Loading...
CR 94-81 BA Bituminous Seal Coat Project I Y \ 0 V '" ~ 1> ":> . April 22, 1994 0 P K \ ~ Council Report 94-81 BID AWARD 1994 BITUMINOUS SEAL COAT PROJECT prollosed Action. Staff recommends adoption of the following motion: Move to award the contract for the 1994 Bituminous Seal Coat Pro;ect to Bituminous Roadways Inc. The bid opening for the 1994 project was held at city Hall on April 21, 1994. Primary Issues to Consider. o Bid tabulation and recommendation Bidder Total Bid Bituminous Roadways Inc. $27,053.85 Caldwell Asphalt Co. 27,557.90 ASTECH Corp. 27,767.12 . Allied Blacktop 31,259.19 Engineer1s Estimate $26,650.00 All bids were submitted with required bid security and made by qualified contractors. The low bidder, Bituminous Roadways, Inc., has performed seal coating for the city in the past. Their past performance is satisfactory and staff recommends award of bid to this firm. o 1994 Seal Coat Budget The city has budgeted $48,000 towards the current seal coat program. From the time the budget was established, staff has omitted certain neighborhood streets from seal coating consideration, e.g., Knollwood Neighborhood. This in part accounts for the large disparity between the budgeted $48,000 and the contractor's bid of $27,053.85. The low bid is for bituminous material and aggregate installed. The purchase of bituminous patching materials and aggregate mater ials is covered by separate line i tern in the city budget. r LL~- . j es Gessele Engineering superintendent