CR 94-116 PH Alley Re-Construction . " ~ - -~ I y G () >" June 17, 1994 Council Report: 94-116 . 0 P K \ .,I ACCEPT FEASIBILITY REPORT ORDER PUBLIC HEARING ALLEY RE-CONSTRUCTION 8TH AVE NO/9TH AVE NO/1ST ST NO 450 FEET SOUTH OF 1ST ST NO Proposed Action. Staff recommends adoption of the following motion: "Move that Council accept the feasibility report as ordered on June 7 , 1994 and adopt Resolution 94-58 orderinq a Public Hearinq on JulY 19, 1994. II Overview. The city Council at its regular June 7 meeting received from staff a request to undertake a feasibility report concerning the reconstruction of the aforementioned alley. This alley has been identified in the past as having maintenance problems and was listed in the 1994 CIP as in need of upgrading in conjunction with Lot 700. council subsequently authorized staff to do the feasibility study on this project. . Prior to the June 21 Council meeting, a public information meeting will be held with the neighborhood in question to discuss all improvement issues, estimated costs, and assessment policies. staff will therefore be able to inform Council as to any resident concerns when this issue is discussed at the Council meeting. Primary Issues to Consider 0 Should the Council accept the feasibility report? Staff feels it has prepared a complete report and recommends its acceptance. The report is attached. 0 Should the Council order a public hearing? Subsequent to the information meeting, staff is assuming the public will be fully aware of the scope and cost of the proposed project. Staff therefore recommends that Council order a public hearing for July 19, 1994. Supportinq Information 0 Feasibility reports 0 Resolution 94-58 . /C~~~ / . -:.e L '.v) 1-?\ Lee Gusta son " ublic Works Director ~ . FEASIBILITY REPORT CONCRETE ALLEY PAVING 8TH AVE N/9TH AVE N/1ST ST N/450 FEET SOUTH OF 1ST ST NO CITY PROJECT NO. 94-13 JUNE 16, 1994 Introduction The 1994-98 Capital Improvement Plan (C.I.P.) includes an alley paving project for each year of the five year plan. The 1994 plan identified three alleys that staff determined was necessary to upgrade with concrete paving due to the high maintenance and drainage problems associated with them. The City Council reviewed these proposed alley paving projects during their review of the C.I.P., and subsequently authorized staff to begin the initial analysis of these projects upon their adoption of the C.I.P. Backqround The alley bounded by 8th Ave N/9th Ave N/lst st N/450 feet south of 1st st No, is presently considered an unimproved alley. It's surface consists of a 1" - 1.5" asphalt layer that has poor drainage characteristics. The combination of the thin asphalt layer and the poor drainage patterns have resulted in this alley developing many potholes over the years thereby substantially increasing maintenance 4It and other associated problems. Proposed Design The proposed alley improvement project provides for the construction of a concrete pavement surface 12 feet wide and six inches thick ln accordance with the City of Hopkins' improvement policy. A new alley aprons will also be constructed on 1st St N. Driveway aprons will be paved between the new alley surface and the paved driveways with similar material as the top surface of the driveway. Gravel will be placed in driveway openings in all situations other than matching concrete or asphalt driveways. There will be no sod restoration on this project. Black dirt and seed will be placed in all disturbed turf areas along the alley. The pavement will include a "V" design, slightly depressed in the middle, to channel water towards the middle of the alley instead of towards adjacent properties. It is also proposed that the pavement grades be established to direct the drainage to an existing storm sewer system located in this alley. . ----- - -- .- - - - -- ------ Feasibility Report: Project No. 94-13 Page 2 . Proposed Funding It is proposed that the concrete pavement portion of the project be assessed ln accordance with city pOlicy, 80% against abutting benefitted properties and 20% against the city of Hopkins. It is further proposed that the city's share of the project be paid entirely from the storm sewer utility fund in accordance with city policy. It has been determined that the fairest method to assess this project is on a lineal footage basis. It has been further determined that the maximum lineal footage assessment, for a non-square shaped lot, will be based on 75 lineal feet due to the odd shape of a few parcels. A maximum assessment was chosen in this situation as a means to determine actual benefit of the project. A summary of the estimated costs and assessments are provided below. proiect Costs Contract Costs $19,256.00 Engineering/Overhead $ 1,925.13 Total $21,181.13 80% share of Total Project Cost per assessment policy $16,944.90 . Assessable lineal footage 672.15 feet Lineal Footage Assessment $ 25.21 Assessment Period 10 years Interest Rate 8% Recommendation It is recommended that the city Council accept the City Engineer'S feasibility report as outlined herein, and order the improvement made subsequent to holding a public hearing. Respectfully submitted % ///.; ~~~ L~ Gustafson, P.E. city Engineer . ------- ----- 06/16/94 16:01 FAX 612 935 1834 CITY OF HOPKINS 14I 001/002 . '94 ALLEY IMPROVEMENTS COST ESTIMATE . Project 94-13 Allev Construction Item Item Description Unit Quantity Price Amount 1 Remove Bituminous Pavement Sy 622.00 2.00 $ 1,244.00 2 Remove Concrete Curb & Gutter LF 18.00 2.00 $ 36.00 3 Sawcut Bituminous LF 560.00 2.00 $ 1,120.00 4 Bituminous Patching Sy 50.00 25.00 $ 1,250.00 5 Concrete Pavement (It wide) SY 565.00 22.00 $ 12,430.00 6 Aggregate Base TON 85.00 10.00 $ 850.00 7 Common Excavation (P) Cy 134.00 10.00 $ 1,340.00 . 8 Subgrade Correction CY 30.00 10.00 $ 300.00 9 Concrete Driveway Apron SF 72.00 3.00 $ 216.00 10 Concrete Curb & Gutter LF 18.00 15.00 $ 270.00 11 Seeding L5 1.00 200.00 $ 200.00 Subtotal $ 19,256.00 Overhead 1,925.13 Total This Estimate $ 21,181.13 800/. Share $ 16,944.90 . C :Aroipro\projects\proL94\alleys\94-13eslsam 6-15-94 - -- 06/16/94 16:02 FAX 612 935 1834 CITY OF HOPKINS I4JOO2lUUl Preliminary Assessment Roll Project 94-13: Alley Improvement . 1 9 9th A venue North 24-117-2242 0073 34.56 34.56 $25.21 $871.26 2 15 9th Avenue North 24-117-2242 0074 150.00 150.00 $25.21 $3,781.50 3 25 9th A venue North 24-117-22 42 0075 40.00 40.00 $25.21 $1,008.40 4 29 9th Avenue North 24-117-2242 0076 50.00 50.00 $25.21 $1,260.50 5 35 9th Avenue North 24-117-2242 0077 50.00 50.00 $25.21 $1,260.50 6 37 9th A venue North 24-117-2242 0078 25.40 25.40 $25.21 $640.33 7 1st Street North 24-117-2242 0079 4.38 4.38 $25.21 $110.42 8 14 8th Avenue North 24-117-2242 0065 134.26 134.26 $25.21 $3,384.69 9 22 8th Avenue North 24-117-2242 0064 50.00 50.00 $25.21 $1,260.50 10 26 8th A venue North 24-117-2242 0063 45.00 45.00 $25.21 $1,134.45 11 30 8th Avenue North 24-117-2242 0062 121.93 75.00 $25.21 $1,890.75 12 46 8th A venue North 24-117-22 42 0061 13.55 13.55 $25.21 $341. 60 . 672.15 $16,944.90 City of Hopkins to Assume Costs for Properties 7. 8 & 9 . C:U3w\pnl.iecb\94-13ph.wk3 5-16-94 , .)~ST;;; ~ 929.6 92.2.5 ):: X ~--- . 0 z , LlJ ~ J: l; .2 02,500 N ~ ~ - t--. . MAINSTREET ~ 702,000 N / . ( . ALLEY PROJECT 94-13 ''''~ PROPOSED 12' CONCRETE ALLEY . . .~ CITY OF HOPKINS Hennepin county, Minnesota RESOLUTION NO. 94-58 RESOLUTION ORDERING A PUBLIC HEARING TO CONSIDER CONCRETE ALLEY PAVING BETWEEN 8TH AVE NO/9TH AVE NO/1ST ST NO/450 FEET SOUTH OF 1ST ST NO WHEREAS, the city Council authorized and directed the City Engineer to prepare a report with reference to the aforesaid improvement; and WHEREAS, the city Engineer has prepared the aforesaid report for the improvement herein described. NOW THEREFORE BE IT RESOLVED by the city Council of Hopkins, Minnesota: 1. The Council will consider the aforesaid improvement in accordance with the report and the assessment of abutting property for all or a portion of the cost of the alley improvements pursuant to Minnesota Statutes . Chapter 429 at an estimated total cost of the improvement of $21,181.13. 2. A public hearing will be held in the Council Chambers of the city Hall at 1010 First Street South on Tuesday, the 19th of July, 1994 at 7:30 p.m. to consider said improvement. The city clerk shall give mailed and published notice of said hearing and improvement as required by law. Adopted by the city Council of the City of Hopkins this 21st day of June, 1994. By Charles D. Redepenning, Mayor ATTEST: Jim Genellie, City Clerk .