December 8, 1992
v ....
m
'l <::>
o P K \ '"
council Report 92-255
LANDFILL PROJECT
CHANGE ORDER NO. 12
Proposed Action.
staff recommends adoption of the following motion: Move that
Council authorize Change Order No. 12 as it concerns the Seventh
Street South Landfill Gas Remediation Proiect.
overview
Staff approached Council in January of this year with what was
thought to be a final compensating change order concerning the
landfill project. An amount in excess of $30,000 was retained
until final inspection in the spring of 1992 as part of a
warranty on seeding operations. Upon inspection this spring it
was noted that special procedures would be required for turf
establishment on the slope overlooking Greenfield Apartments.
Those special procedures are encompassed in Change Order No. 12.
Primary Issues to Consider
o What are the costs?
The change order totals $7,437.50. This is payment for
additional regrading, seed, mulch, heavy duty silt fence,
and the use of wood fiber blanket.
o Staff recommendation:
The purpose of the change order work was to establish turf
in problem areas where vegetation would not take hold and
erosion of the Greenfield Apartment slope became critical.
Staff concurs with the consultant engineer that the net
increase in the contract price is justified and the change
order should be approved.
Supportinq Information
o Change Order No. 12
.,
'NtoiJ X.L/LC-~
J mes Gessele
Engineering Superintendent
CHANGE ORDER NO. 12
. PROJECT:
7th Street South Landfill Gas Remediation
Hopkins, Minnesota
Date: November 24, 1992
OWNER:
City of Hopkins
Owner's Project No.:
90-18
TO: (Contractor): Ames Construction, Inc.
14420 County Road 5
Burnsville, MN 55337
Engineer's Project No.:
12079
Contract Date: April 1, 1991
You are hereby directed to make the following change in the Contract Documents.
Description of Change:
Refer to the attached Supplement (l page).
~
. CHANGE IN CONTRACT PRICE
Original Bid Price
Net change from previous Change Orders
Con tract Price prior to this Change Order
Increase (decrease) from this Changc Order
Contract Price including this Change Order
$1.332.821.20
I ] 3.4] 5.54
1.446.236.74
7.437.50
$1.453.674.24
CHANGE IN CONTRACT TIME
Original Final Completion Date for Section 1
Original Final Completion Date for Section 2
Final Completion Date for Section 1 by previous Change Ordcrs
Final Completion Date for Section 2 by previous Change Orders
Final Completion Date for Section 1 from this Change Order
Final Complction Date for Section 2 from this Change Order
Julv 8. 1991
August 1. ]991
Julv 8. ]991
August 1. ] 991
Octobcr 5. ] 992
October 5. 1992
Engineer's Recommendation,
RIEKE CARROLL MULLER ASSOC., INC.
by ~j,.X/~ date ///Z-o/'Z--
/'
Con tractor's Acceptance,
AMES CONSTRUCTION, INC.
by ~ Q~ date if/3o/'!,--
....
.owner's Order,
CITY OF HOPKINS
by
date
Page I of I
e
SUPPLEMENT
to
CHANGE ORDER NO. 12
for
7TH STREET SOUTH LANDFILL GAS REMEDIATION
CITY OF HOPKINS PROJECT NO. 90-18
RCM PROJECT NO. 12079
Date of Change Order: November 24, 1992
Descriotion of Change
1. Regrade, seed (Mixture 500), mulch, and disc anchor area east of barrier system near northeast
corner of Building No.1 (Area 1).
2. Scarify, seed (Mixture 700), mulch, and disc anchor access road from top of slope to south of
Building No.5 (Area 2).
3. Regrade, seed (Mixture 700), and install wood fiber blanket (Mn/DOT 3885-high velocity type).
Installation shall be in accordance with Mn/DOT 3885 (Area 3).
4, Remove sediment and resod the areas adjacent to Greenfield Apartments (Area 4).
Justification
The purpose of this additional work was to vegetate problem areas. This Change Order modifies the
Contract Amount and Completion Dates of Change Order No. 11.
Pricing Data
Payment for this additional work shall be as follows:
Unit
_tern Unit Quantitv Price Amount
Area 1:
Regrade LS I $200.00 $200.00
Seed (Mixture 500) SY 200 0.50 100.00
Mulch and Disc Anchor SY 200 0.20 40.00
Subtotal $340,00
Area 2:
Scarify LS I $600.00 $600.00
Seed (Mixture 700) SY 1,000 0.50 500.00
Mulch and Disc Anchor SY 1,000 0.20 200.00
Su btotal $1,300.00
Area 3:
Regrade LS I $200,00 $200.00
Seed (Mixture 700) SY 500 0.50 175.00
Wood Fiber Blanket SY 500 2.50 875.00
Su btotal $1,250,00
A rea 4:
Regrade LS I $200.00 $200.00
Sod SY 850 1.35 1,147.50
Silt Fence LF 800 1.50 1,200,00
Heavy Duty Silt Fence LF 800 2.50 2,000.00
tit Subtotal $4.547.50
Total Increase Amount for This Change Order $7,437.50