Loading...
CR 92-227 Approve Plans Westbrook Way . . . November 4, 1992 \ "\ y 0 C! ... m -'; '" o P K \ ~ Council Report: 92-227 Approve Plans and Specifications Order Bids Westbrooke Way Proposed Action. staff recommends the following motion: Move that Council adopt Resolution 92-99. Resolution Approvinq Plans and Specifications. Street and Utility Reconstruction - Westbrooke Way. Proiect 92-08. and Authorizinq the Advertisinq for Bids. Overview. Council at its July 21 meeting reviewed and accepted the feasibility report concerning the reconstruction of Westbrooke Way from 11th Avenue to Old Settlers Trail. A public hearing was ordered for August 18 at which time council considered a preliminary street and storm sewer design and proposals for street lighting, sidewalk, trail and landscaping. Comments were taken from residents and the Meadow Creek condominium Association before Council went on to order final plans to be drawn up. Those final plans and specifications are before Council for final approva 1. Primary Issues to Consider. · Design and construction · Alternate bid items · costs/Assessments · Coordination with residents and recommendation · project timetable Supportinq Information. · Plans and specifications · Preliminary estimates - Assessment Roll · Timetable · Resolution 92-99 Ja~~ IL,L- James Gessele Engineering Superintendent e Analysis. . Design and construction proposed street improvements on Westbrooke Way consist of removing the existing roadway from 11th Avenue to 9th Avenue and removing the private roadway near Nine Mile Creek to its terminus. Proposed improvements will correct drainage problems with catch basins that outlet to Nine Mile Creek. Three feet of the existing roadbed will be subcut the entire length of the project to remove upper portions of peat and muck soils. The subcut area will be backfilled with compacted granular borrow material over a geotextile fabric to provide stability and prevent contamination of the granular material with the remaining peat soils. e From 11th Avenue to 9th Avenue the roadway will be 36 feet wide with no parking on either side. council is alerted that residents may petition for lifting of the parking restrictions. The roadway from 9th Avenue to a proposed divided street will be 30 feet in width with no parking. The remaining roadway to its intersection with Smetana will be of parkway design: a 15-foot southbound lane with no parking and a 24-foot northbound lane with approximately 30 parallel parking stalls. A 30 foot tree-lined grass median will divide the driving lanes. Amenities included in this plan are installation of a concrete sidewalk on the north side of Westbrooke Way between 11th Avenue and 9th Avenue, an 8-foot bituminous path between the roadway and the creek from 9th Avenue to Smetana Road, intensive tree and shrub landscaping in the parkway section of the roadway, and new street lighting. NSP has designed a system of traditional style lighting (carriage lantern) with poles at 160-foot intervals along the entire project. The area south of Old Settlers Trail will be cleared of existing trees to accommodate a surcharge period. Granular material will be heaped upon the area to compress the underlying peat and muck before the road is constructed, thereby minimizing settlement after the road is constructed. It is proposed to begin surcharging in January 1993 and complete the process during July 1994. Originally this surcharge period was estimated at six months. Subsequent soil tests indicate the need for an 1S-month surcharge to maximize compression of peat and settlement. e Because of the long surcharge period south of Old Settlers Trail, because of numerous Westbrooke and Meadow Creek parking lot access points on to Westbrooke Way, and because the roadway will be closed at times, construction will need to be phased. Phasing of construction will be needed to provide ingress/egress for all residents from their parking e lots or garages to existing City streets. In some cases temporary driveways will be provided between the parking lots. · Alternate bid items Westbrooke North Association has sought the city's assistance in placing needed improvements at their complex on the Westbrooke Way bid proposal. There is a potential for cost savings by including bituminous parking lot improvements on this bid proposal as an alternate bid item. Acceptance of the bid would be at the Association's discretion and the city would bill the Association were the bid to be accepted. Another alternate bid item would include improvements to a city parking lot at the northeast corner of 9th Avenue and Westbrooke Way. . . Costs/Assessments See the attached sheet for preliminary estimates/assessment roll. This sheet also illustrates cost participation by various parties. Because of the unique surcharge requirements the contract will need to be split into two schedules. The one schedule will address surcharge costs and Council will be asked to award that portion of the contract at its December 8 meeting. The other schedule will address all other project costs and staff recommends that portion of the contract be awarded in March after normal assessment and appeal process procedures have run their course. . coordination with residents and recommendation RCM Associates has met with Meadow Creek Association members to discuss these final plans. Meetings with Westbrooke West and Westbrooke Park are scheduled for next week. Neighborhood issues apparently have been addressed. Staff recommends accepting the plans for improvements estimated to cost $791,000 as proposed in the feasibility study. . cn-l fTI-< 0-0 -:jn ~ 0)> zr ;~ nO VI 0) - Z <n ITl .., , )> , :]I . -0 )> Xl 3-1 z-< (;)-0 - enn ~ fTI)> or -I o z T ....,- I Ul ..... + 3: fTll'" !20 )>. :z ~ -I '0 "0 <n _0 F C1J <n o o Z en fTI -I )> TH AVENUE II N ~ <n ~ CD UI 0) "Tl , "Tl .1. co Dl Ql n C1J G'l ~::EU! )>'<n znc coco r3:n )>"oc ;0)>-1 ....nCD _-I)> r!!!n r~;><; <n.... fTI- rr fTlr nfTI -10 "1 CD ~ III n C1J ....IN G'l .!n~ + ~::EU! )>'1.1> znc coco ~~2 ::0)>'" "nm _-I)> rlTln rO;><; <n.... pF fTlr ofTI -10 CTlNCO- ;~~~ ~~~"l ;o3:zm fTI_o=i ~ZCc -Igu>~ /'T1<n~z mmno )>)>;><;c I.I>Ul Ul ITlfTI8::E ~8~~ ,,)>,::0 8~3:n ..,fTlE,~ N'O::O N~..,<n .= 5" N fTI nO lH I ~~~~ l:l~ 8 Ul .~ .., ~ ~ "0 .~ ~ ~ ffi ;:::: ~ i> ..L H:>J.IO 9NUSIX3 9 TH 1.1> :20 o ~: tD c,"'~ ibfc~ "'J..:pO "'~~ "'~~ ~Y;') 'to'; <n '"0 9 2l r '"0 CD 0 o Ul ::0 fTI _ 0 Z 1.1> G'l -I r 0 o ::0 n 3:: ~ <n _ ITl o ::E z ITl ::0 0nr .", ~ N I . 03: 01Tl z)> 00 00 3:::E - tD ~::o cO 3::0 <n^ ITl C1J.,. <n' 0-1 00 "0 Ul o F o b l/l /11 ::! r /11 :xl l/l --I ~ r= ! ~Ui z . 00 ::0 "0- )>~ ::02 ^G'l zr Cl)> _2 fTI Ul 7' N 0'"0 ,,::0 ::E~ 1Tl0 UlUl -I1Tl tDO ;OfTI g~ ^1Tl ITlz ::E!!! ~iE l/l 3: ~ z )> o :xl <: /11 ~ . ~ ~3!;li. Rio=l"" fij'll: & III ~ ~. <n -I o 5 Xl ::l: '"O-:!: III ;>;::!: Ul z"O en -I ~ Ul::OfTI CDG'l . O::l: :::0 C <m 8::0 3:mXl ITl -3: ;>;: Z III C1J Ill" iiiz - Ul-l<n ::l: OUl-l )> -I :::0 '< )> m III -l ,-0 c> [(~ iD ID ro ~ :II m < in is % .. .. n ;, ~ " ::> '" 5 3 . ~ ll. .. c :/ .. '< 3 . PRELIMINARY ESTIMATES ASSESSMENT ROLL WESTBROOKE WAY Item city Meadow Creek Westbrooke Park Westbrooke West Total 1) street: 11th Ave. to 9th Ave. 36,100 . 42,200 42,200 120,500 9th Ave. to Old Settlers 69,780 162,850 232,630 Old Settlers to Smetana 231,100 231,100 2) storm Sewer 57,760 76,335 134,095 3) Lighting 31,600 3,300 3,300 38,200 4) Trail 12,670 12,670 sidewalk 5) a) 11,200 11,200 Landscaping 10,500 10,500 TOTAL 163,640 525,055(a) 56,700(b) 45,500(c) 790,895 (a) Average assessment per unit is $980.00 based on 536 assessable units. (b) Average assessment per unit owner is $338.00 based on 168 assessable units. (c) Average assessment per unit owner is $259.00 based on 176 assessable units. . . . - Westbrooke Way Timetable November 10 council approves plans November 11 & 18 November 13 & 20 Ad in Sailor Ad in Construction Bulletin December 2 Bid opening 10 A.M. December 8 Award Bid (Surcharge schedule) Council orders assessment roll December 15 council orders assessment hearing January 19, 1993 Assessment hearing opens February 2, 1993 council closes assessment hearing and adopts roll March 16, 1993 End of 3o-day appeal period - council awards construction schedule bid June 1, 1993 Begin Phase I of construction . . e CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 92-99 RESOLUTION APPROVING PLANS AND SPECIFICATIONS STREET AND UTILITY RECONSTRUCTION - WESTBROOKE WAY, PROJECT 92-08 AND AUTHORIZE THE ADVERTISING FOR BIDS WHEREAS, pursuant to a resolution passed by the council on August 18, 1992, plans and specifications for reconstruction of streets and storm sewer, Westbrooke Way, have been prepared by RCM Associates, Inc., and they have presented such plans and specifications to the Council for approval, NOW THEREFORE BE IT RESOLVED, by the city Council of Hopkins, Minnesota: 1. Such plans and specifications, a copy of which are attached hereto and made a part hereof, are hereby approved and ordered place on file in the office of the city Clerk. 2. The city Clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published twice, at least twenty-one days before date set for bid opening, shall specify the work to be done, shall state that bids will be received by the clerk until 10:00 a.m., on the 2nd day of December, 1992, at the city Hall and that no bids shall be considered unless sealed and filed with the clerk and accompanied by a certified check or bid bond, payable to the city of Hopkins, Minnesota for 5% of the amount of such bid. 3. The clerk and engineering superintendent are hereby authorized and instructed to receive, open, and read aloud bids received at the time and place herein noted, and to tabulate the bids received. The Council will consider the bids, and the award of a contract, at the regular city Council meetings of December 8, 1992 and March 16, 1993. Adopted this 10th day of November, 1992. Nelson W. Berg, Mayor ATTEST: James A. Genellie, City Clerk