CR 94-83 PH Alley Reconstruction
"\ y 0
\ \
. . C. .l:-
. ~
-)- ':>
April 27, 1994 o P K \ ~ Council Report 94-83
.
Public Hearing
Alley Reconstruction
Alley itA" - 400 Block 12th/13th AVes. North
Proposed Action.
staff recommends the following motion: Move that Council adopt
Resolution 94-43. Resolution Orderinq Improvement After Public
Hearina.
This action will continue an assessable project in the 400 Block
between 12th/13th Avenues North. Plans and specifications will
be developed for council approval.
Overview.
council at its April 5 meeting considered and accepted a
feasibility report concerning the reconstruction of the
above-referenced alley and ordered a public hearing for May 3.
Notices have been sent to all affected property owners. A public
information meeting was conducted March 23, 1994 for discussion
of all improvement issues, estimated costs, and assessment
policies.
Primary Issues to Consider.
. . What are the current conditions of the alley?
. What are the estimated costs of an improvement?
. staff recommendation.
Supportinq Information.
. Notice of Hearing of Improvement
. Affidavit of Mailing and Mailing List
. Location Map
. Feasibility Report
. Resolution 94-43
Jad::::es~
Engineering Superintendent
.
e Analvsis of Issues.
. What are the current conditions?
The alley under consideration is of bituminous construction.
Asphalt surface conditions are generally poor and
characterized by numerous patches. General deterioration is
caused by lack of good underlying roadway base materials. In
addition there are drainage problems throughout the roadway.
. What are the estimated costs?
Proposed project costs and assessments for a 12' wide alley
are listed below:
Contract Costs $17,815.00
Engineering/Overhead $ 1,782.50
Total $19,597.50
80% share of Total Project Cost
per assessment policy $15,678.00
Assessable lineal footage 650 feet
Lineal Footage Assessment $ 24.12
Assessment Period 10 years
. Interest Rate 8%
. Staff recommendation
Staff recommends that Council order the improvement made and
that plans and specifications be drawn up.
.
CITY OF HOPKINS
4It Hennepin County, Minnesota
AMENDED NOTICE OF HEARING OF IMPROVEMENT
TO WHOM IT MAY CONCERN:
WHEREAS, the city Council of the city of Hopkins, Hennepin
County, Minnesota, deems it necessary and expedient that the
improvement hereinafter described be made,
NOW, THEREFORE, notice is hereby given that the city Council will
hold a public hearing on said improvement at the following
time and place within the said city.
DATE: May 3, 1994
TIME: 7:30 P.M.
LOCATION: CITY HALL
council Chambers
1010 First Street South
Hopkins, MN 55343
The general nature of the improvement is the construction of a
concrete alley, Alley "A", city Project 94-06, in the following
described area:
. 400 Block between 12th/13th Avenues North
THE TOTAL ESTIMATED COST OF SAID IMPROVEMENT IS $19,600.00.
It is proposed to assess every lot, piece or parcel of land
benefitted by said improvement whether abutting thereon or not,
based upon benefits received without regard to cash valuation.
Persons desiring to be heard with reference to the proposed
improvement should be present at this hearing.
This Council proposes to proceed under the authority granted by
Chapter 429 MSA.
Dated this 5th day of April, 1994.
BY ORDER OF THE CITY COUNCIL
/?~
.~~~ .
James A. Genellie, city Clerk
City of Hopkins, Minnesota
, Publish: Hopkins Sailor April 13 and 20
.
. AFFIDAVIT OF MAILING PUBLIC HEARING NOTICE
STATE OF MINNESOTA )
) SS.
COUNCIL OF HOPKINS )
James A. Genellie, being first duly sworn, deposed and says:
I am a United States citizen, over 21 years of age, and the city
Clerk of the city of Hopkins, Minnesota.
On April 14, 1994, acting on behalf of the said city, I
deposited in the United States Post Office at the city of
Hopkins, Minnesota, copies of the attached amended notice of
hearing on proposed assessments, Alley Reconstruction A, Project
94-06, enclosed in sealed envelopes, with postage thereon fully
prepaid, addressed to the following persons at the addresses
appearing on the attached copy of the mailing list.
There is delivery service by United States mail between the place
of mailing and the places so addressed.
. / a4/L
6L---
/~/ Signature
.' ,/
Subscribed and~~rn to before me this 14th day of April, 1994.
~ot0y~
..",..-~-~-vr-r""
~"!"" JAMES T. GESSElE 1
-.~. NOTARY PUBlIC_MINN~SOTA
,--/ HENNEPIN COUNTY
~iffi.f,r "11'1 commISSion expire. 3-19-95 .
.
94-06L:BS . SAM 4-13-94
24-117-2221 0019 24-117-22 21 0020 24-117-22210021
Michael L. & B<!tty J. Mlklsh Morley W. Hesse
.kY J. Robinson 418 12th Avenu~ North 414 12th Avenue North
12th Avenue North Hopkins. MN 55343 Hopkins, MN 55343
Hopkins, MN 55343
24--117.22210022 24-117-22210023 24--117 -22 21 0024
Gladys C. Johnston Vera T. Sicard HarryW. Vrle2:en
410 12th Avenue North 404 12th Avenue North 40212th Avenue North
Hopkins, MN 55343 Hopkins, MN 55343 Hopkins, MN 55343
24-117-22210025 24-117-22210026 24-117-22210027
Gregory R. Olson Kenneth L. Quigley L. J. Weisskirch
401 13th Avenue North 405 13th Avenue North 409 13th Avenue North
Hopkins, MN 55343 Hopkins. MN 55343 Hopkins. MN 55343
24-117-22210028 24-117-22210029 24-117-2221 0030
Steven A. & Jane M. Boyle Douglas A. Wright
Kay F. Kuhn 417 13th Avenue North 425 13th Avenue North
413 13th Avenue North Hopkins, MN 55343 Hopkins, MN 55343
Hopkins, MN 55343
.
.
6::! 67 .-----... TO m_ t -
- -.----'- - - -------- ----~~-- -.--~-- - --- - --- -- - --'~-~----- -
- -
~
. . . . . . - . . . . . . . . . . . . . . . . . . .. _.......~....... ~. -
. --, - - . . ."....."..
-- " . .-
I r ---, --- . .. ~
1 r IT I I . ------1 . I -
- - ""'l 1"'------, 1 I r-- - _ _ _ __...::. _ iID . 'YQ
I .m .~
I I r 1- I r ,. -_
I let "- - --- ! ..
I 16 I I · -1 - . . . r_,
I ~ ~
- :'l) I 12:" -_
s.. '1.. '0 . ...~ '...--
_ ..J. ~.. F -:.:
'0 ~:
I 56
I .
66-
J
I l Tt, a
Il4. J.I
.\ 7 '2
: 12.oC. 2Z: ::- (m--.L-
(1~ 5 lZ.oC
I I II (IA) 5
. - I ..:.~ . 124
....'JIo . ---~~
-- -- --
--- .....)0 -1to
I
I
t
I
I
LU
f
I
I
:z
Z
~ LU
1 >
I <t: !J...J
I .J. .>-" ../10 ."
5T > ''''-.1>
3RD ~:)> - -- N ~ -.Jo <: .,
.,"
.J; I
I t--
I N
- ::I:
~
-
-
I
I
- -
. FEASIBILITY REPORT
CONCRETE ALLEY PAVING
12TH AVE NJ13TH AVE NJ4TH ST N/T.H. 7 SOUTH FRONTAGE ROAD
CITY PROJECT NO. 94-06
MARCH 30, 1994
Introduction
The 1994-98 capital Improvement Plan (C.I.P.) includes an alley paving
project for each year of the five year plan. The 1994 plan identified
two alleys that staff determined was necessary to .upgrade with
concrete paving due to the high maintenance and drainage problems
associated with them. The City Council reviewed these proposed alley
paving projects during their review of the c.r.p. , and subsequently
authorized staff to begin the initial analysis of these projects upon
their adoption of the c.r.p.
Backqround
The alley bounded by 12th Ave N/13th Ave N/4TH St NJT.H. 7 South
Frontage Road is presently considered an unimproved alley. It's
surface consists of a 1" - 1.5" asphalt layer that has poor drainage
characteristics. The combination of the thin asphalt layer and the
poor drainage patterns have resulted in this alley developing many
potholes over the years thereby substantially increasing maintenance
. and other associated problems.
Proposed Desiqn
The proposed alley improvement project provides for the construction
of a concrete pavement surface 12 feet wide and six inches thick in
accordance with the City of Hopkins' improvement policy. A new alley
apron will also be constructed on 4th St N to better match existing
grades on this street. Driveway aprons will be paved between the new
alley surface and the paved driveways with similar material as the top
surface of the driveway . Gravel will be placed in driveway openings
in all situations other than matching concrete or asphalt driveways.
There will be no sod restoration on this project. Black dirt and seed
will be placed in all disturbed turf areas along the alley.
The pavement will include a "V" design, slightly depressed in the
middle, to channel water towards the middle of the alley instead of
towards adjacent properties. rt 1S also proposed that the pavement
grades be established to direct the drainage to an existing storm
sewer system located on 4th Street North.
.
----- .----- "-----
.
Feasibility Report: Project No. 94-06
Page 2
. Proposed Fundinq
It is proposed that the concrete pavement portion of the project be
assessed in accordance with city policy, 80% against abutting
benefitted properties and 20% against the city of Hopkins. It is
further proposed that the cityts share of the project be paid entirely
from the storm sewer utility fund in accordance with city policy.
It has been determined that the fairest method to assess this project
is on a lineal footage basis. It has been further determined that the
maximum lineal footage assessemtn will be based on 75 lineal feet due
to the odd shape of a few parcels. A maximum assessment was chosen in
this situation as a means to determine actual benefit of the project.
A summary of the estimated costs and assessments are provided below.
Proiect Costs
Contract Costs $17,815.00
Engineering/Overhead $ 1,782.50
Total $19,597.50
80% share of Total project Cost
per assessment policy $15,678.00
. Assessable lineal footage 650 feet
Lineal Footage Assessement $ 24.12
Assessment Period 10 years
Interest Rate 8%
Recommendation
It is recommended that the City Council accept the city Engineer's
feasibility report as outlined herein, and order the improvement made
subsequent to holding a public hearing.
Respectfully submitted
L~~'W~
city Engineer
.
..-.-----
, .
'94 ALLEY IMPROVElVIENTS
COST ESTIMATE
. Project 94-06
Allev "An Construction
Item Item Description Unit Quantity Price Amount
1 Remove Bituminous Pavement SY 509.00 2.00 $ 1,018.00
2 Remove Concrete Curb & Gutter LF 18.00 2.00 $ 36.00
., Remove Concrete Driveway Apron SF 70.00 1.00 $ 70.00
-'
4 Sawcut Bituminous LF 255.00 2.00 $ 510.00
5 Sawcut Concrete LF 70.00 3.00 $ 210.00
6 Bituminous Patching SY 65.00 25.00 $ 1,625.00
7 Concrete Pavement (12' wide) SY 508.00 22.00 $ 11,176.00
. 8 Aggregate Base TON 83.00 10.00 $ 830.00
9 Common Excavation (P) CY 13 8.00 10.00 $ 1,380.00
10 Sub grade Correction Cy 28.00 10.00 $ 280.00
11 Concrete Driveway Apron SF 70.00 3.00 $ 210.00
12 Concrete Curb & Gutter LF 18.00 15.00 $ 270.00
13 Seeding LS 1.00 200.00 $ 200.00
Subtotal $ 17,815.00
Overhead 1,782.50
Total This Estimate $ 19,597.50
80% Share $ 15,678.00
.
CAmipro\projects\costes2.sam 3-23-94
. .---
.
Preliminary Assessment Roll
Project 93-06: Alley "A" Improvement
.
1 424 12th Avenue North 24-117-2221 0019 100.00 75.00 $24.12 $1,809.00
2 418 12th A venue North 24-117-22 21 0020 50.00 50.00 $24.12 $1,206.00
3 414 12th A venue North 24-117-2221 0021 50.00 50.00 $24.12 $1,206.00
4 410 12th A venue North 24-117 - 22 21 0022 50.00 50.00 $24.12 $1,206.00
5 404 12th A venue North 24-117-2221 0023 50.00 50.00 $24.12 $1,206.00
6 400 12th A venue North 24-117-2221 0024 50.00 50.00 $24.12 $1,206.00
7 401 13th A venue North 24-117-2221 0025 50.00 50.00 $24'+2 $1,206.00
8 405 13th A venue North 24-117-22 21 0026 50.00 50.00 $24.12 $1,206.00
9 409 13th A venue North 24-117-22 21 0027 50.00 50.00 $24.12 $1,206.00
10 413 13th Avenue North 24-117-22 21 0028 50.00 50.00 $24.12 $1,206.00
11 417 13th Avenue North 24-117-2221 0029 50.00 50.00 $24.12 $1,206.00
12 425 13th Avenue North 24-117-2221 0030 100.00 75.00 $24.12 $1,809.00
. 700 $15,678.00
C:123wlprojects\93-Mpb.wk3 3.23-94
.
NOILJn!H5NO:!311 ~~G
"v.. A3Tl'J :90-\>6 'ro~d (l) 0
,), J . N
N '01 i
t'Il~ HI~]fI~ 'I~~ ~ ~ '1 i
NOiiln <>....
- -~ .
~ a
J .'"
. \
,.)
~~
~n .
~h
~ ~~1
. .
<>
1
I i..iR'. ~'
\
g I
g I
"\
.- i
..
"
:' .. <>
~
I
I
. -" ~ t-
S
0
~
g
8 ~
"t 1
VI
g \
g ..
~ 1
..
- ------- -:;:'
<
8 z
\ ,
g ~
~
:1 N
VI "
"
I
g
.0
,
. i~i
~ n~
...: 15~~
----. - --- [,1 i
h~ G. ~~
m h:
~ 0 1. ~ a
'"
'" '"
-.-...........
'"
. -
. CITY OF HOPKINS
Hennepin County, Minnesota
RESOLUTION NO. 94-43
RESOLUTION ORDERING IMPROVEMENT AFTER PUBLIC HEARING
WHEREAS, a resolution of the City Council adopted the 5th day of
April, 1994, fixed a date for a Council hearing on the
proposed improvement of an alley in the 400 Block between
12th/13th Avenues North, and
WHEREAS, the Council deems it appropriate and expedient to
reconstruct the alley with concrete pavement, and
WHEREAS, ten days mailed notice and two weeks published notice of
the hearing was given, and the hearing was held thereon on
the 3rd day of May, 1994, at which all persons desiring to
be heard were given an opportunity to be heard thereon,
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HOPKINS, MINNESOTA:
1. Such improvement is hereby ordered as proposed in the
Council resolution adopted the 5th day of April, 1994.
. 2. The City Engineer is hereby designated to prepare plans
and specifications for the making of such improvement.
Adopted by the city Council of the City of Hopkins this 3rd day
of May, 1994.
BY:
Charles D. Redepenning, Mayor
ATTEST:
James A. Genellie, City Clerk
.