CR 98-149 Consider Feasibility Report, Storm Drainage Problem Area 5September 11, 1998
Overview.
0 P K
Consider Feasibility Report, Storm Drainage Problem Area 5
Proposed Action.
Staff recommends adoption of the following motion: Move that Council accept
the feasibility report on correction of flooding problems in Area 5 — alley between
8 and 9 Ayes North and 2" and 3 Streets North and approve proposed
continued action.
Last November City Council adopted by resolution an action plan to address last
summer's storm and sanitary sewer problems. The plan required the city to
confirm that the proposed 6th Avenue North storm sewer improvement project
would also improve drainage in Area 5. The city's consultant confirmed that the
6 Ave project would not improve drainage in Area 5. Staff reported this
information to Council on June 16th and Council authorized preparation of a
feasibility study to identify potential improvements. The feasibility report
recommendations were presented to Area 5 residents at a Sept 3 public
meeting. Staff and Mike Foertsch, RCM Associates, will present the report to
Council and answer questions.
Primary Issues to Consider.
• Report recommendations and proposed continued action.
Storm sewer project funding
Supporting Information.
Feasibility Report
Storm Sewer Fund — Cash Flow
Steven J. Stadler, Public Works Director
Council Report 98 -149
Council Report 98 -149
Page 2
Analysis of Issues
Report recommendations and proposed continued action.
Report recommendations: The report concludes that the most effective solution
to this local drainage problem area is to better facilitate overland flow through this
alley. It recommends that this be done by lowering the south end of the alley to
reduce the depth of water backup prior to overflow to the south onto 2 " Street
North. The attached report provides more detail on the analysis and alternatives.
Proposed continued action: Staff recommends that a decision to proceed with
this proposed improvement project wait until the storm water management plan
update is completed. The plan update will consider the entire central Hopkins
storm sewer system, identify shortcomings and recommend potential
improvements. We must be certain that the design of improvements to Area 5
consider and incorporate the needs of the entire central Hopkins system. Staff
would propose to complete a project design survey based on the feasibility report
recommendations. In January, 1999 staff will report the results of the storm
water management plan update and recommend a course of action for Area 5
improvements.
Storm sewer project funding
Storm sewer project funding is very tight until the year 2010 when the 1989
bonding debt service ($240,000/yr) is retired. In 1998 there was a $600,000
interfund loan from the sanitary sewer fund. Additional funding is needed in the
storm sewer fund to cover the cost of this potential Area 5 project and other
previously identified projects. Staff proposes that the 1998 loan of $600,000
become an equity transfer instead of a loan and an additional $200,000 be
transferred from the sanitary sewer fund in 1999. There is sufficient cash
balance in the sanitary sewer fund to absorb this $800,000 equity transfer.
However, this proposed additional storm sewer funding decision should also be
deferred until a better forecast of future needs are determined through the storm
water management plan update.
Area 5 - Alley Between 8 th & 9 th Avenue North
Feasibility Report
Storm Water Analysis
Hopkins, MN
RCM File No. 10441.05
10901 red circle drive • box 130 • minnetonka, mn 55343 • (612)935 -6901 • fax (612)935 -8814
September 1998
equal opportunity
employer
10901 red circle dr.
W ost office box 130
innetonka, mn
55343 -0130
(612) 935 -6901
fax (612) 935 -8814
www.rcm-assoc.com
September 11, 1998
Mr. Steven J. Stadler, P.E.,
Director of Public Works
City of Hopkins
1010 First Street South
Hopkins, MN 55343
Re: Area 5 - Storm Water Flooding Analysis
RCM File No. 10441.05
Dear Mr. Stadler:
ICIll Enclosed is the feasibility report addressing the storm water flooding impacts to the alley
between 8 and 9 Avenues North and between 2nd and 3r Street North within the City of
Hopkins. The Hopkins City Council identified this study area by Council Resolution 97 -104
rieke for storm water flooding analysis.
carroll
muller
ir sociates, inc. The improvements proposed herein are feasible from an engineering standpoint, in accordance
ggineers with the City's Comprehensive Storm Water Management Plan, cost effective, and necessary
land t su r y t o provide an increased level of flooding protection for the roe owners adjacent surveyors P g p property rtY acent to the J
study area.
We are available to meet with the City Council, staff and interested parties to review any
aspect of this report.
Thank you for providing RCM the opportunity to be of service to the City of Hopkins.
Respectfully submitted,
RIE . ARROLL MULLER ASSOCIATES, IN
Michael P. Foertsch, P.E./L.
Civil/Municipal Department Manager
MPF/ka
Enclosure
Date:
Date:
AREA 5: ALLEY BETWEEN 8TH & 9TH AVENUE NORTH
CITY OF HOPKINS, MINNESOTA
SEPTEMBER 1998
RCM FILE NO. 10441.05
Prepared by: Rieke Carroll Muller Associates, Inc.
10901 Red Circle Drive, Suite 200
Minnetonka, Minnesota 55343
Reviewed by:
Steven J. Stadler, P.E., Public Works Director
I hereby certify that this report was prepared by me or under my direct supervision and that I am a
duly Registered Professional Engineer under th
qg
FEASIBILITY REPORT
STORM WATER FLOODING ANALYSIS
f the State of Minnes
Michael P. Foertsch, P.E./L.S. Reg, No. 18139
TABLE OF CONTENTS
Section Page
Issues 1
Analysis 1
Recommendations 2
Estimated Construction Costs 5
Appendix
Figure 1 - Local Drainage Area 7
Figure 2 - Existing Tributary Areas 8
Figure 3 - Construction Area 9
Figure 4 - Garage Floor Elevations 10
AREA -5: ALLEY BETWEEN 8TH AND 9TH AVENUES NORTH
ISSUES:
The alley between 8 and 9 Avenues North and 2nd and 3r Streets North, reportedly flooded on two
occasions during July of 1997 and once during May 1998. Drainage from this area was improved
slightly in 1992 with the 1st Street North storm sewer project. The intent of the 1992 improvements
was to maximize the available pipe capacity within the existing storm sewer system. That project was
not expected to solve the problem, but simply allow a slight improvement. The 6th Avenue North
storm sewer improvements do not provide an increased level of protection for this area.
ANALYSIS:
This area (Figure 1) is drained by a 24 -inch storm sewer pipe which drains southerly to the existing
storm sewer system in 2nd Street North. The low point in the alley is drained by two existing catch
basin inlets. The capacity of the two inlet catch basin grates is approximately 6.5 cfs. The capacity
of the existing 24 -inch storm sewer pipe is estimated at 13 cfs. The "localized" drainage area to this
alley low point is approximately 3 acres. The estimated storm water flows from this 3 acre area are
about 2.1 cfs and 3.8 cfs during the 10 year and 100 year frequency storms, respectively. The
difficulty in draining this alley is that the middle of the alley is at a lower elevation than the south end,
some of the stormwater flowing along the alley is trapped. This causes the flooding condition.
Overland flow from approximately 25 acres (Figure 2) is tributary to this alley area low point. During
the rainfall events which exceed the existing pipe capacities within the drainage district, the flow to
this alley area in the 100 year storm event is estimated at approximately 35 cfs from this 25 acre area.
In addition, there is testimony from residents who live in this area that storm water flow southerly
along 8 Avenue North, splits and goes west on 3r Street North and a portion flows south along 8
Avenue North. The portion of the flow which flows westerly along 3r Street North collects in the
low point at 9 Avenue and 3rd Street North.
On May 15, 1998, residents in this area reported as much as 2- inches of rainfall within a 20 minute
period. During that rainfall event, the water ponded to a depth of approximately 1.7 feet. This
1.7 foot depth was verified by water lines on the existing structures adjacent to the low point in the
1
alley. The low point elevation of the overland flow point from this location is at the intersection of
2nd Street North and the alley. This intersection elevation is approximately 1.8 feet above the low
point in the alley. As a result, in rainfall events which exceed the inlet capacity of the existing storm
sewer system, storm water ponds to a depth of approximately 1.8 feet before overflowing southerly
onto r Street North. The overland flow on 2n Street North is easterly to 7 Avenue North and then
southerly along 7 Avenue North.
RECOMMENDATIONS:
The existing storm sewer pipe system which services this area is currently at capacity. There are no
feasible cost effective pipe construction alternatives which would alleviate the 100 year flood levels
in this area of study.
The following alternatives are identified for consideration:
1. Provide an overland overflow route at a lower elevation.
2. Increase the inlet capacity to maximize available pipe capacity in the 24 -inch storm sewer pipe
serving this local area.
3. Divert all overland storm water flow around the alley.
4. Flood proofing of the existing structures below the current overflow elevation.
To determine the scope of the improvements necessary to divert all the overland flow from this area,
a detail topographic survey of area between 2nd and 3 Street North and 8 & 9 Avenues North was
performed.
Alternative No. 1- To provide an overland overflow route at a lower elevation. The detailed survey
information obtained, provided information which allows the determination of the overland flow
elevation at the southerly end of the alley at approximately 0.2 to 0.3 feet below the existing garage
floor elevations within this area. The extent of the improvement necessary to provide this level of
protection includes the following (Figure 3):
• Reconstruction of the alley from the low point catch basins southerly to 2 Street North.
3
• Reconstruction of 2n Street and a lower elevation from its intersection with 9 Avenue North
to the intersection of 7 Avenue North.
With the reconstruction of 2 Street North from 9 Avenue to 7 Avenue North, flow which
currently drains easterly on 2n Avenue North and northerly at its intersection with 9 Avenue North
is diverted easterly to the 7t Avenue North intersection of 2n Street North. This alleviates some of
the flooding potential at the 3' Street North and 9 Avenue North intersection. The downside to this
street regrading is that it would result in a slightly flatter street grades than what currently exists
today. Today the street grades are approximately 0.4 %. With this proposed improvements, the street
grades would be approximately 0.2 %. A typical minimum desirable grades along a curb and gutter
street section is approximate 0.5 %. As a comparison, the existing street grades along 9 Avenue
North, north of r Street North, is approximately 0.2 %. Therefore, there are areas within the City
of Hopkins which have street grades which are less than typical 0.5% minimum.
Alternative No. 2 - Increase the inlet capacity at the alley low point. The existing inlet capacity of
the catch basins at the low point in the alley is currently less than the available pipe capacity within
the 24 -inch pipe which services this area. The addition of the 2 catch basins would increase the inlet
capacity to that of approximately the capacity of the existing 24 -inch storm sewer pipe.
Alternative No. 3 - Divert all overland storm water flow away from the alley area. This alternative
was reviewed and it was determined that due to the extremely flat street grades within this area, no
feasible cost effective overland diversion route could be established to divert all overland flow away
from this alley area.
Alternative No. 4 - Flood proofing the existing structures below the current overflow elevation. Due
to the fact that Alternatives 1 and 2 are a viable option to mitigate the flooding within this alley area,
flood proofing of the existing structures below the current overflow elevation was not considered.
Figure No. 4 shows that 7 structures (Elevation 923) are impacted given the current overflow
situation within the alley area. After the proposed improvements identified in Alternatives 1 and 2,
the ponding area is limited to the localized areas around the proposed catch basins as well as the
reconstructed alley area.
Informational Meeting with Residents.
An informational meeting with the residents adjacent to this alley area was held on Thursday,
September 3. The information in this report was presented to them along with a tentative time frame
to complete the improvements.
The residents were in agreement that Alternatives 1 and 2 provided a reasonable solution to the
problem. They stated they were not aware of the water levels in the alley area ever rising to a level
such that an overflow condition existed at 2nd Street North. The proposed improvements would
provide an over flow at approximately 0.5' above the existing alley low point, currently at the catch
basin locations.
The information provided the residents indicated that the City is currently updating their
Comprehensive Storm Water Management Plan. This plan update will be completed by the end of
this year. From a local drainage district perspective, the improvements identified offer a viable
solution to the storm water problems they have been experiencing. The updated Storm Water
Management Plan may or may not confirm these findings from an overall City storm water
management perspective. If changes result, the residents will be informed prior to any final City
Council action in this regard.
Proposed Schedule
Informational Meeting with Residents September 3, 1998
City Council Consideration September 15, 1998
Storm Water Management Plan Update Completed January 1, 1999
City Council Project Authorization March 1999
Project Construction May, June 1999
4
ESTIMATED CONSTRUCTION COSTS:
A. Increase inlet capacity in alley to utilize available pipe capacity.
Item Ouantity Unit Cost Amount
Reconstruct catch basins by structure 2 $500 $1,000
Construct catch basins by structure 2 $1,000 $2,000
Total $3,000
B. Reconstruct alley from existing catch basins south to 2 Street at a lower elevation to provide
overflow in alley at approximately 0.5' depth at catch basin.
Item Quantity Unit Cost Amount
Remove existing concrete pavement by square yard 623 $10 $6,230
Common excavation by cubic yard 210 $6 $1,260
Aggregate base 6" thick by ton 105 $15 $1,575
Concrete pavement by square yard 623 $25 $15,575
Bituminous and sod restoration by square yard 249 $10 $2.490
Total $27,130
C. Reconstruct 2nd Street from 9 Avenue to 7 Avenue at 0.2% grade, and install valley gutters,
2 at 8 Avenue and 1 at 7 Avenue.
Item Ouantity Unit Cost Amount
Remove bituminous pavement by square yard 3120 $5 $15,600
Remove concrete curb and gutter by linear feet 1560 $2 $3,120
Common excavation by cubic yard 1040 $6 $6,240
Aggregate base 6" thick by cubic yard 520 $15 $7,800
Bituminous base 3" thick by ton 515 $25 $12,875
Bituminous wear 1 -1/2" thick by ton 258 $28 $7,224
5
Item Quantity Unit Cost Amount
18" concrete valley gutter by square yard 270 $7 $1,890
Concrete curb and gutter by linear feet 1560 $10 $15,600
Sidewalk/pedestrian ramps by lump sum 1 $2,500 $2,500
Driveway restoration by lump sum 1 $4,500 $4,500
Sod by lump sum 1 $3,000 $3,000
Structure adjustments by lump sum 1 $5,000 $5,000
Total $85,349
Total Alternatives 1 and 2 $115,479
15% Contingency $17,300
Administrative and Engineering $34,500
Grand Total $167,279
APPENDIX
EXHIPIT1.DWG •- FWURE 4, - -25 -98 PLOT
923.9
9,_
15" X 9 15" 2nd
—0._ 4_ ----
rieke
carrot,
mutter
associates, inc.
engineers architects • land surveyors
3rd STREET
924.8
FIGURE
NORTH ( X 2
X 923.9
925.2
922.4
931.6
SHEET NO.
,
924.6
t
rn
9
-I GO
PN. 1()441.05
3 ACRE LOCAL DRAINAGE AREA
HOPKINS, MINNESOTA
REVISIONS
� DATE
UGUST 1998
24" STREET N
2 4" ORTH 15"
- - . . ±L _0_ - - -
— _ - -923.3
SCALE: 1" = 100'
7
FILE NO.
10441.05
FIG -5.DWG 6 -10 -98 PLOT 1 -1 PN.10441.05
rieke
carroll
muller
associates, inc.
engineers architects land surveyors
FIGURE 2
EXISTING TRIBUTARY
DRAINAGE AREAS
HOPKINS, MINNESOTA
REVISIONS
DATE
AUGUST 1998
SHEET NO.
C FILE NO.
10441.05
924.6
X
924.5 24'
X 925.3
gla
Jr
000/ r
01
r a:
92 5 / ifs. r :3
! / i � x23.9 ��
! \ \ \ \ \\ \ 1 011 924.8 X 9 25.2
lo"I q 1 I, I 1 i ■
pa r
'0°0 h & 1 11
YO
4 * 1 1 i
- - --
WO
_ _1 ._ _ _ _ - .! ,
"A",, 4* :,./ 7 ' A i Tr .( x a
9 22.4 r
6:. yam: !
CM rieke
corral!
muller
associates, inc.
engineers architects • land surveyors
3rd STREET X 924.8 NORTH
925.0
FIGURE 3
926.3
924.8
Xx �
X 923.9
931.6
! i s
�3
926.
w
z
6 -- I -98 PLOT ;- DO PN.10441.)5
<<3
CONSTRUCTION AREA
HOPKINS, MINNESOTA
SCALE: 1" = 100'
REVISIONS
DATE
A UGUST 1998
FILE NO.
10441.05
29.
C
EXHIBIT-- 4. DWG 9-2-98 PLOT -100 PN.1 04 4 1 .05
924.6
924.5
X 925.3
CI" c ri a e r k r e o i i
1 mulier
associates, inc.
engineers architects and surveyors
24" 3rd STREET \ 924,8 NORTH
O
925.0
,== INDICATES GARAGE FLOORS BELOW 923
923.8
FIGURE 4
92.4,8
X x
X 923.9
(z3
925.2
SHEET NO.
926.
15"„X 925,1
—
15 . 2nd
>k/
t 19.
GARAGE FLOORS BELOW ESTIMATED
923.0 STORM WATER ELEVATION
HOPKINS, MINNESOTA
0
SCALE: 1" = 100'
REVISIONS
DATE
SEPT.1998
FILE NO.
10441.05
29.8
24" STREET 923.3
---> 24"
- 9 -
NORTH 15.
Working Capital Beginning Year
Add From Operations
Debt Service: '89 Bonds
Interfund loan payback
$600,000
Capital Outlay
CIP
Working Capital Ending Year
Rate History
1989 $4.75
1991 $6.00
1992 $7.50
1993 $9.00
1998 $9.60
2000 $10.80 planned increase
STORM SEWER FUND - CASH FLOW
(000'S Omitted)
1999 2.0.Q 2001 2002 2QQ
(717) (832) (865) (725)
410 500 500 500 500
(467)
239
60
7
347
(717)
39
243 246 238 238
60 60 60 60
0 0 0 0
312 227 62 50
(832) (865) (725) (573)
Balance 12/31/2003