CR 98-100 Approve Plans & Order Bids Misc Storm Sewer Projects Areas 3 & 4June 15, 1998 Proposed Action. Staff recommends adoption of the following motion: Move that Council approve plans and authorize bids for the construction of storm sewer projects Areas 3 and 4 as part of Project 97 -15. Overview. Council in previous action authorized drawing up of plans to address storm sewer related issues that came about subsequent to flooding in the summer of 1997. Two areas now under consideration are Areas 3 and 4: the end of 13th Ave. North just north of Maetzold Field (Area 4) and the alley between 17th /18th Avenue at its intersection with 1st Street North (Area 3). RCM Associates has completed drawing up plans for this project and presents these to Council for approval and order of bids. Primary Issues to Consider. Improvements O Estimated costs • Recommendations Supporting Information. • Plans It s Gessele Engineering Superintendent APPROVE PLANS AND ORDER BIDS MISCELLANEOUS STORM SEWER PROJECTS AREAS 3 AND 4 Council Report No. 98 -100 Council Report 98 -100 June 15, 1998 Page 2 Analysis. o Improvements Work to be done in Area 3 is to increase the inlet capacity of a catch basin in the alley area to equal that of the existing pipe capacity. Work also includes reconstructing the concrete apron to the alley to contain overland flow and to bulkhead the existing storm sewer connection from the west. Improvements in Area 4 include removing existing catch basin structures and a portion of the street, replace with new increased capacity catch basins and new 8 -inch high concrete curb. o Estimated Costs The feasibility report of March 1998 estimated construction and engineering at roughly $5,000 for Area 3. Area 4 in the same report was estimated to cost $31,500. o Recommendation Originally staff approached the contractor of the 6th Avenue storm sewer project to request a quote on this project as change order work. The City attorney received that request but urged staff not to pursue this tactic. His opinion is that doing this construction for Areas 3 and 4 as change order work to the 6th Avenue project does not meet statutes governing the public bidding process. Therefore staff recommends approval of the submitted plans and authorization to begin the bidding process. >7- L TH4TH4 ST. N. • 2ND 1ST ST. `N. MAINST I - AREA NO.3 L-IL CD 1 K EXCELSIOR BLVD. 0) 3RD T?� 1ST ST. S .� ST N. ST. N. PROD CT LOCATION MAP _1ST 1 U U V) w t= U)! 1;1 1 is i II ii I {{ 0 1- r U) v 1- r (n c:Th3 'ON 'JAV H12 L J aNf 62 Ji6 Q O iI w ;CD _ - 11I H O ~ZO Ali_ .•i.i_._:_ 1 _._._.. _ __.. �. 0 n .._ ,___ : , M c, 0 II' / � 3< 4 i ,I rn Ova ,... a. N Y Q 0 0 r-U c, D7 UEE O Z O J. - cnF— 0. �3 •4 X33 - — 11111 1'11, I- W C 1- = m / U ill 1- i i < Z et• i ./ /0 7 ,, to; / // ,;/><(1)/ocizi,-. F-- �'� m p NHS ..'3 i X3 AI M / 1 ! j / `U 1.J.1 1-/ m 1 , � �' j on U i s ,: � , / o I FI Q/ c <U W Z w� , , ` / / 0 t .,,,,L in m z� w� zQ ! i Z/ / a. H00 CO 00 0 0O N • Tr) m m _.,,, AkbI ITI 74: '.g1,. co 0 ,� 6 /SI I /' ..- - �. 7p / // / / // 1C.,/ • F U 0 DL r7 / CD k w a y / Qy/ / ' �n A V\ / ' / /, /,� / / / % / ' / / Qj // i % / / i / /,'."0 ' / . ?`- . // / 0 / / \\ i / SS'/) « `r1. „{7Z k 0 N Cl/ A IMelS f NVI S W4 ) 3/1V 3 h a a ° a C.) W i I I i 7 (n = \ /•/ j a i w / . ( Z o I ., J 0 / i 0 - �� - i y N �� (/) U Q _ Q N H O W L W y' uJ 1 = • U _"' O Z Z CZ) V) �30 O =W a a w ct _¢ F NO m � Q ¢', Q / 1 o�Q =ui a` �r-� QaU zw ~/ j Z W i_Ucx 0 � J0 O CI i - V) J-, UZ ,( � °D�` °c '�i 1 wn0 �_ / , IN r. _ - O � -¢ 0 ZNa w ` om W p L�J -- ct a 0 JW Lui J 0 0 I N rn WO c~¢w / as 0 Ln m �cn a_ ?�Q An_ opo e o / ® a /Tv / c) 9 r 3:.)N33 )INII NNW) 'ISIX3 � / J I � ej/ 0 L' < /./ CC U ::-,/ m ti O 0 b 03.V 4