
. 4. Commercial build-to-suits for client companies.
5. Provide full services development organization acquisition, .
government approvals, financing, development, leasing,
management, etc.
~20R ACCOMP~ISHMENTS INCLUDE:
Completed development of a large number of commercial projects
and have retained a significant interest in the projects and
their cash flow. Have developed (new construction or rehab)
over millions of square feet of commercial property over this
time period.
PREVIOUS POSITION: PRESIDENT, FIRST CORPORATE REALTY SERVICES, INC.
1984 Minneapolis, Minnesota
(a Division of First Corporate Services)
* This was a one year committment
MAJOR RESPONSIBILITIES:
1. Investment acquisitions.
2. Development of commercial and residential projects for
company's portfolio and various investment groups and/or
portfolios.
3 . Placement of interim construction financing and permanent
. financing for development projects. tit
4. Packaging of syndications for commercial real estate ventures.
i
i
. .
PREVIOUS POSITION: GENERAL MANAGER, OXFORD PROPERTIES, INC.
1981-1984 Minneapolis, Minnesota
ACCOUNTABLE FOR:
st. Paul Town Square from start to finish.
Minneapolis City Center - a 3 Million Square Foot Mixed Use
Development project comprised of five segments:
l. 52-story office tower
2. Major department store
3 . Approximately 100 shops and restaurants
4 . 600+ room hotel
5 . 700+ car parking garage
Management of above and additionally IDS Center, Baker Center,
and North star Center
~JWOR RESPONSIBILITIES~
1. Development, completion, opening start-up and operation.
2 . Employees (300+ in management/operations)
3 . Leasing/lease administration .
e 4 . Tenant/community relations
5. Financial reporting/budgeting ($35 Million budget - City
Center alone)
6. Revenue/receivables
7 . operations (serlices and physical plant)
8 . Special projects as needed
MAJOR ACCOMPLISHMENTS INCLUDE:
l. Developed a top notch organization which is made up of top
notch people with high morale and pride.
2 . Brought project in on plan and on time.
3 . Achieved occupancy levels far above plan (maximized revenues) .
4. Achieved top sales per square foot of all regional malls in
the metropolitan area (maximized revenues-retail) .
5 . Packaged sale of tax benefits to syndicator, allowing removal
or equity from the project and assisted syndications in
marketing product.
6. Took the lead in successfully expanding downtown hours to
compete with other regional malls.
7 . Achieved numerous national and international awards for
project efforts:
PREVIOUS POSITION: DIRECTOR OF DOWNTOWN OPERATIONS/DEVELOPMENT
1972-1981 st. Paul, Minnesota .
e
}, .
I
,
- .
!
i
I
I ACCOUNTABLE FOR:
City's downtown operations, including development and operation
of:
1. city-owned parking system
2. Skyway system
3. Town Square mall and park
! Development of numerous city identified development needs in the
i downtown area and on commercial arteries. Functions include land
i acquisition, project financing, project design and project
management.
~JWOR RESPONSIBILITIES:
1. Development project leader for Town Square, a joint venture
project owned by the City and Oxford.
2. Employees involved in operation of city parking facilities,
skyway system, Town Square mall and park.
3. Attracting developers and facilitating city's development
priorities and needs.
4. Land acquisition, project design, project management.
4Ia 5. Provide financing tools public/private to enhance projects ~
feasibility. _
6. Downtown promotion and marketing.
7. Maximize revenues for city owned operations to provide impetus
for future development efforts.
~~~OR ACCOMPLISHMENTS:
1. Completed numerous development projects in which city had a
role, including Minnesota Mutual, 3M expansion, East and West
Seventh Street revitalization, Science Museum, and numerous
parking ramps and skyways.
2. Development and operation of joint venture Town Square
project. (Overall project manager of joint venture effort.)
3. Developed promotions and marketing program for downtown st.
Paul.
4. Developed parking system profitability owned by city to
service shoppers, business and fringe parking needs.
PREVIOUS POSITIONS:
*While with city of st. Paul, I also held positions as:
-Director of Administration
-Project Manager
4It -City Planner
*priar to joining st. Paul, I held several staff and faculty .
positions at the University of Minnesota.
(
.
'. .
*1 have an extensive background, going back to junior high school,
development and managing commercial real estate (rental and
i office) in conjunction with family owned operations.
I
EDUCATION:
Graduated Hopkins High School
! B.A., University of Minnesota - Magna Cum Laude
, Triple Major - Psychology, Sociology, Social Work
i
Graduate Work: University of Minnesota - psychology
College of st. Thomas Management School-Business
Management
Hubert H. Humphrey Institute (University of
Minnesota) Pubic Administration
-
OTHER DATA:
44 Years or Age Address: 7160 willow View Cove
Married - two children Chanhassen, Minnesota 55317
Excellent health (612) 949-2272
Extensive academic credentials
Extensive continuing Education 200+ hours of continuing legal .
e education credits in contracts and real estate
Licensed Broker
O'!'B:ER ACTIVITIES INCLUDE OR HAVE INCLUDED:
Board Member, Agrotec Corporation
Board Member, Tutari Corporation
City council Member, City of Chanhassen
National League of cities
Downtown council Membership Chair, Marketing Committee, Retail
Committee, and Board
Board of Directors and Executive Committee of Kaiser Roll
Foundation
Building Owners and Managers Association (BOMA)
International council of Shopping Centers ( I CS C )
Lafayette Club
Minnesota Gophers Touchdown Club
HopkinsjMinnetonka Rotary Club
Chairman, Excelsior Planning Commission
Twin West Chamber of Commerce
Executive Board - Boy Scouts of America
Chairman, Challenger District - Boy Scouts of America
Board Member, Tanka united Soccer Association
. University of Minnesota Alumni Association .
Board Member, Evans Scholars Alumni Association
(References will gladly be furnished upon request)
-
. ~
-
Developer Name
Person Completing Form
Superior Average Adequate
Evaluating Factors Full Points 50% Points o Points
Prior developer experience
with projects of a similar
nature or commercially
oriented projects
20 points
Level of public assistance
(Higher points for less
. assistance required)
-
10 points
-
capacity to finance project
20 points
Level of tenant commitment
10 points
General comfort level with
the developer
. 20 points
.
TOTAL POINTS
... .-- ----.
- QUESTIONS - SUBURBAN CHEVROLET PROPERTY REDEVELOPMENT .
-
Please note the following:
0 Primary questions to be asked first, secondary questions if
time permits
0 Some questions may be answered in developer presentation
0 Developer has only 10-15 minutes to answer questions
Primary Questions:
1. Would you require any additional public assistance other than a
land write-down? How would you justify your request?
2 . What is the present level of tenant commitment? How long would
it take to secure signed leases?
3. How and with whom would you anticipate financing this project?
Have you had discussions with them about this project? Who
would be signing the repayment note?
- .
4. What other projects will you be pursuing while working on this
~ project? will this be a priority project for you? Please
detail. Who will be responsible for coordination and project
management?
Secondary Questions:
5. What is the most recent large project you had financed and
completed? How much? When?
6. Do you anticipate that a personal guarantee will be required to
secure financing? Do you have the financial capability to
provide such a guarantee? Please detail. Would your tenants
be willing and able to provide a guarantee?
7. Would you be willing to provide a developer fee at the time a
development agreement is executed to insure completion of the
project (i.e. $5,000)?
8. How long would you anticipate retaining ownership of the project .
- once completed?
--
9. How would you anticipate proceeding if selected?
-...-- ----..-- -..-
.
.
.
Alan Cbazin
5353 Wayzata Blvd., Suite 602
Minneapolis, MN 55416
~
City of Hopkins
1010 First Street South
Hopkins, MN 55343
Attention: Jim Kerrigan
. RE: Alan ChazinlLaSalle Group a Joint Venture
Suburban Chevrolet Site
Dear Mr. Kerrigan:
Enclosed you will find our responses to your Development Questionnaire and
other pertinent information as well. We look forward to an interview with the Ciry
in the near future and being selected for this project.
Sincerely,
?j;;:r ~. ,
L-"{ e~-:...:,;~ c t~..yt L~.
Alan Chazin
March 14, 1994
.
.
l
Specifics of Pro;ect .
Build to suit for Standard Theatres, Inc./Super Saver
Cinemas, an 8 to 10 screen movie theatre approximately
25,000 square feet. In addition, we feel a restaurant
component will work on the site as well.
Tenant Information
1. Standard Theatres lnc./Super Saver Cinema
They have tentatively approved the site subject to developer
being selected then will enter into "serious" negotiations
on a 20 year lease with additional options.
-
2. Restaurants
We have identified some potential users such as "Caribou
Coffee", "Starbucks Coffee", or potentially developing our
own franchise site with Boston Chicken as one example.
Pr04ect Costs ( estimated)
Construction Costs $2,500,000.00 e
Land Costs 0
Soft Costs 500,000.00
This proposal only includes the Southern 2+ Acres of land.
We hope to develope the Northern piece as part of a second
phase with other retail/office uses to be determined.
Anticipated Public Assistance
We are anticipating receiving a clean, buildable site from
the City of Hopkins.
Financial Guarantees
We have the ability to provide personal financial guarantees
if required by lender.
pro;ects completed with similar uses as proposed develoument
1. Hennepin Plaza 5000 Sq. Ft. Retail
2300 Hennepin Ave., Mpls. (Restaurant, Video Store) .
Developed and built by Alan Chazin, owned by JAMTA Ltd.
Partnership. This was a build to suit for the Muffin Man
Restaurant located on a former gas station site. Built
-.
. .
-
- 1991.
-See References for other projects by team.
Anticipated Sources of Funds for prolect
Equity
A. Conventional financing with General Partners providing
the balance as needed
Sources
1- Norwest Bank MN, N.A.
Old St. Anthony Office ~
425 East Hennepin Ave.
Mp Is. , MN 55479-2060
Glenn Sansburn
2. Century Bank
11455 Viking Drive
Eden prairie, MN' 55344
Shel Wert, Presient
e -Specific terms to be determined
B. Private Placement
Raising the money needed with a group of private
investors. This is our preferred method for this project
and we anticipate investor interest in this project to be
high in conjunction with the General Partners.
References
-Private Lending Institution
Norwest Bank - Glenn Sansburn 667-2653
-Public Sector
Dept. of Housing and Urban Development
c/o John Buenger 370-3000
City of Richfield
Mr. Jim Prosser 261-9700
e City of Minnetonka
Ms. Ann Perry 933-2511
MHFA-Housing Finance Agency
Bob adman 296-7608
-- __no --
.
DeveloDment Timeline
March 14, 1994 Questionnaire submitted
April 12, 1994 Interview/selection with Hopkins
Negotiate with tenants, develop plans, arrange financing
Development Agreement - July I, 1994
Start Construction September I, 1994
We anticipate a 6 month construction period.
-
Contractors/Consultants
Architect Baker Associates
General Contractor Alan Chazin
Mechanical HVAC Horowi t z , Inc.
S2.er.::trical Electrical Service e
Site TNork G.L. Contracting
e
.
PROFESSIONAL PROFILE
THOMAS W. LASALLE
LASALLE GROUP, LTD.
PRESID ENT
Thomas LaSalle has been involved for more than twenty years in develoPIIlem,
financing, and management of real estate, primarily through two corporations -
LaSalle Management Group, Ltd. and LaSalle Development Group, Ltd. - wholly
owned by him.
LaSalle Management Group manages approximately 40 properties in several
states, employing approximately 250 people in the management of approximately
3,000 units and produces annual net revenues in excess of $30 million. LMG also
manages approximately 600,000 square feet of commercial office space and a 150
. room Hampton Inn Hotel.
LaSalle Development Group has been very active in the development of a wide
variety of projects. including the 208 unit Nokomis Square Cooperative, Historic
Bremer and Bremer Way, a 24 unit rehab of Bremer Elementary School and 77 unit
elderly condominiums, aU of them market rate properties.
Mr. LaSalle is a partner in the Edinborough project, a 26 acre development in
Edina, Minnesora comprised of 392 condominiums, 103,000 square feet of office
space, 203 unit congregate care senior building, and an acre enclosed park.
Mr. LaSalle was formerly with Shelter Development Corporation and Landtech
Management Corporation in various management positions before establishing his
own company in 1975.
Active in the industry, he is past president of the MiIlilesota Multi-Housing
Association and has served as a director of the National Apartment Association and
the Institute of Real Estate Management. He is a licensed real estate broker and a
member of the Board of Realtors. Mr. LaSalle is a Certified Property Manager, and
LaSalle Management Group, Ltd. is an Accredited Management Organization by
the Institute of Real Estate Management.
.
--
-
-
PROFESSIONAL PROFILE
WILLIA1'vI L. BRUSMA1'\l'
LASALLE GROUP, LTD.
VICE PRESIDENT
William Brusman has been involved more than 15 years in the development and
financing of real estate and in che area of real estate development coordination and
management.
Since joining LaSalle Group in 1984, MI. Brusman has been the project
coordinatOr for the Etiinborough illLxed-use project (offices, city indoor park,
extended stay hOte! and senior rental housing) in Edina, Minnesota, and project
manager for che 150 room Hampton Inn Hotel located in Richfield, MinnesOta.
He is currently serving as Owner's Representative and project coordinator for the
Sinsinawa Mound Renovation project for the Sinsinawa Dominican Sisters, and the e
Adrian Dominican Sisters durinS!: the multi-building renovation of their
Motherhouse campus in Adrian,- Michigan. He is also serving as development
consultam to Epiphany Pines Cacholic Church as they construct a lO9-unit
apartment project for seniors located in Coon Rapids, Minnesota.
Prior to joining LaSalle Group, Ltd., Mr. Brusman was Senior Housing
Underwriter for the Minnesota Housing Finance Agency from 1975 to 1978 and
Vice President of NortWand Mortgage Company's Government Finance Division
from 1979 to 1984.
Mr. Brusman received a BA degree in sociology and economics from Illinois
Wesleyan University, and a :VIA degree in urban planning from the University of
Minnesota.
.
-
-
REFERENCES-LASALLE GROUP
BRANDYCHASE CONDOMINIUMS - James pronger, President
2254-E Benson Avenue
St. Paul, MN 5511.6
H- 699-9311/W- 733-0289
CALHOUN ISLES CONDOMINIUMS- Greg Dolphin, President
3145 Dean Court, #1100
Minneapolis, MN 55416
H- 924-0397
CALVARY CENTER APARTMENTS- Marlys Wurdelman, Pesident
3725 Union Terrace
Plymouth, MN 55441
. H- 546-2934
CALVARY CENTER COOPERATIVE- Jerry Walder, President
7600 Golden Valley Road
Suite 1101
Golden Valley, MN 55427
H- 544-5667
FAIRWAY WOODS- Al Bruce, President
14388 Fairway Drive
Eden prairie, MN 55344
H- 934-9151/W- 941-6401
ROLLING MEADOWS COOPERATIVE- Diane JlBess'I Rassman,
President
3206 East 78th Street
Inver Grove Hghts, MN 55075
H- 457-7681
.
--
---
--
Alan Chazin
5353 Wayzata Blvd., #602
Minneapolis, MN 55416
Representative List of Developments
1978 - Runny Meade Estates - 28 lots - Minnetonka
Land Development & House (eus tom) Construction
County Road 73 & Runny Meade Lane
-
1981 - Chow en Bend Townhomes - 32 uni ts of Section 8 F ami I y
Housing
Burnsville, MN - 126th & Chowen
1983 - Whittier Townhomes - 12 units of Section 8 Family
Housing
Minneapolis, MN - 335 E. 25th Street
(design/competition)
1986 - Braemar Sports Medicine Center - 10,000 Sq. Ft. e
Medical Building
7201 Washington Ave., Edina, MN
1987 - Cedar Hills West - 143 apartment units - Market
Rate Rental Housing
11100 Cedar Hills Blvd. , Minnetonka, MN
1987 - Cedar Hills East - 131 apartment units - Market
Rate Rental Housing
11050 Cedar Hills Blvd., Minnetonka, MN
1990 - Hennepin Plaza - 5000 Sq. Ft. - Retail - Bui 1 t , own,
manage
2300 Hennepin Ave., Mpls. , MN
1993 - Woodhill Pond - 3 lot subdivision for single f ami 1 y
4509 Woodhill Road, Mtka. , MN
Currently actively building custom homes throughout the
Metro area.
.
-
-
References of Alan Chazin
Norwest Bank - Glenn Sansburn 667-2653
Scherer Brothers Lumber - Roger Scherer 379-9633 -
Lehrman, Lehrman, & Flom - Stan Eisenberg 546-5306
The Plumb Shop - Walter Buchman 588-4707
Horowitz Mechanical - Larry Swanson 533-1900
.
.
-
-
Develooment Team
Developer:
A joint venture of Alan Chazin (Alan Chazin Homes Inc.), and LaSalle Group Ltd.
Please be advised that Mr. Alan Chazin of Alan Chazin Homes Inc. and Mr.
William Brusrnan of LaSalle Group Ltd. are the developer representatives and will
be available on a full time basis during the development process.
-
Owner:
A partnership to be formed consisting of the principals of Alan Chazin Homes Inc.,
and LaSalle Group Ltd.
Builders:
Alan Chazin Homes Inc. - A general contractor
Design and Inspecting: e
Architect: Jon Baker - Baker & Associates
Financial Services:
Norwest Bank - Glenn Sansburn
Marketing Services:
Towle Re:ll Estate - Linda Zelm
.
.
r~"l":\;r':""' BAKER ASSOCIATES, INC. ARCHITECTS A.I.A.
. .~ "-'7-1 ~ -..,~
. 'if: 'i :1::. i.
g ~ ::: ~
:- ~~j ~ '~1.~"
f' ..,"
~ ~ ;~~u ~. 514 NICOLLET MAll. SUITE 420 · MINNEAPOLIS, MI NNESQT A . TELEPHONE 339-8601
~'~"""..;,..'r1~.
f.i.1-....._ ......;,.....~.'J
February 15, 1994
Mr. Jim Kerrigan
Director of Planning & Economic Development
City of Hopkins
1010 First Street South ~
Hopkins, MN 55343
Re: Suburban Chevrolet Site
Dear Mr. Kerrigan:
Baker Associates, Inc. is the Architect for the joint venture proposal by Alan Chazin Homes, lnc.
and the LaSalle Group Ltd. to develop the site located at 1100 -1124 and 1105. 1121 Main
. Street. As per Alan Chazin's request, with this letter we transmit office brochures illustrating the
experience of our firm.
In addition to the commercial work illustrated in our brochures, we are also experienced in the
design of facilities for performing arts groups. We have recently completed work for the Jungle
Theater, the Hennepin Center for the Arts and the Minnesota Orchestral Association. We have
also done work in conjunction with the Exhibits Department at the Science Museum of
Minnesota.
In 1991, Baker Associates, Inc. received the Honor Award for Excellence in Mason!)' Design and
Construction from the Minnesota Concrete & Masonry Contractor's Association for both
commercial and residential construction. The commercial construction was a project developed
and constructed by Alan Chazin.
Please do not hesitate to contact me if you need any additional information or have any questions
regarding our firm.
Sincerely,
BAKER ASSOCIATES, INC.
J~\.D~~
Jonathan D, Baker, AlA
President
. Alan Chazin ~
cc:
. . .~
f ~ '. . . ~ .' . .
-'- ,
,~ , ", J '.. ~ ';." "I. ". -";-....
.. . " -. -
'. . ;.r . -- ., .' ~... . '.. .'
- .-
-- _", ~'.: .L. . n\,:: , ... -<-. : . .. "...~ ~ '" - .,. . .~ I ..:r,.-:. .-..\." . ..; . ~ .. - ~.~ .. ~ "
, r .. . . . . I~.... . ~ I ". ~ ..-'
',.
- ..
"
. .. _. . ---
-
BATON CORPORATION "" .
331 Second Avenue North -
Minneapolis, MN 55401
612-341-2886
February 3 , 1994
Mr. Jim Kerrigan, Director of Planning
City of Hopkins
1010 First Street South
Hopkins, MN 55343
-
Re: Suburban Chevrolet Property South of Main Street
Dear Jim:
It 1S with appreciation and enthusiasm that we respond to
the City of Hopkin's willingness to consider a mixed-use
development of retall and owner occupied, multi-family
houslng on the former Suburban Chevrolet property.
.
Baton Corporation 1S a Minnesota Corporation of 18 years
standing and has over that period constructed over 1200
housing units. We a~"" structured to accomplish our own
... -
construction, marketing and management.
We have associated with Lindberg Pierce, Inc. Architects for
the planning and design of our proposal. Together we
believe our team brings a very high level of experIence,
design insights and capacity to perform.
The proposal we have developed 1S for 40 condominium units
and approximately 7000 square feet of retail space. Our
analysis of this site and the Hopkins market as we perceIve
it has lead us to believe that condominium units similar 1n
design and character to the CitiGables Condominium responds
to a continued demand for owner occupied, independent
living, senlor housing In downtown Hopkins. We believe
these homeowners will lend positive support to the vitality
of downtown Hopkins.
Although we are a little less secure with the market for
retail space we believe with a more In depth study to look
for potential need, additional team members expert 1n this
area and an aggressIve approach to leasing we can make thlS
part of the development a success. We are also receptive to .
having the performing arts facility on this site, 1n lieu
of the retail portion of our proposal, should the City
decide to build such a structure.
--
~
We of course look forward to working with the City Council,
HRA, City Staff and other appropriate parties in refining
and tailoring our preliminary design to achieve the most
appropriate Ifit' into the community.
We would welcome the opportunity to amplify on the elements
or this proposal and look forward to the possibilities of
presenting this concept, team and development schedule In
greater detail.
Sincerely, -
S2: --:::=78-'--_
~L . ~ c~l___- L
Steven L. Embretson
Development Coordinator
.
.
DESIGN" DRAWINGS
~~--,-"'-"J ,I!,($.sTREEr
-",<"J v-vo-
~
I lL
......, ~~ S~-j
~ f"Ef?IJ L . '-
~ I crrJoN"L 'Z. JfWt
i ~N!:1~J
~
~
~ ~If- f7'(Nt&
~ ....,..,. ...Jtf.l(rcE ~
I
~ -
i ji.;-~ (J .
'l
~
~
~....E- ~
l".pI"""---'::' i
I ~
4u 0NCq.jINIUM
LN fFb /"C::'N'E-
~ ft~N9.
C-iJ~ f7iNt*;
I ~ CV::"'='
! . ..
~N3ct~C~
~~/U~
1 [
sue;,~-"N Gt"BI~LE-r...sIT? D~LPr~E:NJ ~ .
~\olH'T",;~N ~FJ6l~ 1'-11t04t-l~~
" N.J '
'. . ;"
~..,.N ~~..-N:~ ~. 3:J .;..t7 "'l:>
1,_ _
I.~ r'le';:::e; ~ II ""'" ri" ~ ~:l'-~I - ~ I
.
PROJECT DATA
RESIDENTIAL BUILDING
The condominium section will consist of twelve (12) 2-BR/2-
Bath units and twenty eight ( 28) 1-Br/Den/1-Bath units for a
total of forty (40) units. All units will be ln one three
story building over enclosed parking. One bedroom units
will be 1184 square feet and two bedroom units will be 1260
square feet.
Major amenities include a low maintenance exterior,_ site
lighting, extensive landscaping, underground sprinkler
system, private decks, heated parkJ.ng garage with a mJ.nJ.mum
of one stall per unit, elevator, secured entries, separate
community and craft rooms, fire sprinkler system, decorated
common areas, all kitchen equipment, laundry hook-ups within
each unit, aJ.r conditioning, extensive soundproofing between
units, energy efficient construction, oak trim and cabinets,
and various customizing options.
. Projected sales prl.ce ranges from SSO,OO to $95,000.
Average sales pr1ce includl.ng options and upgrades 1S
." expected to be approximately $85,000.
RETAIL BUILDING
The retail section will consist of a single one-story
building approximately 140' long and 50' deep. The building
would be constructed to allow flexibility in the width of a
bay depending on tenant needs. Our plan calls for twelve
( 12 ) off-street parking spaces.
Amenities will be determined depending on tenant needs.
PURCHASE PRICE
Baton Corporation offers $3,500 per residential unit
($140,00) for the residential portion of the property and
zero to $6.00 per square foot (-0- to $108,000) for the
retil portion depending on specifics. Our offer assumes the
City will be responsible for clearing the site, excessive
soil correction and removal of any contaminated or polluted
. soil.
I
DEVELOPMENT SCHEDULE
RESIDENTIAL BUILDING
Step 1 Develop and finalize a development agreement.
Step 2 Begin sales and marketing program. If sales
efforts prove successful we would proceed to Step
3. If sales efforts are unsuccessful we would
look for alternatives or relinquish our
development rights to the property.
~
Step 3 Apply for necessary zoning and conditional use
permit.
Step 4 Final financing commitment.
Step 5 Finish working drawings and specifications.
step 6 Secure building permits.
Step 7 Construction. .
.. Marketing and pre-sales will start immediately after Step 1.
We would anticipate Step 2 to take four to twelve months
depending an the strength and size of the market and the
pre-sale requirement of our construction lender. We
anticipate the pre-sale requirement to be 70% or 28 units.
We estimate Step 3 to Step 7 to take approximately three
months. Step 7 would take approximately eIght months.
RETAIL BUILDING
I The schedule for developing this portion of our plan would
proceed concurrently with the residential building schedule.
Complete working drawings, application for a building
permit, and construction could not begin until a significant
portion of the building has been pre-leased.
We intend to begin marketing thlS space concurrently with
the marketing schedule of the residential building.
.
. .
QUALIFICATIONS OF THE DEVELOPER
Baton Corporation is a Minnesota Corporation formed in 1976
and is owned in whole by Richard F. Zejdlik. Baton was
formed to continue the work of O.M.Z. Corporation which was
dissolved to reflect new ownership.
Baton Corporation, as was O.M.Z. Corporation. is principally
engaged in real estate development, construction, financing,
property management and real estate sales.
-
History
The history of O.M.Z. Corporation and now Baton Corporation
in housing development dates back to 1968. At this time the
'. prime objective was to organize and promote profit motivated
construction projects through the Department of Housing and
Urban Development's sponsorship of Turnkey Public Housing
and FHA 236 projects. The apparent advantages of
. participation through investment In such projects as HUD
221-D-4, HUD 231 Elderly and HUD Section 8 altered the
original objective and led to the present situation of Baton
Corporation.
Mr. Zejdlikts experience In housing IS particularly broad,
dealing In every type of accommodations for people of all
ages and Income levels. Designs include single family
residences, duplexes, and multi-family facilities that range
from a ten unit townhouse project to a 220 unit high-rise
apartment complex. The Mission R.P.U.D. In Plymouth,
Minnesota entails the design of a tthousing community"
consisting of a combination of townhomes, apartments and
commercial facilities. This broad exposure In housing IS
further exemplified by the successful execution, programlng,
design and systemizing necessary to construct a factory that
pre-assembled single family, low income homes at a rate of
two per week. Increasing evolvement in housing has provided
the developer with insights into all aspects (i.e.
feasibility studies, programming, design, financing,
construction and management) and is continually enhancing
their level of competence in this field.
.
~
- .
Richard F. Zejdlik, President
Richard Zejdlik is a architect and a former partner in the
firm of Zejdlik, Harmala, DeLapp, Inc. J Architects. He
attended St. John's University and the University of
Minnesota and received a Bachelor of Architecture degree
from the University of Minnesota in 1953.
Early architect exper1ence included a executive position
with a maJor Minneapolis based architecture practice which
was incorporated as Zejdlik and Harmala, Inc. , in 1961 and
was Slnce expanded and added other partners.
Mr. Zejdlik 1S active 1n development of housing projects In
both the public and private mark.ets. He IS president of
Redevco Inc. which is a real estate development company
establlshed in 1965 to promote, develop and manage privately
owned housIng projects. In 1968 Mr. Zejdlik organized the
O.M.Z. Corporation, a general contracting firm, to perform
construct10n activities. The activities of this corporation
were taken over by Baton Corporat.ion to reflect new
ownership.
Mr. Zejdlik currently hold the following positions: e
President - Redevco Inc. (Property Management)
President - Baton Corporation (Developer, General
Contractor, Real Estate Sales)
He 1S a registered architect 1n Minnesota, North Dakota,
South Dakota, Wiscons1n, Iowa and Illinois. He IS a member
of the American Institute of Architects and holds a National
Council of Architectural Registration Board Certificate.
Randolph M. Zejdlik, Vice President
Randy Zejdlik attended the University of Minnesota and
received a Bachelor of Architecture 1977. He received his
Minnesota State Real Estate license In 1980.
Randy gained experIence in construction superVISIon and
carpentry working for Baton Corporation and the Lundgren
Brothers Construction Company.
He now acts as Vice President for Baton Corporation and IS
responsible for project costs, job SCheduling and job
procurement. He 1S also responsible for overall management .
of Redevco Inc.
-
.
-
Steven L_ Embretson, Development Coordinator
Steve has worked in the home building business as long as he
can remember. His experience ranges from laborer and
carpenter for his father's home building business, to his
position as Development Coordinator and Marketing Director
for Baton Corporation. He has been involved in a wide
variety of projects including single-family, historical re-
habs, and multi-family [condominiums, townhomes and
apartments] . Steve lS a licensed real estate agent in the
State of Minnesota. He lS a member of the Minneapolis Area
and National Association of Realtors.
Steve received his degree from St. Cloud State University in
Economics, where he also completed substantial course work
in the Business College. After graduating in 1981 he worked
for his father's home remodeling company before joining
Baton Corporation in 1982.
.
.
03, ~~! '94 04: 17 ID:8ATON CORPORATION FAX:341-4255 PAGE 4
r-m 14 '94 14: 13 CO"'MERCIF=L REHL ESiATE P.2/2
-
-
-
.,,- NofMIt a.ni lJiN'JtJBoaI.. N.A.
Sf, Ptl;1 awoe
oM !&It Fifth ~
$i. PlUI, Alln"... 55707
!12Jm.ZZl1
MIlt;b 14. t 994
r
,
Mr. Jim. Kmijoo
Direcw of P1an.a.Jq
City ofHopt:lns -
1010 Fim Shet SoWl
H~.~ 55343
Re: Subw'baa ChllVTOlec Property
40 unifS ofReaid.entia.l Howlng & 1000 5f ofR~l SpaC4l
Dear Mr. KMigon
'Mr. Richard ZoQjllk. h.ii ukDd us to inform you of Ill;: nll1ure and. quality of our ftnancml N1aLiOlUhlp.
Norwc$t l3cUc Mi:lmuoU. St. Paul Office, h.ti prcvldcd interim con~tructlon t1n.a.o.clng 1n the amount of e
$2,1S0M forthc .49--wtit condomicium lOQ~d In Hopir;.ins hOWD u CJti&able&. T'h.ll project \lIU
complcbld 011 time and the Iou repaid shead o(tho iChcdulerl maturity.
We currc.at.ly baVll a SjOOM revolYini line of t;tCdit to Ri~d Zejdhl: pmonally. Th= line i!; h.an.dlc:d A.S
~od.. Mr. ajdllk ls"& wlu.cd T1llatiwahlp cU5t01Iler ofNorwest.
Riohard ~Ik: b.u demOrlitrlltBd the ability tc c:omp!.e!e quality projects, within the proJao:;t:cd bu4liet a:td
<m time.
Norwe8t 8W Mlm1c50ta. St Paul Offu:.e, .h.as not I'el!;C1ivod nor reviewed i. rcqu~t for financing for the
CiootmlpllLed project. We $ willlnj to COll.'lid.r:r providin~ interim alllltruGUon fUWlCinj fer the projoct
I.nd ill.'o'olvin& Norwlllt Mo:tg8.ie, lac. In the pmmlnont tla8.llci.ca nee~ afth.r:l P\ll'OwetS ofindlvidulll
uniu,
Thia is.aot _ ~itnl*nt to furu:I tho COIncmpla~ prol~t.
If you Aced add.itionaJ.1n:furmll1on. plllue f"' freeS to c;onl.a.cl me at 291-4747
Sln~ly,
Jean M. Nelson
Aumant Viu President
.
03/14 '94 <:)4:16 ID:8ATON CORPORATION FAX:341-4255 PAGE 1
. .
D~LOPMENT OUESTIOHNAIRE - YORKER SUBURBAN CHEVROLET PROPER~I
Return no later than 3/14/94
Please attach additional pages if necessary.
Specifics of project: (size of buildinq(s), description, and
proposed use)
See att~~~ BQokfp1"h
~
Tenant information: (proposed tenants, and level of commitment)
. See attached Booklet.
Project costs:
4-0 Unit Senoir Condominium
0 construction costs? $ 2.2~O.OOO.OO
0 Land costs? $ 140.000.00
0 Soft costs? (A"E, finance, legal, etc. ) $ '" 91 ~OOO.OO
Anticipated source of funds for project:
0 Equity? (for construction) S 492.000.00
Source? (name, address) Baton CorD./Rich"nf 7.:ejdlik
. .331 Second Ave. N. Mpls.. MN 55401
0 Debt? (for re1~'d) $ to be determined
Source? Norwest Bank
Rate/terms? (anticipated) Market
Guarantees_required? (form) Lett~r of cr~t ~.,.,-
-
EXPERIENCE -
Baton Corporation
-
.
" - <
~ oJ
.
CITIGABLES CONDOMINIUM A forty-nine unit for-sale condominium building for
HOPKINS, MINNESOTA persons 55 and older. Construction started January
1989. First unit closed in October 1989. Forty units
closed by November 1990.
.
. EXPERIENCE
Continued
.
.
TOWNHOMES OF CITIGABLES Fourteen for-sale townhomes in two buildings.
HOPKINS. MINNESOTA Construction started September. 1987. First
unit closed August. 1988. All fourteen units
closed by December. 1989.
----
SA'TON l;UKPUKA ftUN
1976 \1977 11978 \ 1979 1980 11981 11982 1983 1984 11985 11986 11987 198:
";~;~~~'~:~~~;';";;;;:I~~'~:.~;;;~""""" ...........~I'..-.......I.......... ........... .......... ...........1.......... :..........II....~---
52 rental units. 1i3rd ll!1q Orcharct. ' <
(built in 1972), S1.a mIllIon
. I I
T~\VN SITE HO~lES..~~;~;~~;,.~:~;;~:::::... ...........Lr..........t.......... ........... .......... ........... ..........I......~___.~I.____~___
15 rental units for the elderly
S230.00~.00 I I
....................... ..........1.......... ........... ........... .......... ........... ..........1.......... ---
. _I _I ----
C?t.NDO ELDERLY. Cando. North Dakota
20 renm! units for the e!cterly
S290.00~.00 I ,
~?~\~Par~n1~.f~;~~;t~:~~~:........ .......... .......... ...................... .........-..j'---.-------L,--------.--Lf--------..--r-.c --
51.7 million .
I
~O::;:;f,?nit~1o;~~~iiJ~1y~::::---.~I~~~-~~====1====------jJ-----------r-.--------1'----.----_-Lr,._--------J1-=--------"1=-. --
52.2 mllhon
r
HIGHWOOD. Prior Lake .i..........1........... ...........r...........r..........r..........,'.-cc -
36 ~ection 8 familv rental units
51.3 million .
I I
- ----- I l
I I
WENTWORTH. :.1inneacolis
26 townhomes. 43rd and Wentworth
51.6 million
J . .:. '-- · ~-
. I
~TEVEl'IS SQU. ARE. ~linneacolis
J lownhomes. 4th and 19th Ave. S.
5325.000.00
. I !
....- I L _ I - _L _ _ __ _ I
-:I~~N OAKS. Pl:;;~;;;;-T----------r----------.l-.. ----------r------- ~ I
26 Section 8 familv renta!units
Sl.:! million .
I , __
____ I ---
JACKS'ON PARK. Minneaoolis
9 townhomes, 2Jrd and Quincv ~
5500.000.00 '.
. I _~__ I .~~~... . ~.
UNIVERSITY PLACE. i'<linneacolis
4 townhomes, 8th :\ vi!. SE and 4th St. .
5400.000.00
.' , ,
,...........r.... ...... i....... ....~.-~--;...;~::: -:::::: ::.-
UNIVERSITY HISTORIC REHAB, Minneacolis I 1
4 renovated rental units, 8th Ave. SE ana 4th St.
5450.000.00
., . r f I
._+-
I
EDEN BLUFFS, Eden Prairie
40 town homes
52.!! million
,
J . _ .... _ _. _ ~
.. . ........1..-.------1'--------------
ST. PAUL HISTORIC REHAB. St. Paul I
9 renovated rental units, 523 Laure!, 584-588 Selbv
5450.000.00 .
. .
--- I
C1TISCAPE TOWNHOMES. Minneaoolis
60 tcwnhomes. 3rd Ave. NE and 5th St.
54.5 million .
.1..........~.---
PARKSIDE APARTMENTS, Plvmouth I
211 rent a! units .
S9.3 million
I ~~
Cl'[
63 ..
ss.o
Wf.\.
iJD
16.'
..... PLANNING
CONSTRUCTION
----- SALES