CR 96-77 Construction CHange Order - Lot 300/400April 12, 1996 Supporting Information. • Change Order No. 4 Steven J. Stadler Director of Public Works Council Report 96 -77 APPROVE CONSTRUCTION CHANGE ORDER #4 LOT 300, LOT 400 AND RELATED IMPROVEMENTS CITY PROJECTS 94 -13 AND 91 -13 Proposed Action. Staff recommends adoption of the following motion Move that Council approve Construction Change Order No. 4 as it relates to Alleyscape and Lots 300/700 Improvements, Projects 94 -13 and 91 -13. Overview. In late February, 1996 RLK informed staff of a $16,640.36 construction change order. Other than some minor signage work in Lot 700, this project has been complete for over a year. On the last request for payment, dated February 13, 1995, RLK indicated substantial completion of the project Staff was under the impression construction payments were up to date. As it turns out, the contractor had not benn paid for several major construction items. It is unclear how this work could have gone unpaid, and unnoticed by the contractor, this long. Nonetheless, City staff requested the work, the work was completed, and the contractor wasn't paid. Primary Issues to Consider. • Project background, scope and change order details • Staff recommendation Council Report 96 -77 Page 2 • Analysis of Issues • Project background, scope and change order details The original scope of these projects was to improve Lots 300, 700 and adjacent alleys. The project scope grew, via change orders #1 and #2, to include the east City Hall parking lot, work in the north Suburban Chevrolet lot, and asphalt work on alley `B ". In addition, changes were needed to correct a plan error on asphalt quantities. As a result, the contract amount increased from $187,319 to $233,523. Further changes were ordered necessitating change order #3. This change order covered additional asphalt patching in Lot 300, asphalt work and storm drainage improvements on 8 Avenue North near Lot 700, and asphalt patching and driveway work around Lot 700. Change Order #3 increased the contract amount to $261,449.37. Change order #4 is primarily a result of upgrades to the parking lot lighting and an new 100 amp service to the Downtown Park. The original contract called for salvaging existing light poles and fixtures. This was upgraded to include 5 additional lights, a total of 8 new light poles and bases, and the associated conduit and wiring work. Staff Recommendation. Staff has carefully examined contract payments to date and confirmed that payment hasn't been made. We've also confirmed that the additional work was ordered by staff and completed by the contractor. Staff recommends payment. CITY OF HOPKINS I hereby acknowledge that the items listed here have been reviewed by RLK Associates, and are recommended for payment` I hereby acknowledge that the items listed here have been reviewed by Hardrives,Inc and are recommended for payment. I hereby acknowledge that the items listed here have been reviewed and are recommended for payment ALLEY C & RELATED IMPROVEMENTS CTTY PROJECT 94 -13 ALLEY 300 AND RELATED- IMPROVEMENTS CITY PROJECT 91 -13 CHANGE ORDER 4 TO CONTRACT PREPARED BY: RLK ASSOCIATES, LTD 6110 BLUE CIRCLE DRIVE SUITE 100 MINNETONKA, MN 55343 CONSTRUCTION BY: HARDRIVES, INC 9724 10TH AVENUE NORTH PLYMOUTH, MN 55441 vze 44/ ves, Inc D a--- 7- 1 -1&. ALLEY C LOT 300 & 700 CITY PROJECT 94 -13 CITY PROJECT 91 -13 TOTAL ORIGINAL CONTRACT AMOUNT $ 187,319.00 ALLEY C CITY PROJECT 94 -13 ORIGINAL CONTRACT AMOUNT PREVIOUS CHANGE ORDERS CHANGE ORDER 3 ADDITIONS THIS PERIOD CHANGE ORDER 4 REVISED CONTRACT AMOUNT $ 23,250.00 $ 987.50 $ 7,932.54 $ 32,170.04 LOT 700 AND LOT 300 CITY PROJECT 91 -13 ORIGINAL CONTRACT AMOUNT LOT 700 LOT 700 PREVIOUS CHANGE ORDERS CHANGE ORDER 1 CHANGE ORDER 2 CHANGE ORDER 3 ADDITIONS THIS PERIOD CHANGE ORDER 4 REVISED CONTRACT AMOUNT $ 108,616.00 $ 55.453.00 $ 164,069.00 $ 31,374.00 $ 14,830.00 $ 26,938.87 $ 8,707.82 $ 245,919.69 LOT 300 • Furnish and Install Conduit and Wire Conduit and wire was installed for a sprinkler circuit to the park south of Lot 300. The work was ordered and approved by Vern P. of the public works department. • Change in Parking Lot Lighting and Wiring Bid Item #23 addition to contract Lighting of the parking lot area was revised. New poles and fixtures were utilized. The changes in the scope of work were requested'and approved by City Staff prior to construction of the project. • Furnish and Install 100A Service Bid Item #23 addition to contract A 100A service for the downtown park with GFI receptacles was installed. The changes in the scope of work were requested and approved by Vern P. of public works department prior to construction of the project. 671.62 $ 4,797.80 $ 3,238.40 Subtotal Lot 300 $ 8,707.82 ALLEY C DOCUMENTATION FOR, CHANGES TO THE CONTRACT • Furnish and Install Hand Hole Furnish and Install Conduit and Wire $ 1,952.54 During construction of the entrances off of 8th Avenue N. an existing 1 112" PVC conduit and No.4 wire was pulled up. The system feeds the street lights along 8th Avenue N.. The work was ordered and approved by Vern P. of the public works department. • Change in Parking Lot Lighting and Wiring Bid Item #23 addition to contract Lighting of the parking lot area was revised. New poles and fixtures were utilized. The changes in the scope of work were requested and approved by City Staff prior to construction of the project. $ 5,980.00 Subtotal Alley C $ 7,932.54 Total Change Order Lot 300 Total Change Order Alley C Grand Total $ 8,707.82 $ 7,932.54 $ 16,640.36