Memo- Public Works Responses To Storm DrainageMemorandum
To: Honorable Mayor and Members of the City Council
Copy: Steve Mielke, City Manager
From: Steven J. Stadler, Public Works Director
Date: October 7, 1997
Public Works Actions:
Public Works Department
Subject: Hopkins Public Works Responses to 1997 Storm Drainage and
Sanitary Sewer Problems
Provided for your information is a listing of 28 specific actions performed by Public
Works in response to 1997 storm drainage and sanitary sewer problems.
Provide standby power to two sanitary sewer lift stations - no sewage backups due
to power outages
Fill sandbags at Public Works Building for resident pickup & use
• Deliver sandbags to 6 Avenue/3 Street area for resident use
Follow -up sandbag delivery with door -to -door offer to assist area residents who
may not be able to help themselves
Complete city -wide survey of low surface drain locations which may be improper
connections to sanitary sewer
Identify Chapel View surface drain as being an improper sanitary sewer connection
• Take immediate action (on private property) to divert surface water from the Chapel
View drain
• Written order to Chapel View to remove improper sanitary sewer connection as per
City Code
Investigate ways /areas to delay peak storm sewer flow during major storms. This
led to PW crews modifying outlet structure at detention pond adjacent to
Eisenhower Community Center in order to hold back an additional 1.5 feet of water
(1 M+ gallons) before maximum outlet flow rate occurs.
Borrow City of Minnetonka 6" pump to lower Shady Oak Pond water elevation
Rent an 8" pump and pump water from Shady Oak Pond a second time (pumped for
seven days)
Twice deliver pump to Hillside Park and/or pump water from ponding area
Hire consultant engineer to investigate options to improve local flooding problem at
6 Avenue /3 Street area
Report findings of abbreviated feasibility report to City Council and revise 1998-
2002 CIP to reflect a new improvement project, est project cost $250,000
• Perform preliminary engineering on storm sewer improvement project at Hillside
Park problem area
Investigate concern of Drillane resident regarding Oak Ridge Country Club well
drilling
• Mechanically clean all problem sanitary sewer collection pipes
Televise all problem sanitary sewer collection pipes
Solicit & receive three engineering consultant proposals regarding identification
and correction of sanitary sewer rainfall- induced flow problem (2 problem areas)
Staff will discuss recommendation to proceed at October 28 Council Worksession
• Working with engineering consultant on detailed analysis of storm drainage
problems affecting 6 Avenue /3 Street North and other areas. Public meeting
tentatively planned for October 23 and City Council action on proposed
improvement/s on November 5
Toured City, including inside several homes, with FEMA representatives conducting
preliminary investigating of damage to support Federal emergency declaration
Toured City with FEMA representative and completed detailed application for
reimbursement of City flood/storm response expenses. Reimbursement amount=
$40,000.
• Picked up flood damaged bulk pickup items fron 6 Avenue /3 Street North area
Held City -wide free flood damaged bulk drop -off program or reduced fee curbside
pickup program
Mailed numerous follow -up letters to residents calling PW with flood related
problems
Mailed a special residential newsletter to residents in the 6 Avenue/3 Street North
area regarding status of sanitary sewer and storm drainage problems along with'
flood cleanup MN Dept of Health factsheet
Installed raised asphalt edge and earthen berm to divert surface water flow in alley
b/w 5 Avenue North and 6 Avenue North, 200 block
Published a Hopkins Highlights article for Sept/Oct issue
CITY OF HOPKINS
ACTION PLAN
STORM DRAINAGE AND SANITARY SEWER PROBLEM AREAS
The following actions will be completed in the timeframes outlined below as
they relate to eight (8) identified storm drainage or sanitary sewer problem
areas. The problem areas are located on the attached city map.
PROBLEM
AREA ACTION /S
1
4
Dredge pond & improve pond edges 1999
Construct pond outlet as part of drainage
improvements associated with Shady Oak Rd
reconstruction 2001
Complete drainage improvement project design Jan 1998
Complete drainage improvement project Oct 1998
Replace inlet grate to improve flow and help
prevent blockage Oct 1998
Investigate and design new stormwater
structures to increase flow capacity from
13 Avenue inlets to Maetzold Field
Complete construction of improvements
Complete capacity analysis of existing sanitary
sewer collection pipes serving this area
Complete repairs to collection pipes (if there are
capacity problems due to defective pipes)
COMPLETION
DATE
Jan 1998
Oct 1998
Dec 1997
Dec 1998
PROBLEM
AREA ACTION /S
4 (cont.) Complete sump pump inspections of homes &
businesses in this sanitary sewer service area
and analysis of results
(assumes November 5, 1997 Council approval) Mar 1998
5
Disconnection of improper sump pump
connections in this service area
(assumes 6 -month compliance orders)
Engineering consultant analysis & confirmation
that 6 Avenue storm sewer project will improve
drainage in this alley Feb 1998
Project design completion
Storm drainage improvement project
construction completion
Complete capacity analysis of existing sanitary
sewer collection pipes serving this area
Complete repairs to collection pipes (if there are
capacity problems due to defective pipes)
Complete sump pump inspections of homes &
businesses in this sanitary sewer service area
and analysis of results
(assumes November 5, 1997 Council approval)
Disconnection of improper sump pump
connections in this service area
(assumes 6 -month compliance orders)
Complete analysis of area drainage capacity
Complete construction of necessary
improvements
COMPLETION
DATE
Nov 1998
Feb 1998
Nov 1998
Dec 1997
Dec 1998
Mar 1998
Nov 1998
Feb 1998
Nov 1999
•
=i1 N�p
C � r
wEFSTEF P =�. •. �
1L 3
€
1
1
2
Z
a U LY '7 o,C s r,) s, Pei) y\ 4 -ea-As
/ y
TRZ
•
1 1
1
WhINET'jNKS
IL
1 �
y am' Rp +jJ1-
S,^,yT11 �1
4A
TN
f i- , - j 1 ' 5'r. S -. N. 1 II
T3�
12- L i L2.,
f , L.11_,', e,
+i ' !� li � 1 1 •�0���4 ill
J. 4 II 1,...1..1._.....i i
i ,,, , , I ::, t .,, zit t I
il i Z ,; .,, ii 1
Il.r'' wr " ST I j€ p. ° : 41 ; Zna
iii Th \j !_
i! { I
1� it $ T _li lj
:,*4 q. ,i
1 gl- V . i � fit C £ I i ll ;1-
1, -7; viir 1 K'.: ytl 1 11 -1 1
1 A ..: i 1 1 I€ i . ...„ >.• > -i il �
I i �J sr S11 > Mi < t
ht
1
t•ite
R.
i •„
vA •1 W
• t 11 W y,•• 11
9 1 11 I
'17
+
,n tT
pK TR ( I( e l 6
F R' 1,
5•n
SETT,S PS S
TR `� C �•i\
v .
1 11 t i t
.J:..!1.... ST
EDINA
THE CITY 0
HOPKINS , MINN
HENNEPIN COUf<
SCALE
800' 0 600
Sas
i •
5 l i qf
v T tttr.E )CE
`' r
O1
a° °a
6000 k .t.+
l SY
J j
6 �
B