Loading...
CR 98-113 Concept Review- StieleJuly 1, 1998 Proposed Action. This is a concept review that requires no action. Any comments regarding the development would be helpful to the applicant for further applications. Overview. The applicant, The Beard Group, Inc., is proposing to construct a two -story bank and a one - story office- warehouse on the vacant lot west of 10889 Excelsior Boulevard, Hopkins Auto Body. The site is 5.6 acres. The development as proposed consists of the following three buildings: • • The office- warehouse buildings are proposed to be used for incubator business and will be located on the rear of the site. The typical bay for the warehouse will be 28'x 48'. Primary Issues to Consider. • What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? • What are the specifics of the development? • What is the timing for the proposed development? What was the discussion at the Zoning and Planning meeting? • What are the issues relating to public financial assistance? Supporting Documents. • Analysis of issues • Preliminary site plan Nanc3fiS. Anderson, AICP Planner CONCEPT REVIEW - STIELE A 10,000 square -foot bank with a drive through A 40,320 square -foot office- warehouse building A 18,816 square -foot office- warehouse building Council Report CR98 -113 CR98 -113 Page 2 Primary Issues to Consider. • What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? The subject site is zoned I -1 Industrial. The Comprehensive Plan has designated the site as Industrial. The proposed uses comply with both documents. What are the specifics of the development? Landscaping The landscaping has not been detailed. There will be an opportunity to landscape the front yard along Excelsior Boulevard. Exterior The exterior of the buildings has not been identified. It _ is expected the bank will have a different exterior than the office- warehouse buildings. Drainage There will be one ponding area at the southeast corner of the site. Nine Mile Watershed District will have to approve the proposed development. Parking The preliminary site plan details 280 parking spaces. The site, based on 11 percent of the office- warehouse buildings having office space, would be required to have 40 spaces, and the site plan indicates 57 spaces. The warehouse requirement for parking spaces is 56. The site plan indicated 223. If the site has more office space when leased, the parking area will allow considerably more space to be designated for office use. Loading Docks The preliminary plan shows four loading docks on the south side of the two office- warehouse buildings. Access Access to the site will be from the existing access on Excelsior Boulevard. What is the timing for the proposed development? The applicant would like to start the site work this coming winter and start construction next CR98 -113 Page3 spring. What was the discussion at the Zoning and Planning meeting? Ms. Anderson reviewed the proposed development with the Commission. Bill Beard and Paul Gamst appeared before the Commission. Mr. Beard stated that the warehouse area is geared toward smaller businesses. The Commission discussed the landscaping, traffic, height, and soil of the site. Because of the poor soil on the site, the building will have to be constructed on pilings. What are the issues relating to public financial assistance? If the City Council wishes to proceed forward with this project, a preliminary tax increment application will be presented to the Board at a future meeting. (proposed for July 21) This application will detail in more detail the specific s of the public assistance. Tax increment application is based on poor soil conditions as this site was once used as a burn/dump site by Hennepin County, and as a result, the building will need to be built on pilings, which will substantially increase the construction costs. DATA PHASE 1 Office Building 1 PHASE 2 Off,/Worehouse Buildings 2 £ 3 ISSUE /REVISIONS (0/0198 Cc¢ cr?Y RE-view Stiele & Bakken Investment Co. Ed Stiele Hopkins Auto Body 10889 Excelsior Blvd. Hopkins, MN 55343 " 935 -7556 smith HEREBY CERTIFY THAT THIS PLAN. SPECIFICATION. OR REPORT WAS PRE RAPED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A OILY REC STERED UNDER THE LAWS OF Tut STATE Of DATE REG NO DRAWN CHECKED