Loading...
CR 99-122 Preliminary Plat ~--------~-- ---- - -- -- "-------~- ~ -- -- ----- -- -- - --- ---- ----~-~---~----~- C\TYOF ~<I>? July 15, 1999 HOPKINS Council Report 99-122 PRELIMINARY PLAT 0 Proposed Action. Staff recommends the following motion: Move to approve Resolution 99-58. preliminary plat for the former Alliant Tech parking lot (Beard Group). At the Zoning and Planning meeting, Mr. Gleeson moved and Mr. Blair seconded a motion to approve the preliminary plat for 61-unit development on the former Alliant Tech parking lot. The motion was approved unanimously. Overview. The applicant, The Beard Group, is proposing to construct single family homes on the parking lot that was previously owned by Alliant Tech. The site is approximately 9.5 acres. The development as proposed consists of 58 single-family homes. The plat will have 58 lots that vary in size because of the PUD zoning. The price range will be approximately $150,000 to $200,000 and have a homeowners association. The site is currently zoned R-I- C, single family medium density. The Zoning and Planning Commission has recommended a rezoning to R-1-~ PUD. The applicant has also submitted a 48-unit development that does not have a homeowners association. However, after a neighborhood meeting, the neighbors indicated they would 0 rather have a development with a homeowners association. The applicant has stated that he is willing to do either development. Primary Issues to Consider. 0 What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? 0 Do the lots meet the zoning requirements? 0 What are the specifics of the plat? 0 Will a park dedication fee be required? 0 What was the discussion at the zoning and planning meeting? SupportinS! Documents. 0 Analysis ofIssues 0 Preliminary Plat 0 Grading and Utility plans 0 Resolution 99-58 ~0 GrdoAlWY) Nancy Anderson, AICP Planner 0 -- ----- ---- - - - ------ - - - ~ --- - --- - ---.--- CR99-122 Page 2 0 Primarv Issues to Consider. 0 What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? The zoning of the property is R-I-C, single family medium density. The Comprehensive Plan has designated the site as low density residential. If this project proceeds, the zoning would have to be changed to R-I-A, PUD. The applicant has applied for a rezoning. 0 Do the lots meet the zoning requirements? Because of the R-I-A, PUD zoning, the lot sizes can vary. The lots are generally 40 feet wide. 0 What are the specifics of the plat? The plat will have three blocks. The following is the number of units per block: Block I, 30 units; Block 2, 14 units; Block 3, 14 units. The site will have a total of 58 single-family lots. The lots vary is size from 3896 to 10038 square feet. The typical lot is between 4000 and 5000 square feet. 0 There will be a ponding area on the northwest comer of the site. This ponding area will be an outlot. There will be a trail easement on the north side of the site to provide access to the park adjacent to the site on the north side. The exact location of the easement will be determined on where the utility connection will be made. Also, the streets will be privately owned and will be platted as an outlot. Access to the site will be from Second Street N.E. 0 What are the specifics of the development? House description The typical unit will be 45' x 25'. The homes will be two-story with a tuck-under garage. The homes will not be able to have basements because of the high water table. Exterior The exterior is proposed to be maintenance free siding with options of brick or stone fronts. Access There will be one access point from Second Street N.E. Traffic 0 Since the site is not currently used, any development will add to the traffic in the area. Staff would recommend a traffic study for the proposed development. ---. -~ --- ~ - .- --~--~- - -- - -- -- ---- -- -- -- ---------,- -- -- -. --- ---. ---- - ---- ---- -- --------- -~-_._-- -.. -- - - --- .- -_._----.---_._-------------~. ~ ---- ~-- CR99-122 Page 3 0 Trash The homeowners association will contract for trash pick-up. Drainage There will be a ponding area on the north side of the site. Minnehaha Watershed District will have to approve the drainage for the site. Parking Each unit will have its own garage, which meets the parking requirement. Fire Marshal The Fire Marshal has not had time to review the new plans. Staff will report the Fire Marshal's comments at the City Council meeting. Public Works Public works reviewed preliminary grading and utility plans. The following comments are 0 provided: Public Works review of the submitted plans is based on the assumption that utilities and streets within the development are private. If the 48-unit development is approved, the streets will be public. Sanitary Sewer The City is opposed to sanitary sewer installation across trails and athletic fields at Oaks Park. The developer should consider installing the private sewer main in the existing adjacent easement along the east side of the site or along Tyler Avenue through the very west side of Oakes Park. No details were provided of the connection to the City's interceptor line in Lake Street N.E. Is an inside or outside drop section anticipated? Water Main No water main valves are shown on the plans. We reserve comment until further detail is provided. Hydrant numbers and locations need to be verified by the Fire Marshal. Storm Sewer 0 The City requires a storm water management plan per City Code and will refer the plan to its consultant for review. The developer will need to assume consultant costs estimated at ---------- CR99-122 Page 4 0 $2,000. Further comment on pond design and capacity is reserved until more details are provided. The City recommends more street catch basins and a closed connection at the southeast comer of Tyler Avenue and Lake Street N.E. A right of entry and access agreement concerning the N.U.R.P. pond should be a condition of the development agreement. Streets Is the entrance on Second Street N.E. wide enough? There should be sufficient width to accommodate full movement of trucks. Will location of entrance have negative impact on City's pedestrian crossing warning flasher located on Second Street N.E. The City needs to contemplate future sidewalk needs along the east side of Tyler Avenue. The revised grading plan should show a concept six-foot sidewalk that helps demonstrate its impact on site grading along Tyler Avenue. Site The developer needs to provide a fence between Oakes Park and the development. 0 Surrounding Uses The site is surrounded by single family residential to the west, a City Park to the north, Hopkins Aches apartments to the east, and industrial uses to the south. 0 What is the timing for the proposed development? The applicant would like to start the development this fall and have a model open in the fall of 1999. 0 Will a park dedication fee be required? A park dedication fee of $500.00 per unit will be required. 0 What was the discussion at the Zoning and Planning meeting? The discussion on this item was combined with the rezoning. No one appeared at the public hearing on the preliminary plat. 0 -------. -----------~~-- CR99-122 Page 5 Alternatives. 0 1. Approve the preliminary plat for a 58-unit development. By approving the preliminary plat, the applicant will be able to construct the development as proposed. 2. Approve the preliminary plat for a 48-unit development. By approving the preliminary plat for 48 units, the applicant will be able to construct the development for 48 units. If the City Council chooses this alternative, one condition should be that the applicant has executed a development agreement detailing all the conditions for approval of this plat prior to approval of the final plat. 3. Deny the preliminary plat. By denying the preliminary plat, the applicant will not be able to construct the development as proposed. If the City Council considers this alternative, findings will have to be identified that support this alternative. 4. Continue for further information. If the City Council indicates that further information is needed, the item should be continued. 0 0 ~ ~ / " ------- ----- '- - ---- ----- '" ~ _ ';" ,"C' ';:" cc_-':':'',;:' ~ ~,_- - - -,- - - :~~-~ ~~~ ~:='F~"~ -~;}ron :-.~~ L:!~~~f-~7' \ is OUTLOT A \ \ <Xi ", 75 SETBACK UNE ,61 I ' . ..- ~ I 80 -;'~=t:.:~s~,;~,-;:~:~!II . ,'-""".-.,'" 7 "~"" -' -, ",,- . ,,'" + ".., """,.,'.., r,,-, ~ ,. _L \ ... 9 ~2'-\ ' .;:i 't~' t I ~ \ 0 \ - \ 0- \ D- ~ \ w \ u ~~ X .?'.F" ..~,__""__'_ \ w (; ,~~~t;~~ ,.:'::::':, ,; \ ;'-" " \ ~ I '''N'''':__::'',:~;_~ -, lOa \1: " '\:::,==}~:,~~~~if \__" ~;,. . '.0''',> \ \ 1_- - --,:-- AVENUE -, -- -' -,-- ,,'"" ,'_' "','""" _,"",' ", ,. ,.." '''"",,,, ;:';r;,,~!.h;', ',C~~;""", ",,,,,,' ,'" "",,,, " ." '-"~'" '~-"'~"""=- .... --- -- ----------- / REVISIONS I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR I OATE 8Y REVISION REPORT WAS PREPARED By ME DR UNDER MY DIRECT SCHOELL & MADSON INC, SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL . ' 6-.30-99 JB LAYOUT -PRELIMINARY PlAT ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. ENGINEERS .. SURVEYORS .. PLANNING SOIL TESTING . ENVIRONMENTAL SERVICES - - 10580 WAYZATA BOULEVARD. SUITE 1 DATE, REG, NO, MINNETONKA, MN 55305 (612) 546-7601 FAX: 546-9065 REVIEWED BY, DATE I www.shoellmodson.com '- 7" (95-82) " _~ _ _ EiXIS+-INV=905:7lr'- - - -w- -- - -.-- - - --w- =~.: -. .t--__~___ __"1__ ~_~ ~,,,_ :..-"'-' 7iT::>. -- -....,..... ,i~:~--.. .....- g.;."," :'Jh.. .;/,,'," !V;.;' 1.1:: --_.-~- -~ ---.....,... D.Si""..... -- , , "- ""'-----~------ '- '''--~ '''-~-3-i '- '" '-',,- ", .....'c~::... -', '~............. OJ 1CJ '~, , TYPICAL UNIT " ", -35,~ 0 .,; '" DRIVEWAY i5,0 CURS ., " ":",, ,,::--"-'" X _,..e.-...... ,:iP" N-3"17'&2':W---. -- ::': ,.. .. -<;-- '- "L-t~ ,-," -TYLER- - A VEN~E - - -'-:::' -- . -'~:::";"":,,.;::e -:,..=,:~ Cr'!"i;-":':~.".' "","-" c...... ,,'" """':. ~":""...,,,,, "."",..".",", """",,,,'.::," ,,-eu",'_," ,;,.c- ~:".....' ,,~. ..,,,,...,. - - - .'. ,. - - - _.~~::~~'~~__....h_....__ ~.. ..._..... _._____.:~-::'~:~, _._'~"j::_'= __.. ___ =::-'''''::.='-''''=-=: ...._==.m,_==-" - - /" REVISIONS '\ I HEREBY CERnFY THAT THIS PLAN, SPECIFICAl10N, OR I SCHOELL & MADSON, INC REPORT WAS PREPAAED BY ME OR UNDER MY DIRECT DATE BY REVISiON SUPERviSION AND THAT I AM A DULY REGISTERED PROFESSIONAL -e- ENGiNEERS . SURVEYORS . PLANNiNG ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. SOIL TESTING . ENVIRONMENTAL SERViCES 10580 WAYZATA BOULEVARD, SUITE 1 MINNETONKA, MN 55305 DATE: REG. NO. (612) 546-7601 FAX: 546-9065 I www.shoeIJmodson.com RtvlEWED BY: DATE '-.: ./ (95-62) :i~l:2 14:5:2:5:2 F:\ENG\63:22B\OOl\02\632:2BOOLdwg MBS WET TAP TO EXIST 6" CIP _ __ _ w:~E~A~ -u- _ _ _~:_ _ __ ._!.:'_ ._ __ -w-. _.~ -~~- ~, .- Ilt...... - -- .". _-;:_._ .c __ :to _. __ --\11.... - ::E .-... .'- 'in- . ..... -.... 12+00 .:!.;i'f 0+00 ',," ~ \ SEE SHEET 3 6" SAN " \~ .!. ",;: NWl-902,5 I -~ e -."".,.,,,.. "" .,-.....=:,,.....\.,,, ..~:"',.~. SEE SHEET 3 _ _ _ _ _ ''''''..'''' ,." ..".,. ".""'~.,, --",," ,," ~"--" "' 'C '- ,::'~ __~~~l ,= ~_ ~<~~- ~~~~,:;;~:-~ :--~:~~:~:~,:_ _ ,.:_0',~.~ .~ -TY~~:=-~~' ~.,,,,,..,- - .,.~.....",,~. - :~:.::::~"~~'.~.__..~::~::~~~':~'___~.'~:~:1-....__.. .~~:.'~~~~..C ...._..... ~_ ._.~...__::::=____~__...~ _ _ / REVISIONS I HERESY CmnFY fHAT THIS PLAN, SPECI~CAnON, OR I SCHOELL & MADSON INC REPORT W/>s PREPARtD BY ME OR UNDER MY DIRECT , , DATE BY REVISION SUPERV'SION AND THAT I AM A DULY REGISTERED PROFESSIONAL e ENGINEERS .. SURVEYORS .. PLANNING ENGINEER UNDER rHE LAWS or ThE STATE OF MINNEsoTA. SOil TESTING . ENViRONMENTAL SERVicES - - 10580 WAYZATA BOULEVARD, SUITE 1 MINNETONKA, MN 55305 REG, NO, (512) 545-7601 FAX: 546-9065 I wlYw.shoellmodson.com REVIEWED BY: DArt '- ./ (95-82) ,12 14:56:23 F:IENG1632281001102163228001,dwg MB6 -- - -",,,,....,,... t \ 1~;~ -~~= '.=: ,._, " -~~~~=~~ , , Ii \ \ '''',,~ ':~ Crl-- ,/ '. IT t, :1 ! 1; , .... ' f... " \ L h ' Ii -0, \ \ ',' If I /~' , \ I "" i \ \,,~ \ \ ~ I / \ \ \ l" ' n I, , \ \ b 'I' \ Iff , \ ' '!: \ \ it i, ; r \ \ / I' ! . J ii: 1 \ ' , I ! \ i \i ,;~ , i I \ I ~ ' \' I' 1 ' Ul ' ; b \ /",\ II \. 'OJ -- 1 \ Ii \ ('R"",;j l \ , ; Ii \ 1"._. J I i i . I'" ~ ,/" ---~" / \ ./ " n I. \" " , i- " ,- / -'-'" I . \ '.'''' ".,_,--// /" I- 'i, I \ ""'::::::'-'-';' \ I / , ',--___" ...__/ i ! III hi \ ................."""- \. MH 1 ~EE S~3-""'" , I " '" "" ~ ' ~ - , SAN \n <> ............\ ! ' RIM 908.0 ...._ a 1, \ " ',,- \ Y INV-894,51 n Ii' ,_ ' \ /~t.--" /__'. :: \ wI", \ I c, '""::-'/:::.1 ~/--' ''-'' . ,,'i 151: ^' ,\ I:' ,>,g:://'''' " \, ,p \ " ~'<:-C'"// \ 4- \ ~ . '\/~ <.//' Ii, I. ,., \ \" 5~ 7' / ! ~ ...... -,,' r6 /"/'/,/ f\j i g .j // / .,. \' IV..? / I,' h~/ i \ ~ t " / , 1 ' CONNECT Tal, .b ~ I ,} ! mi'krk,\\ \ \ 0 II ;/- , I It/". \i\ \ III (*,,'," i '" (. " . I ' \ \:~);lli 0 ^.' \ _ .' .' \ 1'- ..._d 1 '"~ \ 1, ;j~ ,f' .:~-- -,- "'" \ 4 \ ; I 1 I !c' STORM SEWER- \ ! , , ! I' OUTLET MH I \ ' J : I I HOCKEY ~~=~g~:~t NWl-9D2,5 \ ~ ?1 \ \ I \ HWl=906.0 " --, 'I \ H i.it i ! \ \ '; ! I I \ I; '~,~~,?!;,:~;;.:'~'~:~) "'::;" ,::"""""" '" // ~--:.::=-"-~- -==-== == : ,'7 J ......."..M_, ' . ,n_ REVISIONS "'\ r HEREBY CERTlFY THAT THiS PLAN, SPECIFICATION, OR I SCHOELL & MADSON, INC REPORT WAS PREPARED BY ME OR UNDER MY DIRECT OATE BY REVISION SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL -e- ENGINEERS . SURVEYORS . PLANNING ENGINEER UNDER THE LAWS OF TIiE STATE OF MINNESOTA. SOIL TESTING . ENVIRONMENTAL SERVICES 10580 WAYZATA BOULEVARD, SUITE 1 MINNETONKA, MN 55305 REG. NO. (612) 546-7601 FAX: 546-9065 I www.shoellmcdson.com REVIEWED BY: DATE -..;;.: ./ (95-82) --07-12 14:51:31 F:IENG\63228\001102163228001,dwg MBB PROPERTY ' STREET~ LINE It STREET h AS REQUIRED . \ I I CURB BQX 5 I > 0 - u I z '" 10 I r-. CORPORATION I STOP I 1" COPPER, END AT CURB 2 LAYERS OF STOP UNLESS GROUND WATER TAR PAPER OR IS PRESENT POLY CONCRETE BASE NOTE: 5. TIE ACROSS ALL JOINTS TO TEE ON WATER SERVICE DETAIL MAINL!NE. HYDRANT DETAIL WTM-2 1-99, REV: WTM-JA CASTING SHALL BE NEENAH Rt 542, WITH TYfE ~c: COVER. OR APPROVED EQUAL. SEE SPECIF!CATION SEC. 21J fOR CASTING ADJUSTMENT PROCEDURE BRING GROUND ELEVATION TO TOP IN ROAOWAYS'l ~ OF CASTING, OR AS DIRECTED 8Y THE ENGINEER. " ~ ~~~~ ~~~tR~~T~J~rriN~N~IN2~ciu~~GSO~H:~~ ~ETS1OE T; .;, OMlY PRIOR 10 BACK tiLLING. NO GRtlU1 SHALL SE P.LAcED ON THE INSIDE FACE Of RINGS. MAXIMUM or 12" (RINGS AND MORTAR) BETWEEN BOTTOM Of CASTING AND TOP OF '. CONE SECTION. .~.~ PRECAST REINFORCED CONCRETE ~ , MANHOLE, A5TM C-.t7B 0: '", ::; ,; SEE JOINT DErAIL. (SAN-7) I :00 r-. ::;w -z ~~ m MANHOLE NOlES: e~ g 1 MANHOLES WILL BE INSTALLED WITH BELL ~ END FACING UP FOR uNIFORMITY. ~ 2 REINFORCING SHALL BE A MINIMUM OF A SINGLE LINE WIRE FABRIC HAVING AN AREA OF NOT LESS THAN 0.12 sa. IN. PER FT. OF HEIGHT. r; U\<I SLO?( TYPICAL MANHOLE ?,p( \<1'1>11\<10, fOo> II"~ ? ~ 1/2 PIPE DIAMETER MtNIMUM SLEEVE NOTES: TYPE "A" SERVICES TO BE USED IN CONJUNCTION WITH PLASTIC PIPE SEWER MAIN 1. Shim ar adallter lar ~ (I11nstandcrd pipe allowable. AND CLAY SEWERMAINS WITH LESS THAN 12 FEET OF COVER, ALL SERVICE PIPE OR 2. Flexible !llellVe Sholl be a neoprene material meeting TO BE INSTALLED AND BEDDED IN ACCORDANCE WITH THE APPROPRIATE PIPE BEDDING thc requirements 01 ASTM C-443 ar the fallawinq DETAIL AS INDICATED IN THE PLANS/SPECIFICATIONS, Elostomer [POM; ff~~li;~re:r~u~~~~ ~5~i ~\~'. m\~ g: ~~ g : ~ ~~ ComlJrelisiclM Set 25,; malt. (22hrs. @70 C. INTEGRALLY CAST ASTM 0 J95, POStTlVE Method a) SLEEVE SEAL MECHANICAL SEAL Duromeler 50 :f: 5 (ASTM 0 2240) WATER TIGHT SEALS J. FIl~II(;ble sleeve dimen!!icns shell con/arm to producer!! SANITARY SEWER SERVICE st~mdcuill-. 3-9a, REV; STANDARD SANITARY MANHOLE SAN-5 CONNECTION-TYPE "A" SAN-J (DATE REVISIONS '\ I HEREBY CERTlf'( THAT 1HIS PL.AN, SPECIFICATION. OR I BY REVISION REPORT WAS PREPARED av ME OR UNDER MY DIRECT SCHOELL & MADSON, INC. SUPERVISION AND iHAT I AM A DULY REGISTERED PROFESSIONAL -e- ENGINEER UNDER THE LAWS or THE STATE OF MINNESOTA. ENGINEERS . SURVEYORS . PLANNING SOIL TESTING . ENVIRONMENTAL SERVICES 1 D580 WAYZATA BOULEVARO, SUITE 1 DATE: REG. NO. MINNETONKA, MN 553D5 (612) 546-7601 FAX: 546-9065 "- ./ REVIEWED BY: DATE I www.shClellmodson.com (95-82) 0_('\7_1" 1/1./11=;.!:;11 !:.\..~..,.......+...~\r....I.,:......\....I... ....1.-.- r", . CITY OF HOPKINS . - Hennepin County, MInnesota RESOLUTION NO: 99-58 RESOLUTION MAIClNG PlNDlNGS OF FACr AND APPROVING APRBLIMINAllY PLAT ON 11IBPORMBll ALLIANT TBCHPAlUCING LOT WHERBAS. an applicatioD ibr a Subdiviaicm, SUBD99-I, has been IIIIde by The Beard Group; WHERBAS. the procechnI hilltoly ottbe application is u fol1owl: 1. That an appli_OI1 for a pnliminary plat wullllde by The BeInI Group 011 May 28, 1999; 2. That the HopJdas 7.onil1lJ aDd PlIumil1lJ Commillion, punwmt to mailed ad publisbed notice, held a public Ja.riDa on the application ad nwiewecl IUCh application on JaM 29, 1999: all perIODI preIIeIIt WIn am. ~ opportuDity to be t.rd; 3. That the W1iUw oo..'...8J't1I111d 1DII)'IiI otCity ltat!'wem COIIIicIerecI; ad 4. A 1ep1 delcription otthe lUbject property is u foDOWI: Tract J IIDd Weat 581.55 feet of Tract 18lIo that part ofw.t 581.55 feet otTnct It lyiDs lIOUth olnorth 434 feet thtnof;...... Laud Survey No. 561. NOW, TRBRBFORB, DB IT RESOLVED that the application for Subdivision StJBD99-1 is henby Ii... JR'lmin."Y ~oval buecI on the followiDa Findiv ofFICI:: 1. That the proposed plat meeI:I the minimnm nquil'emera of the IUbclivilion ordinance. DB IT PUltlHHK. RESOLVED that application for Subdivision StJBD99-1 is henby ....-owd lUbject to the followiDa concIitioDa: I. That the property is raooed ftom 1.-1-C to I.-I-A, PUD,IIDd that the appliClllt compliea with aD concIitioDa of such t( ~nil1lJ. 2. That the appJiaud: ad the City werwt. a PUD cIIIveIopmeut .(~"n that nquires the fol1owiaa to be 1atis8ed by the cIeveloper: a) Submitt.l ofa Btarm water m&IIPD""'ent plan aDd appnmI of the plan by Itaf[ b) ThatthefiDal......1IId utility plaD is submittfd IIDd ippJ'O.t by Itaft'lIhowiDathe II'OIioD CCuJb~ mea... i4lb....ation d.i1i"IJ the ItoIm structureI, publio utiIiti-. ad pmpoIecI hookups. 0) A WIterIbed disIrict permit. is obtaiDecI. cI) The developer... to nimbune the City all COlts to complete a tII8ic study to ftNiew the ICCIII to the site ad the acceu points on Second Street N.B. Site plan 8baII be nwiIecI to addreu . . 0 recommendations of the traffic study. e) That the applicant meets all the requirements of the subdivision ordinance. f) That the applicant provides the City with the by-laws of the homeowners association and the Declaration of Covenants, Conditions and Restrictions, and they are acceptable to staff. g) That the PUD Development Agreement shall include the design standards for improvement and building to be constructed within the pUD as specified in the City Council Resolution approving the pUD rezoning. h) Payment of park dedication fees, as required by ordinance. i) Granting of any easement not dedicated on the plat. j) Execution of an access agreement for access to N.U.R.P. ponds and drainage improvements. k) That the site meet the landscaping requirements. 1) That there is a fence constructed between Oakes Park the development. m) All road and utility construction to be completed per City standards. Developer to provide complete construction plans per City standards to be approved by staff. n) Letter of Credit or other financial guarantees for completion of road, utilities and grading. 0) Developer to provide evidence of title acceptable to City Attorney. p) Assessment for any public work. q) That the developer obtains all off-site easements required to provide utilities to the site. r) That the developer provides areas to accommodate pedestrian walkways as determined necessary by the staff. s) That a fence is placed around the N.U.R.P. pond. t) Other items as determined necessary and appropriate, including compliance by the developer with 0 all requirements of Hopkins Ordinance Section 565. u) That the PUD Development agreement shall be recorded as an encumbrance against all land included in the plat at the time offiling of the plat, and shall be executed or consented to by all owners and lienholders. 3. That the final plat shall comply with all subdivision and platting requirements of the Hopkins City Code and Minnesota Statutes. Adopted this 20th day of July, 1999. Charles D. Redepenning, Mayor ATTEST: Terry Obermaier, City Clerk 0