CR 92-75 Mainstreet Storm Sewer ,.t. '" \ y 0 \ V k . m .y '" April 2, 1992 o P K \ ~ Council Report: 92-75 Change Order Mainstreet storm Sewer Proposed Action. Staff recommends adoption of the following motion: Move that Council authorize Change Order No.4. Project 90-04B. as it concerns the Mainstreet Reconstruction Project. Overview. Council at March 17 meeting approved plans for relocation of storm sewer pipe onto Mainstreet between 11th and 13th Avenues and ordered bids to be taken for the purchase of pipe and structures. Bids were opened March 30 and award of that contract is part of another report to Council. At the March 17 meeting staff recommended approaching Council with a change order that addressed the cost of pipe and structure installation. This report discusses that change order request. Primary Issues to Consider. 0 What are the costs? C.S. McCrossan has provided a quote for installation services at $110,177.50. As is mentioned in the attached RLK letter of March 26, this quote is reasonably close to the estimate of $104,500 provided in the last Council report of March 17. Together with the low bid of $76,353 for pipe material, and $12,125 for engineering, the total project cost is $198,655. This exceeds the original total project estimate by approximately $6,000. TIF funds are available as a source of funding. 0 What is the justification for this change order? Staff in its last report cited several benefits from a storm sewer relocation, among them ease of maintenance by placing the pipe in a roadway, reduction of intersection ponding on Mainstreet, and enhancement of development potential for the Suburban Chevrolet site. Staff recommends authorization of Change Order No. 4, 90-04B. Supportinq Information. 0 Letter of recommendation from RLK Associates 0 C.S. McCrossan change order quote /J .:fi: 12 f'.Jj~wu>/ .~. ..:x~.~. I .. Jafues Gessele Engineering Superintendent , 922 Mainstreet Hopkins, Mn. 55343 (()12) 933-0972 fax: (612) 933-1153 March 26, 1992 Mr. Lee Gustafson City of Hopkins 1010 First street South Hopkins, MN 55343 Dear Lee, Attached please find a copy of the bid quote from C.S. . McCrossan tor the installatioI1.ofthe 60" storm sewer on Mainstreet. Chuck Poppler and I have both reviewed this quote. The cost is reasonably close to the engineer estimate prepared for this work. Due to this fact, we recommend that the City accept this quote and issue a change order to C.S. McCrossan for the work. If you have any questions or concerns please feel free to give me a call. Sincerely, -....-.. · Civil Engineering · Transportation · Infrastructure Redevelopment · Landscape Architecture · Construction Management 03/26/92 13:41 C. S. MCCROSSFih, I NC. 003 .,. , . ..,or; -x.,~ ...~ C-H.McCro6Ban CDnJJ1truction,lnc. Generftll:oulroLt.Of"5 Box 12-10. 7865 J~fferson HlghWdd. Maple 6rcJVE. Minnesota ~~.:3C9 612/425-4157 f''OX; Cstlml!ltJrllJ U12'f425.052O . AdmlnlS(ratlOn blc:=/~5 Hopkins Malnstraet Improvements Change Ord9f Requast by City of HopklnsIRLK AssocIates 00- Storm SowQr Relocation Bid Date 3126192 I Item 11 t Dosor1ptton I Quantity I Unn 1 Bid PrIcQ f Extension f 1 Remove stonn S9W9r (all slz.es) 206 It 24.00 4,944.00 21nstaff 12" RCP (0'-8' Depth) 275 If 11.35 3,121.25 3 Install 15" RCP (O'-S' Depth) 13 tf 20.00 260.00 4 tnstall24. RCP (10'-12' Depth) 93 rr 18.90 1,757.70 51nstalf 24" RCP (12'-14' D9pth) 89 tf 21.25 1,891.25 6 Install W RCP (12'-14' Depth) 377 rr 62.30 23,481.10 7 Install 60" RCP (14'.164 Depth) 278 tf 75.40 20,961.20 8 Install 6011 RCP (16'-18' QQpth) 110 If 92.50 10,175.00 91nslall TQQ Manhole 2ea 1,700.00 3,500.00 10 Install Catch Basin 6ea 835.00 5,010.00 11 Bulkhead Exist. 60"' RCP 1ea 450.00 450.00 12 Bulkhead Exlsl16- RCP 1 sa 105.00 105.00 13 Connect to exist CB or MH 3ea 350.00 1,050.00 14 Connect to Exist Storm Sewer 1~ 150.00 150.00 15 Install Miter Bend 298 5,125.00 10,250.00 161nslaU Standard Manhole (48" 018.) 1Qa 025.00 925.00 17 FiJI Invert of exist. manhola 1sa 150.00 150.00 18 Sawcut bituminous pav9rJJent 300 If 2.90 870.00 19 Remove/replace bituminous street - 215 'Sf 25.00 5,375.00 20 Removalreplace concrete driveway 25sy 35.00 875.00 21 Remove/replace concrete sldawalk 50 sf 4.50 225.00 22 SOd with 4" topSOil 150 sy 3.50 525.00 23 ConstrucUon Joint for 60" RCP 1ea 3,200.00 3,200.00 24 Additional excavation at san. sewer s$rvices 6aa 1,745.00 10,470.00 25 Wat9r servlc9 Insulal10n @ 6()M 88., 411 thick 200 Sf 2.26 450.00 Total 110,171.50 . NOt98: .',>. ':','",'<:->' a. This pr1ce assumes that the miter beOds are suppiled in two pieces. b. Tra1Tlc Is assumed to be detoured otrof 11th through 13th Aves. for the duration of sanitary through storm sewer Installation. Intersections Will ba opanOd as soon as poSSible to allOW for north/south tramc~ c. Assufl"leS: tfl~ use of excavated trench material for pipe baokflll.