Loading...
CR 98-135 Approve Change Order- Excelsior Blvd Reconstruction Project 11th Ave S Streetlighting0 August 13, 1998 Supporting Information. • Collisys Proposal • Killmer Proposal 1 Y 0 O C� P K X Council Report 98-135 Approve Change Order — Excelsior Blvd Reconstruction Project 11 Avenue South Streetlighting Proposed Action. Staff recommends adoption of the following motion: Move that Council authorize the Public Works Director to sign an agreement with Collins Electrical Systems, Inc. ( Collisys) for installation of new street Tight wirina, concrete bases and poles along 11 Avenue South from Excelsior Blvd to 1 Street South. Overview. The Excelsior Blvd reconstruction contract did not include necessary street lighting work along 11 Avenue South. Approval of this $24,200 change order will authorize the contractor to install new concrete lighting bases, wiring, feed point and re- install the existing light poles and fixtures. Primary Issues to Consider. • Change Order Funding This change order will be funded from the $2.3 million TIF bond proceeds earmarked for Excelsior Blvd reconstruction. The change order increases th city's share of construction cost from $917,532.38 to $941,732.38, a 2.6% increase. • Construction Cost Review For comparison purposes, staff obtained a proposal from Killmer Electric Co. The Killmer bid was $28,618.00 At $24,200, Staff believes the Collisys bid is fair and reasonable. Steven J. Stadler, Public orks Director O p5. Collins Electrical Systems, Inc. ❑ 1651 INDUSTRIAL PARK RD. • BAXTER, MINN. 56401 PHONE: 218- 829 -4648 • FAX: 218- 829 -6882 ❑ 4990 NORTH HIGHWAY PHONE: (612) 535-6000 • MN • FAX (612) 535-6961 CITY, STATE AND ZIP CODE Hopkins, MN 55343 ATTENTION \ Vern Pankratz We hereby propose to furnish materials and labor necessary for the completion of: working order presently. _-.. .1 •••• • •mot• TWENTY FOUR THOUSAND TWO HUNDRED Payment to be made as follows Monthly upon percentage of completion. Date of Acceptance REVISED No. Page No of Pages 1. Furnish and install concrete pad and new pad mounted feed point. (City to pay any NSP hookup fees) if required. 3. Remove and re- install existing poles L10). ColliSys assumes all 10 are in 4. Existing concrete light bases to be removed for $250.00 each. Any sidewalk removal or restoration would be at $6.50 per square foot. I WE PROPOSE hereby to furnish material and labor — complete in accordance with above specifications, for the sum of All material is guaranteed to be as specified All work to be completed in a substantial workmanlike manner according to specifications submitted. per standard practices Any alteration or deviation from above specifications involving extra costs will be exri,uted only upon written orders, and will become an extra charge over and above the estimate All agreements contingent upon strikes. accidents or delays beyond our c control Our workers are fully covered by Workmen's Compensation Insurance CCEPTANCE OF PROPOSAL The above paces specifications and conditions are satisfactory and are hereby accepted You are authorized to do the work as specified Payment will be made as outlined above Authorized Signature 1reC Rober •rg, Note: This proposal may be 3 withdrawn by us if not accepted within days. Signature Signature An Equal Opportunity Employer 24,200.00 dollars ($ or m 1 PROPOSAL SUBMITTED TO City of Hopkins STREET 1010 - First Street South DATE OF PLANS 7/22/98 PHONE 939 -1386 JOB NAME 11th Ave. Lighting Project JOB LOCATION Hopkins DATE 8/7/98 JOB PHONE 2. New 1 -1/2" and 2" conduit and #6 wire to new concrete bases, furnished by ColliSys as per City of Hopkins drawing. ions 08/05/98 WED 15:55 FAX 6124241258 RILLMER ELECTRIC DAOe)C1 11 FROPC$A1 SUAMrrrz] TO STREET AnCMITEC r City of Hopkins - Public Works 11100 Excelsior Blvd. CITY STA' E sne ZIP C001_ Hopkins, MN 55343 Attn: Vern �vlle hereby submit specifications arkl est!rr+ares for oATr_ or PLSN5 Nun inc_, Grown, MA. 01471. To Ordo: PHONE TOLL TREE 1.800.225.6380 Proposal K1LLmER. ELECTRIC Co., IncJ 9702 85th Avenue North MAPLE GROVE, MINNESOTA 55369 (612) 425 -2525 PAONE ,OS NA ME JO0 LOCATION 939 -1386 Fax: 939 -1381 Kilimer Electric Co., Inc- proposes to furnish and install the following: 10 - Concrete Light Bases with Anchor Bolts 1000' - PVC ( + or - ) 150' - 11" RSC under roadway, 2 at 1st Street & 1 crossing on lath Ave. 4 - PVC IHI with Steel covers 1 - Circuit for Festoon Outlets 2 - Circuits for street lights 1 - Service Point with Photocell, Testswitch & Lighting Contactor - Connect existing street lights at 1st to new lighting circuits • - Concrete remove .& replace as necessary - Install 10 Poles & Luminaires furnished by city - All wiring #6 Proposr hereby to furnish material and labor — complete In accordance with above specifications, for the sum of L_ I enty- eight thousand six hundred eighteen dollars & no/100 Fsymer,t to Do rnacic• gs follows. All rr!Jlp,!ni 1= •3uaranteto to tlr. 35 SpeclfioC All work lO De cornplklc :a 11 wolkntanldcc rnar!.lur according tc ;taw: Ire prsctices Any 31,tr:it Orr Or Oevtatiorl Ir4,Tt Above spec!t!c Iliad:` Ir oi..ng extra co,.: will t . ekeculo:1 only t,pon wrinen orlr;ry :rrd wilt Decornc 7n t :x;r chortle over and tbt'vt. me estlmit;: All :agreements cCrilrtrent upon sinkc., Jeo:rJen1= rn <m ays Oeyoml iltlr co.•,trOl Owrwr lJ carry t!re Iorm d j nn0 Other nocr,`b. :Jry ;r uralNCe. L\ Our workers :No luny covsret by workman's Comp Insurance 'Artrptance of Proposal — The above prices. specibraltonS and Cur :altions are sa11sfeCttry and arc hereby accepted You 8rC 3Jthnr:'e:d Signature to (Jo the w.rk as soecrlec P:ymerli will be made J■ Outlined a`JUVi Date of Acceptance 11th Ave. St. Lichts North of 1st Street to Co. Rd. 3 _OP. p1 tONE • Authorised SlgnaturC ordy Johnson withdrawn by us if not accoI)ted within Note. This propo.a: may be Signature 1)ATF 8 -5 -98 dollars ( $ 28 , 618.00 1 1001 Page No. 1 of 1 Pages }