CR 94-138 Order Bids Mainstreet Reconstruction 5th AVE 1 y "\ 0 V I' ~ . July 15, 1994 -'; 0 ~ '" Council Report 94-138 P K \ APPROVE PLANS AND ORDER BIDS MAINSTREET RECONSTRUCTION 5TH AVENUE TO WASHINGTON AVENUE proposed Action. staff recommends adoption of the following motion: "Move that Council Adopt Resolution 94-67. Resolution Approvinq Plans and Specifications Mainstreet Reconstruction - 5th Avenue to Washington Avenue. And Authorize The Advertisinq For Bids." This action will continue an assessable project for those lots abutting Mainstreet from 5th to Washington Avenues. Overview. Council at its July 5 meeting conducted a public hearing concerning reconstruction of the above - referenced section of street. There appeared to be no opposition to the project, but controversy surrounded parking and turn lane issues and the preliminary design . calling for partial removal of the sound wall at T.H. 169. Council directed deletion of sound wall removal from the project and instructed staff and the engineer to work on resolution of parking and turn lane issues. Final plans and specifications are before Council for approval. Primary Issues to Consider. o Design Issues o Costs o project Timetable o Staff Recommendation supporting Information. o Plans and specifications o Revised cost estimate o Resolution 94-67 ~~ . Ji Gessele, Engineering Superintendent council Report 94-138 Page 2 . l' Ana VS1S of Issues. o Design Issues The consultant and staff have met with interested parties in the field to resolve parking issues at Now sports. It appears enough parking spaces can be delineated that will match or exceed existing conditions. Turn lane issues are not fully resolved and staff may simply recommend keeping with a trial period for the current common center turn lane striped from 5th Avenue eastward to Burger King. Consideration of partial sound wall removal has been deleted from the plans and landscaping has been appropriately revised. Staff still needs direction concerning an entrance sign that was originally part of the sound wall removal. o Costs The most current construction cost estimate is at $372,612.00. Adding a 30% overhead factor for contingencies and engineering, the total cost is expected to reach $484,395.00. This is roughly $4,000.00 more than quoted in the feasibility study. Estimates for utility repairs and equipment purchases have risen while other aspects of the contract - street, street lighting, and sidewalk/amenities - have gone down. The new estimates will have . little bearing on the proposed assessments of approximately $68.00/front foot. The current estimate reflects deletion of sound wall removal from the original proposal. o Project timetable July 19 Approve plans and order bids August 11 Bid opening August 16 council awards bid August 22 Construction begins October 25 substantial completion of project Spring 1995 Completion of project o Staff recommendation Staff has reviewed the final plans with the consultant and recommends approval and authorization to proceed with bids. . --------- -----.------w.... ' . Ii' 0: 10 . II I ------- ~. s: " ~ i ~ ~ j ~ I --------I:- )1. 3Nl HJ1V'~ 1i:.O{'-!i~_l'_O[_&__t_i~'OC6 --~vJ3NnKJ1\'f1-lXYoo+- ~ ~~ li:.~ ~ ... . . ~- ~~~..~~ . ':R;~w-- ~ ~ll ~ . . 9i:.orli------aZ'-Of:-&-----gi~.o[fi --. --- 'OO'l}~+--- g 2 s: ~ I 0 6 . ~s I 1/ z g EO B< oeo "<0<e--,-91_ I. --- -. 00'00+ >-0 0 :t "".----- ~- ~ I I ~ f. ~ I. Q 1 Clore I --u Of-&-----Pt"O[a- ~;~-or61 ~ ci - -m:rm-+- ~ ~~ Z o O~G 610rB l orB ~~~~ lAd 00"'8;::+ 1-:2 , 0<. " 0<" " orrr--,--~~ 'i' -00-0,+ HI Q ~ b , 'itl~~ a:~g , ....za: . . <><>+to ~ .,---.-... . eo "'~I ~. .;-6l6' .- I -, ------ ~ 00@f- ~ ; ~ t; , I ' ....l2.z I \ , .... 2 0 . 1;j" - ~t'tl-ze I -Ofl'E\~6- .-Q-,:-'f,.lB----- -[- . ------;-- . (xrO'fi'+ t) !- , i . " -1>fj'ulfi-! 9"';; 5('6 1'~i'e2:-e------ . ----OO-'Ol}+: I- :::I ell 0 :::2:0 ~Z'I3_ZB--t.~'0'tfj____9176~u..i - ----~- OO'CJT+- \:~ t-~ , -~~ -~ . ~~~ ~eg'.--''''_i',.e'6! .----- .--DO'tJi}+- ::I:l;;z l~H?lB 6G'9C':S nrg~a I 8IId OO'ijL+ I I ~I- Cl l{!1iO ..." .....el. .~'.,6 ",,...t - 0000+ ~ ~ ~~ ~ 1 O_~ lti "". _. -c'~'i.ti"i1'. l.'eGe! --oo'oi-'- $ ~rJ)CI: GS"LlG I ~E;:a6 tHra5! lAd aO"!;;\J+ /~ 3: (lQ at-a.To"a. i - "-OO'!l\I+- ~ .. .... ~ ,I, I ~ --9t'-U6 I I..-vae- f '9:f"-i-Gfr-----. J : OO'O\r~-! . m. I: I I <l"''' I -Ll6--G"a.' _L___._ : -{JO'O<+ '.'~ ~~ e 1"' I i';a f'; i I ;q ~~ lXt+U tg'9zh'-9fi,--,'-HI-9l6 - - -- --. ---00:'00+ ~ *:: :: .. . ~ I -Kogi':'!i--9\j~-ti----jrI~'iit6 I - ---r- - -----[)!)'(Je+ -;~~ \ " II ~I i ~ ~l~ nGO 0[97.. I 9::.9l+-- 8,,: : c1__ 00'<)9-1- ~ ~~ : g~ ' I , -= ! I :!:~ I \1 --J -q.ogn L['9la-~lJ'-S~ I : -r--~'-br-' $!-'- --~----oo--:a++-~ -----. I I .,"'O,~ ,I I ~t.J~:6:! , 1 I ; H\ii~ \: i ,I I '------L....... '" "'+ "'r'9Gl6---;-. 'it~~-~-I-tti''S";;:6 --.-- ,-: -----'-00-'0.. I' I I I I 1 ! ': I 1 1 'O~ - OO+~~ 99'';llEr-+-ii91 ~''ii'~,rge6 ~-- I" ------ 00;1JT - 1 I S ' i: ~ Qt;'g;:;tj+~~ar----{I~J'~?:1'i - -- - 'OOT~G+ r 9{''SiZ5 '~--'il'P9lv----9r-'-C-Z6 , ---"'00'('9+ I ( --<;<Sl6 a-s'" ~,,'s""-I-'- --- ----"',.".+- Effffifff'i:'C"=./&, "';L,,-----S'-- : ~~=--;/ __" ~ __ 9-L -g?;6 iH..g~e---!--g-~Zu-_l - ----OO'fl~+ : .r.' -----=-- toL C;-Z6 \;lL'~l6 I "',"1:;;:::5 I :lAd OO'i:;~+ I i 'ON '3.1\Y HlS---- .. : l" '31~'" u!.. " ,~ io (]O-OO-+:O'L ~d bo.g'-~e~-'.:..gr:-e'--,' tmq~ti --;- ,,~\'ru.!::i-.,:;' -------;--.--. OOOvr '- , , " , --- ...--'~ II'~~" I' --- - ---- : I. " :~ I ~ 1 ,,,- [L , Cl:: 1 ~ !~ : ~ ~ ---1----- --- ~ . 0.... u IL " 0 {;~ :5 ~ t5 ~ .:;>...., - -Ir--~ ~ -- -,.. I~ :J I- CP I~ g S ----- __:~__.__1j 5': ___ ~ o 10 C') N . o 0: ~ ------- -- - -------- -------..---r--m' , _u.__~__ i: '__ J ~II ", ~ J ~ I ! f---. _ ' I ~ I I \I i-~- :---~ iS~;~:~ '-- ~----- . ;' ! gll~ ~~~ 0 . I . . ,- ~..._- '~::; !_-- '-- ~ ~ f; ':''''~''> b, I tiL 3 ~ 1', I r---- ~b~ ii' I . ,'/ -- I ,- - -r-- - - ! ~ ~ I W _ --.. -..-.--' wOI- a::WU I ...z~ . -1-- i -- ~~~ i __ i_I --L I. _ 1_ :1I~ 00'" I I I - I, 1--- _ ----. ---.... '- i: ~ ~ ~8 ~. z~~ -~ ~ ---, 1-' ~..... - c( I ' o. wi -} if T- -11- - . ---+ j ~!51 i 00'1- I , !!if -'-. >.lL_ ... ~~ Q~~ 00'" g _'___ ___~ __ $ (!) L i ,i J 1 -- ~ ;----1 -j- :-'-/ . i 1------ i- - - .. _---'-__ ' f---~ - . i ' -- I"~ ~: ' I .,~ . I . i I ~J ~~ - - L -._----:- ._ _ _-. t-- ~__ ~::' I 'I I - J . ~, ""'" ~ I --;;;;;, .,. "" (ilJ - -'/'~B I -r-- - ~ i --.- OOW+ LIlJ -, -i'1-'5-Gd I -L__! -...l_., OO"!J?-J- r--~- I I 'i I ' . , , I' i --- '-[If-",,,,,,-, .. -. _._ OO'ON- I L~'.Br;tJ-- ,f ' --..... - . OO'l)O+-- ~ i! 1 - - -I g'oUI- !--.. .. -I - --- - -OO'DI;'+ i ,,~ - - -- . __ 0009'1-- I I - !!'i1'"E1ctt-- I ----....!....._ _ _ __ O!fOT-J--1 5t: 'SZ6 I 0 l.J\d Ol)"-;;L t- ~::i I "~~I rt'tXij-,I__ -;!:c:--- -- .,---_ _ OO'-(Jl+ I ~,:j;;~ ~ ~~~u ~ i . ~~~~ I ~ . '0 ~ - - I ,lor. . --- . .. - - .--.VfNil""lWI 0000+ -I~ "- ~ -I I :~ Q I I .1. i CL ! g: -:t- -:;j i -~! ---.. ~ I ...... '" 13 I u c> .. g; if is i5 ....... ----i~- ~- - 15 n_ ---. -- . ffi If g. r- ~ ~ & ~ - .- ----. '-';'--- 11 o 101 i : f:! ~ ------- - --"--- --'- -- HOPKINS MAINSTREET PHASE II I i ; . PRELIMINARY COST ANALYSIS i I -- i I --.-.---- - PREPARED ~_UL '( 13, 1994 ; I u I I I I .- , ; ITEM # 'ITEM UNIT I , f EXTENSION lEST QTY. !UNIT COST 1 i , STREETS, 1 . 1, Mobilization L.S. I 11 S 30,000.00 S 30,000.00 2 Grubbing EACH , 5: S 70.00 I $ 350.00 3 i Remove Curb & Gutter L.F. I 1388, S 1.75 i $ 2,429.00 41 Remove Bituminous S.Y. i 4000 S 3.45 '$ 13,800.00 5:Remove Concrete Walk is.Y. i 1030 $ 1.00 i S 1,030.00 6;Remove Cone. DrivewaYIS.Y. 1 280. S 4.60 i $ 1,288.00 7' Remove Light Base EACH I 81 S 115.00 1 $ 920.00 8, Sawcut Sidewalk L.F. I 4001 S 2.40 ! $ 960.00 91 Sawcut Bituminous L.F. 4401 S 3.40 $ 1,496.00 10 I Sawcut Concrete L.F. , 200~ 4.60 $ 920.00 ---..---- .-_.. --------- -- - ~_~_~!2l~ubg~ade Prep. ._ S.Y. , 40001 $ 0.60 S 2,400.00 12! Class 5 Aggrega.!e .TON 1 100! $ 13.80 $ 1,380.00 --- -- 13 Agg. Base, 12" Thick :S.Y. , 3652; S 8.25 $ 30,129.00 , 'S.Y. . 2.00 1 S 14 Mill Bituminous 600 ~ $ 1,200.00 15i4" Bitumin-ous Base is.Y. I 36521 $ 5.50 $ 20,086.00 16 i 1.5" Bituminous Bind'er 1 S.Y. 1 3652; $ 2.75 $ 10,043.00 1711.5" Bituminous Wear Is.Y. I 3652: S 2.50! $ 9,130.00 1 e 18 iTack Coat IGAL 1 5601 S 1.50 i $ 840.00 _~~~ 19 iW~9r Course, Modified ITON ! 2001 s 80.00 I $ 16,000.00 20' Adjust Gate Valve lEACH 41 S 130.00 $ 520.00 21_IAdjust M.~nhole EACH 41 S 200.00 $ 800_00 22B618C&G iL.F. 13881 S 6.25 $ 8,675.00 23 i Traffic Control -- 1 Is IL.S. 10,000.00 $ 10,000.00 24 !Special Signs is.F. 2001 $ 40.00 $ 8,000.00 2511nlaid Crosswalk Markers! EACH 21 i $ 95.00 $ 1,995.00 I i 1 Subtotal Streets i ! : $ 174,391.00 ~-- I .. J o' 1 , --"----- ! . Page 1 . - __u_ ! i I UTILlTIESi I I 11 Remove Storm Sewer I L.F. I 50: $ 10.00 S 500.00 21 Remove Catch Basins lEACH 2 ~ $ 175.00 . S 350.00 3 i Connect To Exist Storm I EACH 11 $ 350.00 i S 350.00 4. Standard Catch Basin rEACH 1 3! $ 1,000.00 · S 3,000.00 5 Standard STMH lEACH 1 1 ! $ 1,200.00 · S 1,200.00 -,.~.. --. 6 12" RCP iL.F. 50' S 25.00 : S 1,250.00 .. - - ---- -. -----.-. . 7 18" RCP iLF. 180. S 32.00 $ 5,750.00 8: Sanitary Spot Rep'air i EAC'H 2 S 5,200.00 ' S 10,400.00 9! Sanitary Se!;'ice Repairl EACH I 2 S 6,300.00 : $ 12,600.00 , ~~ 10! Water Service Repair I EACH i 4 $ 2,300.00 . S 9,200.00 111 Remove/Replace Hyd lEACH 21 $ 3,000.00 $ 6,000.00 12: Relocate Curb Stop EACH 31 $ 1,500.00 ' $ 4,500.00 13: Fill Electric Vault EACH 11 $ 2,000.00 I S 2,000.00 141 Fill Sediment Tanks L.S. 1 11 $ 3,000.00 i S 3.000.00 , T i I ,- .--. .. - Su btotal Util ities 1 :$ 60,110.00 - --..---- , ----. : --- ~ ----- ._.c I - .--. - .. .~--- -- I ! I .- LIGHTING i ! I 1 [Refurbish High Level lEACH 21 $ 480.00 $ 960.00 e 211nstall High Level lEACH 11 S 210.00 $ 210.00 31 Light Bases (AlI-) I EACH 231 $ 280.00 $ 6,440.00 412" ConduitJEmpty) IL.F. 2000 I S 2.00 $ 4,000.00 512" Conduit IL.F. I 2000 i $ 2.00 $ 4,000.00 ___6 ~~ Copper Con~~~tor 1 LF_ 40001 $ 1.00 S 4,000.00 7 iTempor~ryLighting .! L.S. 1 11 S 4,000.00 S 4,000.00 8 Salv~ge ~x..:. High Levels lEACH , 8i $ 71.00 $ 568.00 , - 9 T!~_e Receptacles iEACH i 11: $ 176.00 . $ 1,936.00 .- .-. 10! Modify Exist System !L.S. 1: $ 4,000.00 $ 4,000.00 , '1 , ISubtotal Lighting I ' $ 30,114.00 i I . Page 2 ------ - -- -- . - - ~-_. - C'n '---'~'----~i- - - - I - ~:! 1 SiDEWALKS/AMENITIES I - i -, I~- 1 !Subgrade Prep IS.Y. j 1500! $ 0.60 1 $ 900.00 _ 2!4" Concrete Walks [S.F. -: 93241 $ 2.00 i $ 18,648.00_ _ 312" Steeves in Sidewalk lEACH I 121 $ 12.00 . S 144.00 4fAdjustCastings :EACH I - 4i $ 150.00 I S 600.00 518" Concrete Drives ,S.Y. I 2751 $ 27.00 : S 7,425.00 _ 6JConcrete Pavers is.F. I _ 1000i $ 6.00 i $ 6,000.00 7iPaver Edging I L.F. I 100 $ 4.00 : $ 400.00 81Timber Planter Wall~IL.F. -. 3201 $ 9.00 I $ 2,880.00 . -. ~._.- --I- glConcrete Steps ICY I 21 $ 520.00 I S 1,040.00 101lnstall Tree Grates iEACH -I - 111 $ 150.00 ,S 1,650.00 11 ~J.I Trash Recept. lEACH ! 4, $ 150.00 I $ 600.00 12 I Sodding wi Topsoil I S.Y. f 1000: $ 3.00 r S 3,000.00 - 13tS~reetlPlanter Trees lEACH - J 301 $ 255.00 I $ 7,650.00 141Planter Shrubs lEACH 2261 $ 30.00 i $ 6,780.00 I=---:--- -- -- - --... , - 1 5 JPrairie_,wildflower Seed L.S. _ _ ~I $ 1,000.00; S 1,000.00 16 MuJch Material C.Y. I 201 $ 12.00 1 $ 240.00 17 Deco~a(ive~Rn-n_ _~_L.'S. 1 - 1! $ 5,000.00 1 $ 5,000J50_ I ! I J /subtotal Sidewalks... 1 ___ I : I $ 63,957.00_ I I f--I ,-,' , I I I ! e EQUIPME~T PURCHASES i -- I ; 1- _ 1/SingJe Low Levels EACH I 19i $ 1,500.00 I $ 28,500.00- 21Dbl Low Levels ,EACH i 2] $ 1,700.00 I $ 3,400.00 _ ~~!_~ee Gr:ates/Fram..es lEACH ~ L 121 $ 275,00 I $ 3,300.00 4jBenches _ lEACH ! 21 $ 420.00 I $ 840.00 51Trash Recept. !EACH ! 41 $ 500,00 I S 2,000.00 61Banners/Signs IL.S. _ 1! $ 6,000.00 1 $ 6,000.00 ISubtotal Equipment Ii: $ 44,040.00 I---- ~-~"" I I i I - - j-- - ~- -- I I I I ~ ISUBTOT. STREETS I I I 1$174,391.00 iSUBTOT, UTILITIES ' i J : $ 60,110.00 I-- ~_ ~ SUBTOT. LIGHTING ; $ 30,114,00 -.- -. - --+---- ----- - SUBTOT. S'WALKS $ 63,957.00 ~------_. - ------ ---- - ~- ._- - -~~. . _.- SUBTOTAL EQUIPT. S 44,040.00 .--. - -- "-- .- -- ~ -- --- -- - .- _.- -- ~~. GRAND TOTAL S 372,612.00 e Page 3 -.-.---- . . CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO.: 94-67 RESOLUTION APPROVING PLANS AND SPECIFICATIONS MAINSTREET RECONSTRUCTION - 5TH AVENUE TO WASHINGTON AVENUE AND AUTHORIZE THE ADVERTISING FOR BIDS WHEREAS, pursuant to a resolution passed by the Council on July 5, 1994, plans and specifications for reconstruction of Mainstreet from 5th A venue to Washington Avenue have been prepared by RLK Associates Ltd. , and they have presented such plans and specifications to the Council for approval, NOW THEREFORE BE IT RESOLVED, by the City council of Hopkins, Minnesota: 1. Such plans and specifications, a copy of which are attached hereto and made a part hereof, are hereby approved and ordered placed on file in the office of the City Clerk. 2 . The City Clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement e for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published twice, at least twenty-one days before date set for bid opening, shall specify the work to be done, shall state that bids will be received by the clerk until 10:20 a.m. , on the 11th day of August, 1994, at the city Hall and that no bids shall be considered unless sealed and filed with the clerk and accompanied by a certified check or bid bond, payable to the city of Hopkins, Minnesota for 5% of the amount bid. 3. The clerk and engineer are hereby authorized and instructed to receive, open, and read aloud bids received at the time and place herein noted, and to tabulate the bids received. The Council will consider the bids, and the award of a contract, at the regular city council meeting of August 16, 1994. Adopted this 19th day of July, 1994. Charles D. Redepenning, Mayor ATTEST: - James A. Genellie, City Clerk