CR 98-179 Consider Engineering Service Fees Change Order-Excelsior Blvd LandscapingOctober 29, 1998 Overview. Primary Issues to Consider. • Staff recommendation Supporting Information. October 12, 1998 HKG, Inc. letter Steven J. Stadler, Public Works Director Council Report 98 -179 Consider Engineering Services Fees Change Order -- Excelsior Boulevard Landscaping Proposed Action. Staff recommends adoption of the following motion: Move that Council approve additional Excelsior Boulevard Landscaping engineering fees to Hoisinaton- Koegler Group, Inc. in the amount of $2,700. In 1995, the City of Hopkins entered into a professional services agreement with Hoisington- Koegler Group, Inc. (HKG, Inc.) for Excelsior Boulevard, Segment 1 preliminary and final landscape design. The total fee was estimated at $21,540. The original agreement did not include completing street lighting improvement design or preparing a stand -alone landscape bid package. These changes to the design scope required additional work on the part HKG, Inc. To help offset the increased cost, staff has agreed to complete contract administration work on this upcoming project. The final contract increase is $2,700. Staff has negotiated this fee increase with the consultant and believes the additional fee is fair and reasonable compensation for the additional work. Creative Solutions for Land Planning and Design October 12, 1998 Mr. Steve Stadler, Public Works Director City of Hopkins 1601 Second Street South Hopkins, MN 55343 Dear Steve: Hoisington Koegler Group Inc. Re: Additional Services request and fee reduction measure for Excelsior Boulevard Streetscape Improvements. Based on our meeting last week I have outlined a request for additional services and a design fee reduction measure in regard to design of the Excelsior Boulevard streetscape improvements. The original contract amount for design services relating to the first phase of Excelsior Boulevard streetscape improvements was $21,540. The original contract did not include a couple of work items that HKGi provided or is anticipated to provide at the City of Hopkins' request. Those items and their fees include: 1. Coordinating street light improvements: $3,200 (this is an actual cost, the work is completed). 2. The other change to the work which has not yet impacted costs but will during final plan preparation is the need for a stand -alone landscaping bid package administered by the City rather than the original intent to incorporate landscaping into the County's roadway plans. This will require a full project manual and project plan set for this portion of the work, adding some preparation time and expenses to the project: $1,000 The original contract included administration of the construction process by HKGi (payment applications, change orders, etc). This work can be done by City staff for a fee reduction of $1,500. HKGi will still be responsible for construction observation. The combination of these additions and deductions total $2,700. This is the amount HKGi is requesting in additional services as a not -to- exceed figure bringing the total design fees to $24,240. Thank you for consideration of this request. If you have any questions, feel free to give me a call. Sincerely, Bruce L. Chamberlain, RLA Project Landscape Architect, Principal \\HKG\VOL2\ HOPKINS \95- 64\DOCUMENT\ADDSERV2.DOC 123 North Third Street, Suite 100, Minneapolis, MN 55401 -1659 Ph (612) 338 -0800 Fx (612) 338 -6838