Loading...
AgendaTuesday, October 13, 1998 6 p.m. Raspberry Room 8 pm 1999 Budget review, Yager 9 pm Review roadway improvement policy, Stadler 9:30 pm Other NLC donation to non - profit community organization 6 pm CaII to order 6:05 pm Depot renovation report, Parsons 6:30 pm Chemical Health Commission, Kurtz 7:30 pm Revision of liquor ordinance, Genellie 10 pm Adjourn October 5, 1998 Proposed Action Staff recommends approval of the following motion: Motion to accept final report on the renovation of the Depot Coffee House. Overview m Parsons, Assistant to the City Manager Depot Coffee House Renovation Final Repot The Depot Coffee House has completed the renovation of the Hopkins depot building, and began operations on Sept. 2, the first day of school. The bulk of the renovation cost (65 %) was met through private donations of labor and materials. Government support for renovation accounted for 6% of the renovation cost (see attachment). Other costs were met through cash donations and fund raising. The total value of the renovation is $316,750, or approximately $166 per square foot. Renovation included the complete demolition and replacement of the roof, windows, doors, and interior. The basement was filled in, a new floor was poured, and all new mechanical systems were installed. The kitchen, bathrooms and entry area were tiled, and quality woodwork and doors were installed. (See attachment for renovation details.) Through the work of many parties, coordinated by Fran Hesch, the renovation was successfully completed and an attractive facility was made available to students and the public. (The Depot's grand opening is set for Friday and Saturday, October 30 and 31.) Primary Issues to Consider • What costs remain, e.g., site costs? Will the City be asked to pay for them? Are there any outstanding issues related to the Depot building and site? Supporting Documents Government support of the Depot Coffee House, 1994 -1998 Depot Coffee House renovation finances through 10/8/98 Primary Issues to Consider What costs remain, e.g., site costs? Will the City be asked to pay for them? With the building complete, remaining costs are primarily site costs. The parking lot, installed by the City of Hopkins, is intended to meet the minimum requirements. However, the Depot may wish to expand the parking lot next year, e.g., with paved parking on the south side of the building. Such items as a screening fence for the trash receptacles, a volleyball court, and a brick patio are all planned. The City has made no commitment to the Depot for payment for site costs. Ar there any outstanding issues related to the Depot building and site? It is anticipated that the Hennepin County Parks Department will build a paved trail running east to west along the southern boundary of the Depot site. Hennepin Parks is working with the land owner, i.e., the Hennepin County Regional Railroad Authority, as well as the City of Hopkins and the Depot Coffee House on that project. Traffic access to the Depot should be monitored so that any modifications in the public right -of -way can be made in conjunction with the County Road 3 reconstruction project. 2 GOVERNMENT SUPPORT OF THE DEPOT COFFEE HOUSE, 1994 -1998 Renovation of Depot Building Cash Hopkins Family Service Collaborative, 1998 Hennepin County: truss replacement Sheetl Sub -total $ 10,193 Labor and Materials City of Minnetonka $ 1,000 (estimate) City of Hopkins: paving /grading, permits, water line, etc. 7,000 Hennepin Co. Rail Authority: pole removal, etc. 500 Hopkins School District: carpentry 400 Sub -total $ 8,900 Total Government Support for Renovation $ 19,093 Total Renovation Expenses Phase I renovation expenses Phase II renovation expenses Total renovation expenses Total Government Support for Renovation as a Percentage of Renovation Expenses: 6.0% Operation of Depot Project (not renovation expense) Cash City of Hopkins, 1995 $ 5,000 City of Hopkins, 1996 5,000 Hopkins School District, 1995 5,000 Hopkins School District, 1997 2,000 City of Minnetonka, 1997 2,000 Hopkins Family Service Collaborative, 1998 25,000 (Federal funds) MN Dept. of Children, Families & Learning, 1998 48,319 (Plus $48,319 in 1999) Sub -total $ 92,319 Labor, Materials, Other In -Kind City of Hopkins: staff time, insurance, copies, postage $ 10,000 (estimate) Hopkins School District 8,000 Hopkins - Minnetonka Recreation: staff time, postage, etc. 10,700 Hennepin Co. Railroad Authority: rent -free use of building 34,200 (estimate for 1997 -98) Sub -total $ 62,900 Total Government Support for Operations $155,219 Total Operations Expense, 1994 -1998 $271,268 (Includes projected 1998 expenses) Total Government Support for Operations as a Percentage of Operations Expense: 57.2% Page 1 $ 5,000 (Federal funds) 5,193 $ 92,698 224,052 (Est. by Building Construction Mgmt. Inc.) $ 316,750 ASH ON HAND 1018198 Expen THE DEPOT COFFEE HOUSE Renovation Finances through 10/8198 6,028.88 Minn ga co Abatem nt P rmits Brick Drilling rywall Supply Justu Lumber Symington Plumbing W.W. Graing r Lathrop Paint Total Rental Pipelin Supply Matson MacDonald Filla Reimbur ment Rubbl Til Twin City Hardware And rson Millwork And rson Millwork David L in Til R use Mechanical Pr mier Restaurant Equip Swanson Gia Block if Pikar Contractors Swanson David L in Til Top -All Roofing Tom Filla Reimburse Tom Filla Reimburse Tom Filla Reimburse Tom Filla Reimburse Tom Filla R imburse Tom Filla Reimburse Tom Filla Reimburse Tom Filla Reimburse FILLA BUILDER & REMODELE Advanced Contract & Design Fran H eh Rouse Mechanical Steve Fitch Contractors CASH SPENT Expen C mmitted • Surplu (D ficit) D scription Construction Heat Pre -Phase 2 expense paid late $2779 in permits waived or credited Openings for electrical and heaters Metal framing, sheetrock, taping supplies Wood products, insulation He donated all his labor and 1/2 materials for underground Wall unit heater /coolers and bathroom ceiling fans They may donate a portion They have donated everything up until now Finishing plumbing work in walls, h2o heater, grab bars Deck engineering Supplies Quarry Tile and bathroom wall tile (no entryway) Door hardware Deposit for materials (Donating $2500 equivalent) Code issues Tile installation services HVAC labor & materials $5K donated) Stainless Steel Counter Top Glass Block Window Finish Carpentry Faucets Tile and labor in office and pop closet (code issues) Roofing Bill - Asbestos Removal from Phase One Twin City Hardware - door hardware (code issues) Bennett Lumber Company - bay window and stage flooring Cemstone Concrete Supplies - deck footings Materials Recovery - dumpsters Koss Paint Supply Knox Lumber - peps! closet (code issues) Labor - Duane, Kevin, Tom Labor Ready - cleaning for event R Undercounter fridge, table bases, delivery charges Reimbursement for supplies for Pepsi Closet Water heater labor Finish Carpentry, window, stage, closet, mirrors, ceiling, door framing & finishing, etc. More Justus Expense (estimate) Kitchen equipment (estimate) Insulation over drywall ceiling Outside signage lighting (Collisys) Door Conting ncy Am unt $671.29 $1,127.00 $154.00 $875.00 $3,196.54 $18,726.92 $491.30 $589.28 $301.24 $1,234.91 $1,934.02 $172.00 $226.40 $4,090.84 $1,531.50 $2,570.00 $140.00 $2,575.50 $3,353.54 $1,490.00 $250.00 $1,909.00 $241.00 $750.00 $1,680.00 $6,322.14 $986.40 $92.15 $864.00 $8,556.00 $67,101.97 $500.00 $1,013.60 $600.00 $1,900.00 $500.00 $0.00 $4,513.60 $713.52 $289.50 $298.87 $835.00 $762.50 $247.75 $3,000.00 $175.00 6,028.88 44,513.60 $1,515.28 PHASE 2 PROJECTED EXPENSES $224,052.00 CASH SPENT /ENCUMBERED I $71,615.57 ASE 2 SAVINGS DUE TO DONATIONS INCLUDING: $152,436.43 All: project management, site supervision architectural drawings, mechanical & electrical engineering, electrical and plumbing labor, electrical materials (except outdoor), plan reproduction, temporary heat equipment, _ concrete labor and materials, brickwork PLAM countertops, paint and stain labor all but a negligible amount of permit fees. Standard Heating ($5K donated), Minimum Parking lot Partial: plumbing materials, wood products, carpentry, insulation doors and hardware, drywall and metal studs, mechanical labor and materials, ceramic tile, kitchen equipment, casework, temp site work equipment rental, stainless steel countertop, paint and stain materials, landscaping. , No donations secured millwork, ceilings, wainscoting. PHASE 1 PROJECTED EXPENSES $92,698.00 CASH SPENT /ENCUMBERED $33,714.00 PHASE 1 SAVINGS DUE TO DONATIONS INCLUDING:. $58,984.00 All: Metal roofing material, gutters, downspouts and labor, Window materials and labor Truss material Partial: Carpentry, dumpster, survey, temp electric None: Asbestos /lead paint removal, well capping, brickwork, underground utilities, roof insulation materials. TOTAL PRE -PHASE 3 PROJECTED EXPENSE TOTAL CASH SPENT ilip TAL PRE -PHASE 3 SAVINGS DUE TO DONATIONS $316,750.00 $105,329.57 $211,420.43 BCM Estimate)