Memo Miscellaneous Assessments
, \ "
<, ~ "
.
' ,
CITY OF HOPKINS
MEMORANDUM
Date: August 26, 1992
To: Honorable Mayor and City council
From: James Gessele, Engineering superintendent
Subject: Assessment Roll
1992 Miscellaneous Assessments
.
. Council at its last regular meeting ordered preparation of an
assessment roll and set a pUblic hearing date as they both
pertain to 1992 miscellaneous assessments. Attached you will
find Exhibit Aas the roll will be commonly known. Some of the
delinquent invoices have been paid since the time of roll
compilation and are so indicated. The public hearing is
scheduled for September 15.
Attachment
JG/rr
-"
-.
''';''-. .
--
.t'" -'w
~ Exhibit A
1. utility Service Connection Charges: 11109 Minnetonka Blvd.
Pid #13-117-22 23 0035 Legal Description: That Part Of
Lot 4 Blk 7 Lying NOf A Line Drawn From A pt On E Line Of
Said Lot 4 Dis 140Ft S Of Ne Cor, ,Thof To A pt On W Line Of
Said Lot 4 Dis 140 Ft S Of Nw Cor Thof And There
Terminating Block 7 Bellgrove Sanitary Sewer Connection
Charge: $6,136.87 Water Main Connection Charge:
$4,713.64 Total Cost: $10,850.51 At 8% Interest Over 15
Years
2. Delinquent Utility Bill: 425 Madison Avenue N Pid
#19-117-21 22 0034 Legal Description: Outlot No 1
campbell Third Addition And Beg At A Pt On S Line Of N 1/2
OfNw 1/4 Dist 1214.03 Ft W From Se Cor Thof Th N At Right
Angles 200 Ft Th W At Right Angles To E Line Of Gn Rr R/W
Th Swly Along Said R/W Line To S Line Of N 1/2 Of Nw 1/4 Th
ETo Beg Ex Road Unplatted 19 117 21 Invoice Amount: \
$219.66 Service Charge: $200.00 Total Amount To Be
Assessed: $419.66 '
3. Delinquent utility Bill: 909 Excelsior Ave E Pid
#l~! 42, ooo~. Le~'~criPtion: III t ~~~t6
, ~ e " ~. u g ~~Pt3"'-,i"1:~oJn
- 0' J:, e, Of ~, 0 Nw_ qd;r The 001: And Lots 7,
., ,1 1 "e dqn) To S . ( IAUlfI JSlt!J92An
~fil~jl~9~<<~i~MiViSiO 0 239 Hennepi
County Minnesota Ex Road Lots 6 To 12 Block 9 Anderson's
1St Addi tion....:r.o... st. Louis Park ' Invoice ..Au\QWl."t.:....$.4,s.3..&1....
---------..... - --.....--....-........---..
~~V~ce Charge: $1~rr.o~ Total Amount To Be Assessed:
$643.82 '
4. Delinquent utility Bill: 301 18Th Avenue N pid
#23-117-22 14 0006 Legal Description: Lot 013 Block oa1 '
West ,Minneapolis Third Division . Invbice Amount: $168-.76
Service Charge: $100.00 Total Amount To Be Assessed:
$268.76
p. Project 91-09 Nuisance Abatement: 2100 Mainstreet Pid
#23-117-22 42 0056 Legal Description: That Part Of W 1/2
Of Se 1/4 Desc As Beg At Ne Cor Of Sw 1/4 Of Se 1/4 Th S
Along ELine Thof 58 Ft Th W At Rt Angles 175 Ft Th N At Rt
Angles 19 Ft Th W At Rt Angles 109 Ft Th N At Rt Angles 139
Ft Th E AtRt Angles 209 Ft To Ctr Line Of Shady Oak Rd Th
Sely Along Said Ctr Line To E Line Of W 1/2 Of Se 1/4 Th S
To Beg Ex Road Unplatted 23 117 22 Construction Cost:
$34,511.31 Administrative Fee: $1,694.58 Total Cost:
$36,205.89 At 8% Interest Over 10 Years
~- 6. Delinquent utility Bill: 2100 Mainstreet Pid #23-117-22
-~ 43 0069 tegal Description: That Part Of W 1/2 Of Se 1/4
.
,-
. Desc As Beg At Ne Cor Of Sw 1/4 Of Se 1/4 Th S Along ELine
Thof 58 Ft Th W At Rt Angles 175 Ft ThN At Rt Angles 19 Ft
Th W AtRt Angles 109 Ft Th N At Rt Angles 139 Ft Th E At
Rt Angles 209 Ft To ctr Line Of 'shady Oak Rd Th Sely Along
Said ctr Line To ELine Of W 1/2 Of Se 1/4 Th S To Beg Ex
Road Unplatted 23 117 22 Invoice Amount: $249.79
Service Charge: $400.0~ Total Amount To Be Assessed:
$649.80
7. Delinquent Utility Bill: 2012 Mainstreet pid #23-117-22
44 0001 Legal Description: Com At A pt In The Ctr Line
Of 19Th Ave Dis 689 3/10 Ft N From N Line Of C M & st PR/W
Th W At Rt Angles To E Line Of Co Rd No 61 Th N Along Said
ELine ToS Line Of Excelsior Ave Th E Along Said S Line To
Ctr Line Of 19Th Ave Th S To Beg Ex Road Unplatted 23 117
22 Invoice Amount: $17,927.79 Service Charge: $500.01
Total Amount To Be Assessed: $18,427.80
8. Delinquent Invoice For Diseased Tree Removal: 2012
Mainstreet pid #23-117-22 44 0001 Legal Description:
Com At A pt In The Ctr Line Of 19Th Ave Dis 689 3/10 Ft N
From N Line Of C M & st P R/W Th.W At Rt Angles To ELine
Of Co Rd No 61 ThN Along Said E Line To S Line Of
Excelsior Ave Th E Along Said SLine To Ctr Line Of 19Th
Ave Th S To Beg Ex Road Unplatted 23 117 22 Invoice
. Amount: $1,300.00 Service charge: ' $50.00 Total Amount
To Be Assessed: $1,350.00
,9. Project 91-17 Fire Protection System: 1426-28 Mainstreet
pid #24-117-22 33 0003 Legal Description: Comm At A Pt
In The S Line Of Excelsior Ave 389 Ft W From The E Line Of
The Sw 1/4 Of The Sw 1/4 Of Sec 24 Township 117 Range 22 Th
W Along Said S LineA Distance Of 239.4 Ft Th S 350 Ft
Parallel with The E Line Thereof Th E 259.2 Ft Parallel
with The S Line Of Excelsior Ave Th Nly To The pt Of Beg,
Hennepin County, Minnesota Unplatted 24 '117 22
Construction Cost: $5,500.00 Administrative Fee:
$275.00 Total Cost: $5,775.00 At 8% Interest Over 10
Years
iO.Maintenance Of Parking Ramp: 26 10Th 'Avenue S pid
#24-117-22 34 0123 Legal Description: Lots 14, 15 And 16
Blk 6 West Mpls Also Lots 18 Through 22 Inclusive Said Blk
6 And Th S 15 Ft Of Lot 23 Said Blk 6, Including The
Adjoining 1/2 Of The Vac Alley Block 6 West Minneapolis
Total cost: $141586.08
,
11.Delinquent Invoice For No Trespassing Sign: 66Th Avenue N
, pid #24-117-22 42 0029 Legal Description: Incl Adj 1/2 Of
Alley VacLot 9 Block 65 West Minneapolis Second Division
~. Invoice Amount: $98.85 Service Charge: $50.00 Total
Amount To Be Assessed: $148.85
.
I
r --;,.
.r. 12.Project 91-14 Fire ,Protection System: 29 9Th Avenue N pid
#24-117-22 42 0076 Legal Description: Lot 19 Block 67
I West Minneapolis Second Division Construction Cost:
I $2,765.00 Administrative Fee: $138.25 Total Cost:
I $2,903.25 At 8% Interest Over 10 Years .
, 13.Delinquent utility Bill: 17 8Th Avenue Spid #24-117-22
43 0093 Legal Description: Lots 44 And 45 Also The N 30
Ft Of Lot 43 Block 3 West Minneapolis Invoice Amount:
$252.23 Service Charge: $550.01 Total Amount To Be
Assessed: $802.24
14.Delinquent Invoice For False Fire Alarm: 810 1St Street S
#200 pid #24-117-22 43 0152 Legal Description: Lots 7,
8 And 9 Blk 13 West Mpls Including The Adjoining 1/2 Of The
Vac Alley Block 13 West Minneapolis Invoice Amount:
$50.00 Service charge: $50.00 Total Amount To Be
Assessed: $100.00
15.Delinquent utility Bill: 633 8Th Avenue S Pid #25-117-22
II 13 0074 Legal Description: Lot 15 Block 61 West
Minneapolis Invoice Amount: $339.10 ,Service Charge:
I $150.00 Total Amount To Be Assessed: $489.10
I '
I 16.Delinquent utility Bill: Pid #25~117-22 24 0022 Legal
"'1 Description: Lots 4 And 5 Block 56 West Minneapolis
~I Invoice Amount: $91.5~ Service Charge: $150.00 Total
j Amount To Be Assessed: $241.58
I 17. Delinquent Storm Sewer utility Bill': Pid #24-117-22 44
0051 Legal Description: That Part Of The 100 Ft Rr R/W
Across The Se 1/4 Of The Se 1/4 Sec 24 T117 R 22
I Corresponding To That ,part Of Lot 26 Aud Sub No 242 Lying
Nly Of A Line Par And'Dis 100 Ft Sly Of ,The Most Nly Line
Of Said Lot 26 Ex That Part Deeded To A F Hagen And Pergood
,Co Subject To Esmts For Co Rd No 18 As Desc In Docs
#4296582 And #4445166 Auditor's Subdivision No. 242
Invoice Amount: $460.47 Service Charge: $55.03 Total
I Amount To Be Assessed: $515.50
.
18.Delinquent storm Sewer utility Bill: Pid #24-117-22 43
0004 'Legal Description: That Part Of The W 1/2 Of The Se
1/4 Of Sec 24 T 117 R 22 Hennepin County Minn Des As
i Follows Beg At The Point Of Intersec Of The Sly R/W Line Of
I Excelsior Ave And A Line 50 Ft swly Of And Par With The
i Centerline Of The chicago & North Western R/R R/W Th Sely
I Along Said Parallel Line To The Ely R/W Line Of 6 Th Ave
I Thence Ely Parallel With The Sly R/W Line Of Excelsior Ave
i To A Line 30Ft Swly Of And Par with The Centerline Of
" I Said R/R Th Sely Par with Said R/R Centerline To The ELine
'. Of Said 1/2 Th,N Along Said E Line To A Line 22.58 Ft N Of
'-" And Par With The Centerline Of Said R/R Th Nwly Par with
.
."",- . 't-.,,-....
.-- , Said R/R Centerline To Unplatted 24 117 22 Invoice
, Amount: $460.47 Service Charge: $55.03 Total Amount
. To Be Assessed: $515.50 .
19.0elinquent Storm Sewer Utility Bill: pid #24-117-22 42
0170 Legal Description: That Part Of 60 Ft Wide Rr R/W
Across Nw 1/4 Of Se 1/4 Lying E Of Ely R/W Of 7Th Ave And
Lying N Of Ctrline Of Excelsior Ave And Lying Nely Of A .
Line Par And Dis 15 Ft swly From The Ctrline Of The Main
Track Of chicago & NwTrans Co As Track Is Located
Unplatted 24 117 22 Invoice Amount: $460.47 Service
charge: $55.03 Total Amount To Be Assessed: $515.50
20.0elinquent Storm Sewer Utility Bill: Pld #24-117-22 42
0168 Legal Description: That Part Of The 60 Ft Wide Rr
R/W In The Nw 1/4 Of Se 1/4 Of Sec 24 Desc As Follows Beg
-At The Intersec Of The Swly R/W Line And The N Line Of 1St
Street Th Sely Along Said R/W Line To The E Line Of 8Th Ave
Th N To A pt On Said ELine Dis 15 Ft SwlyFrom The Ctrline
Of The Main Track Of Chicago And Northwestern Trans Co Th
Sely And Par With Said Ctrline To TheW Line Of 7Th Ave Th
Sly To Swly Rr R/W Line Th Sely Along Said R/WTo The E
Line Of 7Th Ave Th Nly To The N~ly Line Of Said Rr R/W Th
Nwly Along Said Nely R/W Line To The N Line Of 1St Street
ThWly To Beg Incl That Part Of' Above Desc Rr R/W Lying
. within The Ne114 Of The Sw 1/4 Said Sec 24 Unplatted 24
117 22 Invoice Amount: $460.47 Service Charge: $55.03
Total Amount To Be Ass~ssed: $515.50
21.Delinquent Storm Sewer utility Bill: Pid #24-117-22 31
0132 Legal Description: That Part Of The60Ft Wide Rr
R/W In S 1/2 Of Sec 24 Desc As Follows Beg At Intersec Of
The N Line Of S 1/2 Of Sec 24 And The SW R/W Line Of The .
Chicago & Nw Ry Th Sely Along Said R/W To The Ctrline Of
The Alley In Blk 78 Of West Mpls 2Nd Div,Th N Along The Ext
Of Said Alley Ctrline ToA Line Which Is 15 Ft swly From
And Par with The Ctrline Of The Main Track Of Said Rr Th
Sely Along Said Par Line To TheNly Ext Of E Line Of Lot 7
Of Said Blk 78 Th S To Ne Cor Of Said Lot 7 Th Sely Along .
Rr R/W To The W Line Of Lot 13 In Blk 79 Th N Along Ext Of
. Said W Line To A Line Which Is 15 Ft Swly From & Par with
The Ctrline Of The Main Track Of Said RrTh Sely Along Said
Par Line To The N Line Of 1St st N Th E Along The N Line Of
1St st N To The Nely Line Of Rr R/W Th Nwly Along Said Nely
R/W Line To The N Line Of The sw 1/4 Of Sec 24 Then W To
Beg Unplatted 24 117 22 Invoice Amount: $460.47,
Service Charge: $55.03 Total Amount To Be Assessed:
$515.50
22.Delinquent Storm Sewer utility Bill: pid #24-117-22 23
~ . 0001 Legal Des~ription: R/W Across Nw 1/4 Unplatted 24
__.. 117 22 Invoice Amount: $460.47 Service charge:
$55.03 Total Amount To Be Assessed: $515.50
- - - ----- ----------
7'w .<\....,.
,
. 23.Delinquent Storm Sewer utility Bill: pid #23-117-22 14
0002 Legal Description: R/W Across Se 1/4 Of Ne 1/4 Ex
, ' sts Unplatted 23 117 22 Invoice Amount: $460.47
Service Charge: $55.03 Total Amount To Be Assessed:
$515.50
24.Delinquent'Storm Sewer Utility Bill: Pid #19-117~21 42
0036 Legal Description: That Part Of Lot 96 Aud SubdNo
239 Hennepin County Minn Lying Sly Of The Nly 25 Ft Thof
And That Part Of The Nly 25 Ft Of Said Lot 96 Lying Wly Of
The Sly Ext Of The W Line Of Tract 0 Reg Land Survey No 561
Unplatted 19 117 21 Invoice Amount: $460.47 Service
Charge: $55.03 Total Amount To Be Assessed: $515.50
25.Delinquent Storm Sewer Utility Bill: pid #19-117-21 14
0005 Legal Description: Com At A PtIn The E Line Of Monk
Ave oist 14 48/1.00 Ft S From Its Intersec With The Nwly
Line Of Lot 97 Th Nely 845 Ft Par With Nwly Line Of Lot 97
Th N 14 48/100 Ft Par With E Line Of Monk Ave To Said Nwly
Line Thereof Th Nely To Ne Cor Of Lot 97 Th S To Sely Cor
ThereofTh Swly To Sw Cor Thereof Th Nly To Beg Subject To
Road Auditor's Subdivision No. 239 Invoice Amount:
$460.47 Service Charge: $55.03 Total Amount To Be
Assessed: $515.50
'. 26.Delinquent Storm Sewer Utility Bill: Pid #19-127~21 31
0002 Legal Description: H C R R A R/W Across Sw 1/4 Ex
Roads Unplatted 19 117 21 Invoice Amount: $460.48
Service Charge: $55.02 Total Amount To Be Assessed:
$515.50
'-)
.
~.~ !
.
I
I