CR 94-228 CO NOS. 1 & 2 Alleyscape \ Y 0 \ () ,Ie- m 1- "" . December 14, 1994 o P K \ ~ Council Report 94-228 Change Order Nos. 1 and 2 Alleyscape & Lots 300/700 Improvements Project 91-13 PrODosed Action. staff recommends adoption of the following motion: Move that Council apDrove Chanqe Orders No. 1 and No. 2 as they relate to the Allevscaoe and Lots 300/700 Imorovements, Pro;ect 91-13. Overview. Alleyscape and parking lot improvements under Project 91-13 are complete. Early on during construction, staff authorized additional expenditures under the contract, and these extra costs need Council approval. Primary Issues to Consider. . What is the nature of the change orders? . What is the cost? . . Staff recommendation. SUDportinq Information. . Change Orders 1 & 2 . Engineer's support letter ~J~~ Ja~s Gessele Engineering Superintendent . . Analvses. . What is the nature of the change orders? Change order No. 1 relates to placement of aggregate base and installation of curb and gutter and bituminous in the east City Hall parking lot. Staff obtained quotes from several contractors for this work, discovered the contractor for Project 91-13 offered the lowest price for performance, and eventually authorized the work done under the contract for 91-13. Change Order No. 2 is composed of three elements: A) Extra contract quantities on Lots 300 and 700 because of plan revision. B) Patching of the bituminous parking lot at the vacated north Suburban Chevrolet site. C) Placement of bituminous overlay to complete the connection of the newly reconstructed alley in the 100 Block between 9th and 10th Avenues North with 9th Avenue. . What is the cost? Change Order No. 1 is for $31,374.00. This amount was budgeted for in the City's 1994 budget for parking lot . improvements at City Hall. As such, this change order is nothing more than anticipated and budgeted construction costs. Change Order No.2 is for $14,830.00. Section A relating to Lot 300/700 plan revisions is for $11,628.00. Section B amounts to $1,552.00, a maintenance cost at the Suburban Chevrolet parking site borne by BRA. Section C costs of $1,650.00 for an overlay paid for out of the Public Works street maintenance budget. Staff recommendati'on. . Staff has examined these change orders as recommended by RLK Associates and advises Council to authorize them. . .. -- . PAY REQUEST NO 1 e CHANGE ORDER NO.1 UNIT UNIT QUANT PRICE AMOUNT ClTY HAll PARKING LOT I 2211.503 AGGREGATE BASE PLACED CLASS 5 CUYD 504 $13.00 $6,552.00 I 0340.601 TYPE 41 WEARING COURSE MIXTURE SQYO 3024 $7.00 I $21,168.00 (3- UFT) I I i 2631.501 CONCRETE CURB AND GUTTER DESIGN 8612 UN FT 522 $7.00 I $3,654.00 I TOTAL CHANGE ORDER 1 $31,37-4.00 I I I . I I I I I I . Page 1 . ALlEYSCAPE C RECONSTRUCTION PROJECT CHANGE ORDER NO 2 PLAN REVISION - AREA OF BITUMINOUS PAVEMENT UNIT LINE NO ITEM NO ITEM UNIT COST QUANT AMOUNT 22 0340.601 TYPE 41 WEARING COURSE MIXTURE (t.5") SOYD $5.00 1157 $5,785.00 23 0340"601 TYPE 31 BASE COURSE MIXTURE (1.5") sa YO $5.00 1157 $5,7 85. 00 24 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL $1.00 58 $58.00 SUBTOTAL $11,628.00 NORTH SUBURBAN CHEV LOT UNIT LINE NO ITEM NO ITEM UNIT COST aUANT AMOUNT 16 2105.501 COMMON EXCAVATION CU YO $8.00 29 $232.00 NIA 0340.601 TYPE 41 WEARING COURSE MIXTURE (3,0") 50 YO $7.50 176 S1 320.00 SUBTOTAL $1,552,00 NOTES COMMON EXCAVATION APPROXIMATELY 0.5' DEPTH ALLEY B UNIT LINE NO ITEM NO ITEM UNIT COST aUANT AMOUNT N/A 0340"601 TYPE 41 WEARING COURSE MIXTURE (3.0") sa YO $7,50 220 $1 650 00 SUBTOTAL $1,650.00 NOTES . NO SUBGRADE PREPARATION PERFORMED TOTAL CHANGE ORDER 2 $14,830.00 . Rl~ 922 Mainstreet Hopkins, Mn. 55343 (612) 933-0972 SSOCIATES LTD. fax: (612) 933-1153 December 14,1994 Mr. Jim Gessele Engineering Coordinator City of Hopkins 10 10 ] st Street Hopkins, MN 55343 RE: Alleyscape Reconstruction Project Justification for Change Orders City Projects 94-13 & 91-13 Dear Jim: The following is additional justification for the change orders which were recommended for payment through payment request number 1 and 2 for the above referenced project. . Change Order 1 This work is tor the majority of the work incurred to complete minor grading, placement of aggregate base, bituminous pavement, and minor concrete work for the City Hal1 Parking Lot. Work was requested and coordinated with City Statf Change Order 2 North Suburban Chev Lot: It was requested by Vern Pankratz that the contractor pave the area of the Suburban Chev lot north of Mainstreet where the building was removed. Alley B: This work involved paving Alley B. This change was requested by City Staff and coordinated with City Staff. . . Civil Engineering . Transportation . Infrastructure Redevelopment . Landscape Architecture . Construction Management e Plan Revision Bituminous: The construction plans contained an error for the bituminous quantity. This change is to revise the quantity to the correct contract amount. If you have any questions, or need additional information, please do not hesitate to contact our office. Sincerely, Y~vY~a ~ ~~ Larry Brown e .