CR 99-102 Approve Plans Order Bids Hilltop Park Storm Sewer Improvements Project 98-17 G \ T Y OF ~ May 26, 1999 HOPKINS Council Report 99-102 . APPROVE PLANS AND ORDER BIDS HILLTOP PARK STORM SEWER IMPROVEMENTS PROJECT 98-17 Proposed Action Staff recommends approval of the following motion: Move that Council approve plans and authorize bids for the construction of Storm Sewer Project 98-17, Hilltop Park (Area 2) . Overview Council at its March 16 meeting approved a consultant services proposal with SEH-RCM and authorized plans and specifications to address storm sewer issues in the Hilltop Park area. The plans are completed and are now presented to Council for approval and ordering of bids. . Primary Issues to Consider . Improvements . Estimated costs . Schedule . Recommendation Supporting Inforrnation . Plans . Estimated costs (r~- James Gessele Engineering Superintendent . -- Council Report 99-102 Page 2 Analysis . . Improvements The construction of storm water facilities to serve the Hilltop Park area will be accomplished with two branch mains. The east branch includes constructing a 12" storm sewer pipe from the low area behind homes along 19th Avenue North, northwestward to just south of 4 th Street North, then westerly through a parking lot along the south side of 4th Street to a point where the storm sewer system discharges northward under 4th Street to a detention basin proposed to be built by the Elder Homestead Development. The west branch includes installation of a 12" storm pipe from the park's west low area, northward to the same discharge location under 4th Street mentioned above. A stub will be provided for future storm sewer connections from 21st Avenue North. The construction of the City's project is predicated on Elder Homestead's detention pond to be located at the far west of their expansion site. The City's pipe size and discharge rates have been coordinated with the pond design. The City's consultant has been working closely with the Elder Homestead engineer on this . issue. Elder Homestead contemplates construction to begin mid June. The City's project will begin mid July at the earliest. In conjunction with new off-street pipe installation along the south side of 4th Street, the City will provide new bituminous surfacing for the existing parking facilities. Staff will contact residents concerning pending project details. . Estimated costs The engineer estimates a project cost of $96,555, including construction engineering and contingencies. A detailed estimate 18 attached. . Schedule June 1 Council approves plans and orders bids June 2, 9 Advertise in Sailor June 4, 11 Advertise in Construction Bulletin June 24 Bid opening July 6 Award bid July 19 Construction begins . Recommendation . Staff recommends approval of the project. Project costs are now estimated to be considerably lower than the anticipated $150,000 cost in the feasibility report. Costs will be paid for by utility fees and the proceeds from the scheduled July 1999 sale of the $1.55 million Storm Utility Revenue Bond. ---.-.---.- -. -- ~ ~ ~~~ , . I I j - ~, . ~ i ,- ~ , , ~ ~ o " ~ ~ ~ c__ \ \ ~ \ - ~ \ ~ I !i \ , \ \ ~ ~ 5 e I ~ ~ ~ ~ ~ . CITY OF HOPKINS AREA 2, HILL TOP PARK STORM SEWER IMPROVEMENTS COST ESTIMATE CITY PROJECT 98-17 SEH-RCM FILE No. AHOPKN9905.00 61.00 05/11/99 Revised 5/24/99 No. Item Unit Unit Price Quantity Amount 1 Mobilization LS $10,000.00 1 $ 10,000.00 2 Traffic Control LS $ 2,000.00 1 $ 2,000.00 3 Remove Bit. Pavement SY $ 3.00 925 $ 2,775.00 4 Aggregate Base-Class 5 Cy $ 20.00 150 $ 3,000.00 5 Bituminous. Wear Course Ton $ 35.00 130 $ 4,550,00 6 Manhole 0-8' Deep Ea. $ 3,000.00 2 $ 6,000.00 7 12" RCP Storm Sewer LF $ 50.00 45 $ 2,250.00 8 15" RCP Storm Sewer LF $ 32.00 40 $ 1,280.00 9 12" Storm Sewer LF $ 30.00 570 $ 17,100.00 10 Wood Bollards Ea. $ 80.00 60 $ 4,800.00 . 11 12" Flared End Section Ea. $ 450.00 2 $ 900,00 12 Provide & Install Casting SF $ 300.00 2 $ 600.00 13 B618 Curb & Gutter LF $ 10.00 300 $ 3,000.00 14 Valley Gutter LF $ 10.00 245 $ 2,450.00 15 Seeding SY $ 1,00 350 $ 350,00 16 Sod SY $ 4.00 1400 $ 5,600.00 17 Crushed Rock Pipe Foundation Ton $ 15,00 30 $ 450,00 Total Construction $ 67,105.00 Engineering $ 16,100.00 Construction Engineering $ 6,700.00 Contingency $ 6,650.00 TOTAL $ 96,555.00 .