CR 06-022 Public Hearing 2006 Street & Utility Project 05-10 CITY OF m HOPKINS . February 7,2006 Council Report 2006-022 Public Hearing 2006 Street and Utility Improvement Project City Project 05-10 Proposed Action. Staff recommends adoption of the following motion: Move that Council adopt Resolution 2006- 010. Resolution Orderina Improvement after Public Hearina. 2006 Street and Utilitv Improvement proiect. Proiect 05-10. and companion Resolution 2006-011. statina Citv's intent to sell revenue bonds to fund this proiect. and authorize the Mavor and Citv Manaaer to enter into an aareement with Bolton and Menk. Inc. for proiect enaineerina services. This action continues an assessable project for street improvements. Overview. At the September 20, 2005 meeting'the Hopkins City Council authorized Bolton and Menk, Inc. to prepare a feasibility report concerning street improvements in the residential area just west of the public works facility. The report was presented to City Council at its January 3, 2006 meeting and a public hearing was ordered for February 7, 2006. Hearing notices have been mailed to all affected property owners of record. In accordance with state statutes, City Council needs to conduct the public hearing and determine authorization of the project. Following the public hearing, if the project is ordered (Resolution 2006-010), City Council is asked to authorize the engineering services for the project and to state the City's intent to sell revenue bonds to fund the project, by adoption of Resolution 2006-011. Primarv Issues to' Consider. . Scope of improvements . Public Input and Project Schedule . Project costs, assessments and budget . Public Inpu.t . Engineering Services . Staff recommendation Supportina information. . Public Hearing Notice, Affidavit of Mailing and Proposed Pending Assessment Roll . Preliminary Project Costs, Assessment Table and Drawings . Engineering Services Agreement . Res lutions 2006-010 nd 2006-011 Financial Impact: $ 837.825 Budgeted: Y/N Y Source: Utilities. PIR. SA Related Documents (CIP, ERP, etc.): CIP Notes: PIR: $342.721: Utility Funds: $143.633: Special Assessment: $351.471 Council Report 2006-022 Page 2 Analvsis of Issues . Scope of Improvements Pavements: Pavement conditions, pavement thicknesses and underlying soils dictate reconstruction of all asphalt pavements within the project area. Current street widths will be maintained. There is no curb and gutter in place with the exception of the southern portion of 20th Avenue South. The project will include curb and gutter in the entire project area. The new pavement section will be 3.5" of asphalt pavement over an 8" Class 5 aggregate base and compacted subgrade. New concrete driveway aprons are proposed for each driveway. Drainage: Drainage improvements include the installation of curb and gutter, relocation of existing catch basins in coordination with the curb and gutter, and installation of additional catch basins as warranted. Utilities: Spot sanitary sewer pipe repairs are proposed. A pre-project video camera inspection of the sanitary sewer has revealed two defects requiring correction. One will be repaired utilizing no dig technology due to its location in Excelsior Boulevard. A fire hydrant will be relocated on 19th Avenue South. Regarding water service replacements, City staff will mail detailed water service history in the area, specific information on the trial water service replacement incentive program and a request form to each resident. No water main improvements are proposed. City staff has not heard yet whether Centerpoint Energy will repair or upgrade natural gas piping in the area. . Public Input A public information meeting was held on Wednesday, December 19, 2005. A questionnaire requesting comments from residents/property owners was sent out. Many of these forms were returned - the feasibility report summarizes comments submitted. The input received from the public meeting and the questionnaire will continue to be used and addressed throughout the final design process should the project be ordered. . 18th and 19th Avenues cul-de-sac In 1998, 18th and 19th Avenues South were reconstructed with cul-de-sacs and curb and gutter. Prior to this time, the streets accessed directly onto Excelsior Boulevard. This Council Report 2006-022 Page 3 project eliminated this access and the subsequent cut through traffic and was completed in conjunction with the Excelsior Boulevard widening project. This area is included in the unit assessment described below. There are eight properties that abut these two cul-de-sacs. The abutting property owner at 135 19th Avenue S. called to indicate his displeasure with the proposed assessment methodology in his area. His basic points were: 1. His section of the street (the cul-de-sac) was completed in the 1996 project and so he should not be assessed for the reconstruction project this year. 2. He does not have to use 19th Avenue to gain access to his property because he could just take down the fence at Excelsior Blvd and drive on it instead. 3. He was told in 1996 that he would not be assessed. 4. The property acquisition in 1996 was unfair. We have researched the 1998 project and have verbally responded to the property owner: 1. He was not assessed for the cul-de-sac and gains equal benefit from the project as the other residents along 19th Avenue. 2. It is not reasonable to garner access onto Excelsior Boulevard. The County purchased property from this landowner to widen Excelsior Blvd and prevent this kind of direct access. 3. The Council packet from January 12, 1996 has a number of references to assessments. There are two petitions and a public information sheet that state there would be no assessments on the 1996 project for residents of 18th or 19th Avenues South. This was not a promise to never assess for any street improvement project in the future. 4. The City did not acquire any property from this owner. Hennepin County did acquire some land on the south side of this property. Council Report 2005-015 Page 4 Proiect Schedule Present Feasibility Report and Order Public Hearing.................. January 3, 2006 Public Hearing.................................................................. ..February 7,2006 Approve Plans and Order Bids...............................................March 21, 2006 Bid Opening and Order Assessment Hearing.................. ........... May 2, 2006 Assessment Hearing... ............... ......... ......... ...... ......... ...... ....June 6,2006 Award Bid... ............ ............ ............... ...... .................. ...... ...June 6,2006 Construction.................. ,.................... .............................. ..June - October 2006 . Project costs, Assessments and Budget Proiect Costs The total estimated project cost is $837,825. These costs are split as follows: Street improvements: $694,192 Water Utility: $0 (not including city contribution towards water service replacements) Sanitary Sewer: $2,063 Storm Sewer: $141,570 Assessments The proposed assessments are divided into four areas: 1) 18th and 19th Avenues S. south of 1st Street S.; 2) 18th and 19th Avenues S. between 1st Street Sand Mainstreet; 3) 1ih Avenue S between Exclesior Boulevard and Mainstreet; 4) 20th Avenue S north of Excelsior Boulevard. The assessment cap for this project is proposed at $4,818.40 per unit in assessment area 1 and $60.23 per front foot in the other three areas. The cap applies only to residential properties including the Oaks on Mainstreet. This rate is based on three previous similar street reconstruction projects. Council Report 2005-015 Page 5 The actual assessment rates based on the 70% assessment policy for the areas are: No Cap With Cap 1) 18th/19th Ave south of 1st St. 2) 18th/19th Ave south of 1st St 3) 1 ih Ave - Excelsior to Mainstreet 4) 20th Ave $7,211/ea $99.62/ff $21 .19/ff $76.20/ff $4,818/ea $60.23/ff $21.19/ff $60.23/ff The estimated total project assessed amount = $351,471 (42% of total project) Proiect Budqet The current CIP budget for this project is $1,075,000. PIR: $400,000 Special Assessment: $425,000 Utilities: $250,000 . Engineering Services Bolton and Menk, Inc. proposes to offer plan/specification preparation, construction staking and inspection, project administration and record drawings at a cost of $117,000. This proposal is roughly 14% of a projected construction cost of $850,000. This rate compares favorably with previous projects, including the 2006 street improvement project. . Staff Recommendation Staff recommends ordering this improvement project with adoption of Resolution 2006- 010 and adopting companion resolution 2006-011. Staff further recommends authorizing the Mayor.and City Manager to enter into an agreement with Bolton and Menk, Inc. for engineering services related to this project. f DIST LEGEND UNEAL FOOT ASstsSMENT UNiT ASSESSMEN1\ _J SC,.lOO~ NO 270 ;:01<P ~~_E,2 c" liJ > oj< :t: ".. N- ,. . ~,;; 'd~~} '/2'""'g~ :~~.'~ ,:,"j~:,':o" '!- "- ",1" ~110"'~ ). ....,- ,f4'f ~;~.._ ~ ".1.. OOC-;t;"'Ollb'JT- .0'0.1 ,1; " ~ .~ s"':I'l<:!"; fJ om ~,{' .: - " """ ~: $: ~1:~ '?l~!? ;':-, '. '"-" ., 'N" ______n._ :4\' ,. __n..,___ C . ,r.:, J. '" ~,~ , :~r, -,; :4;~' _. ____n__. , ., :/.':' .. _____n__ , , {..;.C' --,----- , , '~,\ ~> . ~~~~ Iii> , ~~' " LVD ~ " " " 1'::1 nl -sll' "1" : ,; 0(/1 PLAT ,C.J'L c~ reIn -.ClI-- l)(lCw:lt8& "\" /'il: ~11 ;:!i's: ~<C "" i'i -~ <&. .r I ;~ \---- 0'-' NO. c. i~ 60.12 oc~o 31919' (H CSAH NO 3 ,,, " .. " , ~I~ I~'e (U41- .< '3S. " 1,,': -" ~ii '7 " ~i " 18: s: ck I . ~ q::: (5) 6(20) ~;. "'8 18745 <:> ~ ,~ '53 Q ,. o .~, 'BJZ1 i- 8\2n Q :()\~~\ 0 4:!: _, :): ,~,; <.(l o. .z~ , . ":!:~i~ ~.8S' ~. 38; ~ -1 2 :;:S l{3l \ \-- (4 6~""~ 133! 0 V3 \M1 '" (7) ~~t~,O_~; L " ;~~~:'"h~ "=,,, '" 52'48'06'''- l,,,,~ 3165213 ,,,,,,,,,,,~:~~;f~;;~~/ / OQC t-o HSZJ% "': if Tsr\ . 15 FlGURE CITY OF HOPKINS 2006 STREET & UTILITY IMPROVEMENTS ASSESSED PROPERTIES f\\BOL- ToN & MENK. INC. Consulflng: Englnaers lie: SUNeyol"S ~'ro.ltM.fNRlAO<<1",I.fN,s\.EEPl'E\'E.u.NWlt..LJU.R.IolN ~l.INCHASKA.I.lI4w.ES.", ~= NOT TO SCALE l'I,'\\:iiOP-l<\T16217Je\FEAs\Q.sesm~nt.c~ 12_29_t005 laSp'" NOTICE OF PUBLIC HEARING ON IMPROVEMENT 2006 STREET AND UTILITY IMPROVEMENT PROJECT CITY PROJECT NO. 05-10 TO WHOM IT MAY CONCERN: Notice is hereby given that the City Council of the City of Hopkins will meet in the Council Chambers of the Hopkins City Hall at 7:30 p.m. on Tuesday, February 7, 2006, to consider the making of an improvement on 18th Avenue South (from Mainstreet to the cui de sac), 19th Avenue South (from Mainstreet to the cui de sac), 20th Avenue South (north of Excelsior Boulevard), and 1 st Street South (from 17th Avenue South to 19th Avenue South), by reconstruction of bituminous streets including replacement and improvement of storm sewer pipe and inlets and additions of new inlets and structures, spot replacement and improvement of sanitary sewer pipe, concrete curb and gutter construction, and the associated boulevard restoration, pursuant to Minnesota Statutes, Section 429.011 to 429.111. The area proposed to be assessed for such improvement contains the following parcels: Plat Name See Twp Rne: 0/0 Suffix Unplatted 23 117 22 23 117 22 44 0002-0014,0016 Unplatted 23 117 22 23 117 22 44 0087 Boulevard Manor Addn 23 117 22 44 0023-0034,0038-0075 RLS No. 0208 23 117 22 44 0076-0078 RLS No. 0610 23 117 22 44 0079-0081 RLS No. 0731 23 117 22 44 0083-0086 The Oaks ofMainstreet 23 117 22 44 0139,0152 The estimated cost of the improvement is $867,913.00. A reasonable estimate ofthe impact of the assessment will be available at the hearing. Such persons as desire to be heard with reference to the proposed improvement will be heard at this meeting. ~~~ Dated: January 18, 2006 Published in Hopkins Sun Sailor on January 26 and February 2, 2006 Terry Obermaier, City Clerk AFFIDAVIT OF MAILING PUBLIC HEARING NOTIcE STATE OF MINNESOTA SS. COUNCIL OF HOPKINS Terry Obermaier, being first duly sworn, deposed and says: I am a United States citizen, over 21 years of age, and the City Clerk of the City of Hopkins, Minnesota. On January 25, 2006 acting on behalf of the said city, I caused to be deposited in the United States Post Office at the City of Hopkins, Minnesota, copies of the attached notice of public hearing for 2006 Street and Utility Improvement Project, 1Sth Avenue South (from Mainstreet to the cuI de sac), 19th Avenue South (from Mainstreet to the cuI de sac), 20th Avenue South (north of Excelsior Boulevard), and 1st Street South (from 17th Avenue South to 19th Avenue South), City Project No. 05-10, enclosed in sealed envelopes, with postage thereon fully prepaid, addressed to the following persons at the addresses appearing on the attached copy of the mailing list. There is delivery service by United States mail between the place of mailing and the places so addressed. Subscribed and sworn to before me this 25th day of January, 2006. ? A ~~/vLJ~ ,. AJ~. Notary Public . KATHERINE K SWENSON NOTARY PUBUC. MINNESOTA My Commission Expires Jan 31.2010 NOTICE OF PUBLIC HEARING ON IMPROVEMENT 2006 STREET AND UTILITY IMPROVEMENT PROJECT CITY PROJECT NO. 05-10 23-117-22-44-0002 RONALD A PETERSON JANET C PETERSON 40 19TH AVE S HOPKINS, MN 55343 RE: PID #23-117-22-44-0002, 40 19TH AVE S To Whom It May Concern: Notice is hereby given that the City Council of the City of Hopkins will meet in the Council Chambers of the Hopkins City Hall at 7:30 p.m. on Tuesday, February 7, 2006, to consider the making of an improvement on 18th Avenue South (from Mainstreet to the cul de sac), 19th Avenue South (from Mainstreet to the cul de sac), 20th Avenue South (north of Excelsior Boulevard), and 1st Street South (from 17th Avenue South to 19th Avenue South), by reconstruction of bituminous streets including replacement and improvement of storm sewer pipe and inlets and additions of new inlets and structures, spot replacement and improvement of sanitary sewer pipe, concrete curb and agutter construction, and the associated boulevard restoration, pursuant to Minnesota Statutes, Section 429.011 to .429.111. The area proposed to be assessed for such improvement is shown on the back side of this notice. The estimated cost of the improvement is $867,913.00. A reasonable estimate of the impact of the assessment for your property is shown below. Such persons as desire to be heard with reference to the proposed improvement will be heard at this meeting. ~~~ Terry Obermaier, City Clerk DATED: January 25, 2006 Publish: Hopkins Sun Sailor January 26 and February 2, 2006 YOUR ESTIMATED PENDING ASSESSMENT IS: $3,011.50 (please Note: This estimated pending assessment is not payable at this time. If you have questions regarding this assessment, please call the Special Assessment Clerk at 952-548-6310.) The area proposed to be assessed for such improvement is shown below: Plat Name See TWD Rne: 0/0 Suffix Unplatted 23 117 22 23 117 22 44 0002-0014,0016 Unplatted 23 11722 23 117 22 44 0087 Boulevard Manor Addn 23 117 22 44 0023-0034,0038-0075 RLS No. 0208 23 117 22 44 0076-0078 RLS No. 0610 23 117 22 44 0079-0081 RLS No. 0731 23 117 22 44 0083-0086 The Oaks of Mainstreet 23 117 22 44 0139,0152 PRELIMINARY ASSESSMENT ROLL 2006 STREET AND UTILITY IMPROVEMENTS CITY OF HOPKINS, MN 8MI PROJECT NO. T16.21739 CITY PROJECT NO. 05.10 ASSESSMENT RATE CAP TOTAL ASSESSMENT RATE 1st STREET SOUTH RATE FRONT FOOTAGE RATE 1st STREET S. TO THE CUL DE SAC 18th AVENUE SOUTH ASSESSMENT $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 54,818.40 $4,818.40 $4,818.40 54,818.40 54,818.40 $4,818.40 $4,818.40 54,818.40 $4,818.40 $67,45760 $4,81840 $4,81840 $4,81840 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,81840 $4.818.40 $4,818.40 $6,68962 $6,689.62 $6,689.62 $6,689.62 $6,689.62 $6,689,62 S6,68962 $6,68962 $6,689.62 $6,689.62 56,689.62 $6,689.62 $6,68962 $6,689.62 $1,736.87 $1,736.87 $1,736,87 51,736.87 51.73687 $1.736.87 $1,736.87 $1,736.87 $1.736.87 $1,73687 51,73687 $1,736.87 $1,736.87 $1,736.87 $4,952.75 $4,952.75 $4,952.75 $4.952.75 $4.95275 $4,95275 $4,952.75 $4,952.75 $4,952.75 $4,95275 $4,95275 $4,952.75 $4,952.75 $41-95275 UNIT , , , , \ , , , 1 1 1 1 1 \ 14 ZIP 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 STATE MN MN MN MN MN MN MN MN MN MN MN MN MN MN CITY HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS OWNER NAMEI DONNA MAE NELSON GORDON J GULLICKSON JADE M SCHUlZ KEITH R ZIMMERMANN MARTHA A LUBBERS JEAN H KAEDING BRIAN S FREDERICKSON MARK EDSTROM FREDRICK C MULVANY WADE A KRAGTORP VINCENT P COLEMAN ANDREW D }ANIKULA LLOYD S PEARSON RAMONA LEWIS PROPERTY ADDRESS 18TI:IAVES tSTHAVES 18TH AVE S 18TI:I AVE S 18TI:I AVE S t8THAVES t8TI:IAVES lSTHAVES 18TH AVE S 18TI:IAVES 18TH AVE S t8THAVES 18TI:IAVES 18TI1 AVE S 135 131 125 117 113 \07 \0\ 100 106 112 118 124 130 136 PID# 23-117-22-44-0055 23-117-22-44-0056 23-117-22-44-0057 23-117-22-44-0058 23-117-22-44-0059 23-117-22-44-0060 23-117-22-44-0061 23-117-22-44-0062 23-117-22-44-0063 23-117-22-44-0064 23-117-22-44-0065 23-117-22-44-0066 23-117-22-44-0067 23-117-22-44-0068 PRELIMINARY ASSESSMENT ROLL 2006 STREET AND UTILITY IMPROVEMENTS CITY OF HOPKINS, MN 8MI PROJECT NO. 116.21739 CITY PROJECT NO. 05-10 TOTAL ASSESSMENT RATE . 1st STREET SOUTH RATE FRONT FOOTAGE RATE STREET SOUTH TO THE CUL DE SAC " 19th AVENUE SOUTH ASSESSlv1ENT $4,818.40 $4,818.40 $4,8]8.40 $4,818.40 54,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 $4,818.40 54,818.40 $4,818.40 5n,27600 ASSESSMENT RAlE CAP $4.8]840 $4,81840 $481840 $4,818.40 $4818.40 $4,818.40 $481840 $4,81840 $4.81840 $4.81840 $4818.40 $4.8]840 $4,81840 $4.81840 $4,81840 g g g g g .g g g g g g g g g 52 $1,21 $7,21 $7,21 $7,21 $7,21 $7,21 S7.21 Hd! $7,21 $7,21 f!.d! $7.21 $7,2] $7.21 $7):1 $],681.75 $1,68\75 $\,68175 $168175 $1,68175 S1.68J.7S $] 681.75 51,68175 $\,68115 $1.68175 $168175 $1.68]75 $1681.75 $1.68175 $1,68175 $5529_77 $552977 $5,52977 $5,52977 $5,52977 $552977 $5,529.77 $5529-77 $5,52977 $5,52977 $5,52977 $552977 $552977 $5,52977 $5,52977 UNIT 1 1 1 1 1 1 1 1 ! ! ! ! ! ! ! 15 ZIP 55343 55343 ?1lli. 92127 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 STATE MN MN MN CA MN MN MN MN MN MN MN MN MN MN MN CITY HOPKINS HOPKINS HOPKINS SAN DIEGO HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS OWNERNAMEl DANIEL J NICHOLS MAGDALENE D SCHUG THOMAS E DULAC ROBERT SNYDER SR NORMA J RODER ROBIN LYNN BURNS ISAAC CASIMIR JAMES RSTANLEY DOROTIiY M BREN ROBERT A SIEBERS AARON E NIELSEN FLORENCE K OUINN LARRY A HEIMERL DAVID L PEDERSON LEROY A BAER PROPERTY ADDRESS 100 19TH AVES 110 19TH AVES 114 19TH AVES ]22 ]9THAVE S 126 19TH AVES 128 19TH AVES 130 19TH AVES 135 19TH AVES 133 19TH AVES 125 ]9TH AVE S ]2319THAVES 115 19TH AVES 107 19TH AVES 10] 19THAVES 118 19TH AVES PID# 23-117-22-44-0004 23-117-22-44-0005 23-117-22-44-0006 23-117-22-44-0007 23-117-22-44-0008 23-] 17-22-44-0009 23-117-22-44-0010 23-117-22-44-0069 23-117-22-44-0070 23-117-22-44-007] 23-117-22-44-0072 23-]17-22-44-0073 23-117-22-44-0074 23-1]7-22-44-0075 23-117-22-44-0087 ASSESSMENT I ASSESSMENT RATE CAP 55.119.55 54.517.25 $4.517.25 $4.517.25 $4,517.25 $5,541.16 $4,517.25 54,517.25 $4,517.25 54,517.25 $12,705.66 $13.646.81 $73,151.19 $6023 $6023 $60.23 $6023 $60.23 $6023 $60.23 $6023 $6023 $60 .1l N/A N/A TOTAL ASSESSMENT RATE $99.62 $9962 $9962 $9962 $99.62 $9962 $9962 $9962 $99.62 $99.62 578.43 578.43 1st STREET SOUTH RATE $21.19 $2119 $2119 $21.19 $21.19 $21.19 $21.19 $21.19 $21.19 $21.19 $0.00 $0.00 FRONT FOOTAGE RATE $78.43 $7843 $7843 $7843 $78.43 $7843 $7843 $78.43 $7843 $7843 $78.43 $78.43 FRONT FOOTAGE ~ 1>- 1>- 75 ~ 2'- 1>- 1>- 75 75 162 174 ]113 ZIP 55343 55343 ~ 55343 55343 55343 55422 55343 55343 55343 40232.5370 55343 STATE MN MN MN MN MN MN ~ ~ ~ MN KY MN CITY HOPKINS HOPKINS W ACONIA HOPKINS HOPKINS HOPKINS RQBBINSDALE HOPKINS HOPKINS HOPKINS LOUISVILLE HOPKINS PRELIMINARY ASSESSMENT ROLL 2006 STREET AND UTILITY IMPROVEMENTS CITY OF HOPKINS, MN 8MI PROJECT NO. T16.21739 CITY PROJECT NO. 05-10 18th AVENUE SOUTH -1st STREET S. TO MAINSTREE~ PID# PROPERTY ADDRESS OWNER NAMEl 23-117-22-44-0024 1418THAVES LANCE W PRESTON 23-117-22-44.0025 20lSTHAVES GREGG L PETERSON 23-117-22-44.0026 2618THAVES DAVID MC CULLUM 23-117-22-44-0027 3218THAVES ANDREW SHIRTS 23-117-22-44-0028 38 18TH AVES JODY M GRACK 23-1 17-22-44-1)l)43 35 18TH AVES RICHARD E SWANSON 23-117-22-44-0044 2918THAVES JAMES R HAGER 23-117-22-44-0045 231STHAVES JOHN P SLAlTERY 23-117-22-44-1)l)46 171STHAVES MICHAEL A OOBBE 23-117-22-44-0047 1I18THAVES ANDREW P RANSA V AGE 23-117-22-44..0034 1728 MAINSTREET KFC NATIONAL MGMTCO 23-117-22-44..0023 1800 MAINSTREET DAVID PETTIT PRELIMINARY ASSESSMENT ROLL 20.0.6 STREET AND UTILITY IMPROVEMENTS CITY OF HOPKINS, MN 8MI PROJECT NO. 116.21739 CITY PROJECT NO. 0.5-10. TOTAL ASSESSMENT RATE I" STREET SOUTH RATE FRONT FOOTAGE RATE 1st STREET SOUTH TO MAINSTREET 19th AVENUE SOUTH ASSESSMENT 53,0.11.50. 52,830..81 S4,517.25 $4,517.25 $4,517.25 $4,517.25 $5,11955 59,597.65 511,385.88 $50.,0.1439 ASSESSMENT RA IE CAP $6023 $60.23 ~ $60.23 ~ $60.23 $6023 $6023 $60.23 $9440. $9440. $94.40. $94.40. $9440. $9440. ~ $7321 $7321 $21]9 $21!2 521 !1 $21!2. lli11 $2119 $.R.!2. !Q:QQ. $0..00 EU! $732l $7321 $7321 5732] lli1.! $732\ EU.! $7321 FRONT FOOTAGE ~ " ~ ~ ~ ~ .!'. 15935 1890.4 830.39 ZIP 55343 55343 55343 55343 55343 lliQ 55343 ~ 55118 STATE MN MN MN MN MN MN ~ MN MN CITY HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS ~ W S1 PAUL W S1 PAUL OWNER NAMEI RONALD A PETERSON ROBYN M GARDNER JAMES E GOEMAN GLADYS M MATTHEISEN CAROL A LARSON THERESA L ALECKSON HENRY KASPAR OAKS OF MAINSTREET TOWNHOMES OAKS OF MAINSTREET TOWNHOMES PROPERTY ADDRESS 4019THAVES 44 19TH AVES 39 19TH AVES 27 19TH AVES 23191HAVES IS 19THAVES 1119THAVES ADDRESS UNASSIGNED ADDRESS UNASSIGNED PID# 23-117-22-44-0002 23-117-22-44.0003 23_117_22_44_0029 23-117-22-44-0030 23.117-22-44-0031 23-117-22-44-0032 23_117_22_44_0033 23-117-22-44-0139 23-117-22-44.0152 PRELIMINARY ASSESSMENT ROLL 2006 STREET AND UTILITY IMPROVEMENTS CITY OF HOPKINS, MN BMI PROJECT NO. T16.21739 CITY PROJECT NO. 05-10 7th AVENUE SOUTH - MAINSTREET TO EXCELSIOR BLVD ASSESSMENT I ASSESSMENT RATE $1,589.25 $1,589.25 $1,589.25 $1,589.25 $1,949.48 51,695.20 51,695.20 51,695.20 $1,695.20 $1,695.20 $1,695.20 $1,589.89 520,067.57 ~ ~ ~ 19 19 19 19 19 19 19 19 19 $21 $2] $2\ $21 $21 $21 ~ $21. $2!. El $21 $21. FRONT FOOTAGE 75 75 75 :2 92 80 80 80 80 80 80 7503 94703 ZIP 55343 55343 55343 55343 55343 55343 55343 55343 55343 55343 55318 55343 STATE MN MN MN MN MN MN MN MN MN MN MN MN CITY HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS HOPKINS CHASKA HOPKINS OWNERNAMEl MANUEL SOTELO MICHAEL R STONE BETH A BOLSTAD ANDREW 0 BOHACH R A STODOLA MELVIN P SCHLIEP SHELLY A ROBERTSON JAMES H GELD LILLIAN H GILBERTSON SCOTI D BURT GARYEDUNN GAYLE J ROBBINS PROPERTY ADDRESS J417THAVES 20171HAVES 2617THAVES 32 17TH AVE S 38 17TH AVE S 102 17TH AVE S 108 17TH AVE S 1I417THAVES 120 17TH AVE S 126 17TH AVE S 13017THAVES 13617THAVES PID# 23-117-22-44-0038 23-117-22-44-0039 23-117-22-44-0040 23-117-22-44-0041 23-117-22-44-0042 23-117-22-44-0048 23-117-22-44-0049 23-117-22-44-0050 23-117-22-44-0051 23-117-22-44-0052 23-117-22-44-0053 23-117-22-44-0054 TOTAL I ASSESSMENT ASSESSMENT RATE CAP RATE ASSESSMENT $1,867.13 $.4,216.10 $4,216.10 S4,5I7.25 $14,097.00 $4,216.10 $4,216.10 $4,216.10 $3,914.95 $4,396.79 $7,528.75 $11,564.16 53,896.88 $3,896.88 $3,770.40 $84.,318.55 560.23 $60.23 $6023 56023 N/A $60.23 $60.23 $6023 $6023 56023 $60.23 $60.23 $6023 $6023 $60.23 $76.20 $76.20 $76.20 $7620 $7620 $76.20 $76.20 $76.20 $76.20 $7620 $76.20 $76.20 $7620 $76.20 $76.20 FRONT FOOTAGE l! 7~ ZQ. 1l 185 .!2. .!2. .!2. ~ 73 125 192 64.7 ~ 626 35089 ZIP 55343 55343 55343 55343 55331.6110 55343 55343 55345 55391-2738 ill<< 55343 55343 55343 55343 ill43 STATE MN MN MN MN MN MN !:!Ii MN MN MN MN MN MN MN MN CITY HOPKINS HOPKINS HOPKINS HOPKiNS EXCELSiOR HOPKINS HOPKINS MINNETONKA WAYZATA HOPKiNS HOPKINS HOPKiNS HOPKINS HOPKiNS HOPKiNS OWNERNAMEI GILBERT TWEED PAUL B KUYPER JAMES G ROMPORTL JEFFREY T DULAC TUTTLE HOPKINS HOLDING LLC RANDY S KIENITZ BARBARA E FARBER DONALD E OLSEN STEVE B GROTIING DEREK MANN MARILYN A JOHNSON HOPKlNS HOUSING AUTHORITY & DONALD G MUEHLBERG SALLY K THRONE DAVID LEE WYATf PRELIMINARY ASSESSMENT ROLL 2006 STREET AND UTILITY IMPROVEMENTS CITY OF HOPKINS. MN BM! PROJECT NO. T16.21739 CITY PROJECT NO. 05-10 20th AVENUE SOUTH - NORTH OF EXCELSIOR BLVD PID# PROPERTY ADDRESS 23-117~2244.()01l 14S20THAVES 23-1]7-2244-0012 137 20TH AVE S 23-117-2244-0013 113120THAVES 23-117-22-44-0014 10920TH AVE S 23-117-2244-0016 III SHADYOAKRD 23-1]7-2244-0076 11520THAVES 23-] 17-22-44.0077 1121 20TH AVES 23-117-22-44-0078 12320THAVES 23-117.22-44'()079 122-124 20TH AVE S 23-117.22-44-0080 128 20TH AVE S 23-117.22-44-0081 140 20TH AVE S 23-117-2244-0083 29-107 20TH A VI:: S 23-117-22-44-0084 10420THAVES 23-117.22-44-0085 102 20TH AVES 23-117-22-44-0086 40 20TH AVE S 02/02/2006 13:26 FAX 9528908065 BOLTON & MENK ., Hopkins (CH ) AGREEMENT FOR PROFESSIONAL SERVICES 2006 STREET AND UTILITY IMPROVEMENTS FINAL DES [GN, CONSTRUCTION OBSERVATION, ADMINISTRATION AND STAKlNG CITY OF HOPKlNS, MINNESOTA This Agreement, made this 2nd day ofFebmary, 2006, by and between City of Hopkins, 10lO I" Street South, Hopkins, J.l1N 55343, hereinafter referred to as CLIENT, and BOLTON & MENK, INC., 12224 Nicollet Avenue, Bumsville, MN 55337, hereinafter referred to as CONSULTANT. WITNESS, wher,:as the CLIENT requires professional services in conjunction with Final Design, Construction Obs'~rvation, Administration and Staking for the City of Hopkins' 2005 Street and Utility Improvements and whereas the CONSULTANT agrees to furnish the various professional services required by the CUENT. NOW, TIIEREFORE, in consideration of the mutual covenants and promises between the parties hereto, it is agreed: SECTION I - CONSULTANT'S SERVICES A. The CONSULTANT agrees to perform the various Basic Services in connection with the proposed project a!: described in Exhibit 1. B. Upon mutual agreement of the parties hereto, Additional Services may be authorized as described in Exhibit I or as described in Paragraph N.B. City of Hopkins Tl6.21739 Page I oflO February 2, 2006 02/02/2006 13:27 FAX 9528908065 BOLTON & MENK ~ HopkIns (CH ) SECTION ll- TIIE CLIENT'S RESPONSffiILITIES A. The CLIENT shall promptly compensate the CONSULTANT in accordance with Section III of this Agreement. B. The CLIENT shall place any and all previously acquired information in its custody at the disposal of the CONSULTANT for its use. Such infonnation shall include but shall not be limited to boundary surveys, topographic surveys, preliminary sketch plan layouts, building plans, soil surveys, abstracts, deed descriptions, tile maps and layouts, aerial photos, utility agreements, environmental reviews, and zoning limitations. The CONSULTANT may rely upon the accuracy and sufficiency of all such information in perfonning services unless otherwise instructed, in writing, by the CLIENT. C. The CLIENT will guarantee access to and make all provisions for entry upon both public and private portions of the project and pertinent adjoining properties. D. The CLIENT will give prompt notice to the CONSULTANT whenever the CLIENT observes or otherwise becomes aware of any defect in the proposed project. E. The CLIENT shall designate a liaison person to act as the CLIENT'S representative with respect to services to be rendered under this Agreement. Said representative shall have the authority to transmit instructions, receive instructions, receive infonnation, interpret and define the CLIENT'S policies with respect to the project and CONSULTANT'S services. F. The CLIiENT shall provide such legal, accounting, independent cost estimating and insurance counseling services as may be required for completion of the consultant services described in this agreement. G. The CLllINT will obtain any and all regulatory permits required for the proper and legal execution of the projel:t. H. The CLIENT will hire, when requested by the CONSULTANT, an independent test company to perform laboratory and material testing services, and soil investigation that can be justified for the proper dl~sign and construction ofthe project. The CONSULTANT shall assist the CLIENT in selecting a testing company. Payment for testing services shall be made directly to the testing company by the CLIENT and is not a part of this Agreement. City of Hopkins T16.21739 Page 2 of 10 February 2, 2006 02/02/2006 13:27 FAX.952B90B065 BOLTON & MENK ~ Hopkins (CH ) ~ SECTION ill - COMPENSATION FOR SERVICES A. FEES. I. The CLIENT will compensate the CONSULTANT in accordance with the following schedule offees for the time actually spent in performance of Agreement services. SCHEDULE OF FEES Principal EngineerlSurveyor ........... .................. ............$130-1601H0ur Associate EngineerlSurveyor ..... ..... .......................... ......$85-13 O/Hour Project/Design Engineer .................................................$55-11 5IHour Licensed Surveyor ..........................................................$70-110IHour Project Surveyor. ......... ........... ..... ....... ............... ............. ..$50-85IHour Senior Technician ...........................................................$55-115/Hour Technician ...... ........... ........., .............. ............. ............. .....$40-851H0ur Clerical...... ...... .............. ........... ....................... .............. ...$30- 751H0ur GPS/Rohotic Survey Equipment.......................................$50-70IHour A.utoCAD/Computer Time...............................................No Charge (tlliee Supplies ..................................................................No Charge F'hoto CopyingIReproduetion ..........................................No Charge F'ield Supplies/Survey Stakes & Equipment...................No Charge l\lileage ..............................................................................No Charge Charges lire based on hours spent at hourly rates in effect for the individuals performing the work. The hour Iy rates for Principals, Senior Associates, Associates and members of the staff vary according to skill and experience. The Schedule of Fees shall apply for the period through December 31, 2006. These rates may be adjusted annually thereafter to account for changed labor costs, infl ation or changed overhead conditions. These rates include labor, general business and other normal and customary expenses associated with operating a professional business. Unless otherwise agreed, the above rates include vehicle and persconal expenses, mileage, telephone, survey stakes and routine expendable supplies; and no separate "harges will be made for these activities and materials. Expenses beyond the agreed scope of ,;ervices and non-routine expenses, such as large quantities of prints, extra report copies, out-sourced graphics and photographic reproductions, document recording fees, outside professio:lal and technical assistance and other items of this general nature, will be invoiced out separatel:l. Rates and charges do not include sales tax, if applicable. When it is possible to accurately define the scope of the project and the engineering services to be performed, a lump sum may be agreed upon for total compensation. City of Hopkins T16.21739 Page 3 of! 0 February 2, 2006 02/02/2006 13:28 FAX 9528908065 BOLTON & MENK ., Hopkins (CH ) 141005 2. Total estimated costs for the services itemized under Section I.A (Basic Fee) are $116,830.00. Itemization afthis cost is as shawn in the attached DETAILED WORK PLAN and PROJECT FEES tabi:es. 3. In additiO:B to. the faregaing, CONSULTANT shall be reimbursed at cost plus an overhead fee (nat-to-exceed 10%) far the fallawing Direct Expenses when incurred in the performance afthe wark. a. Client approved outside prafessional and technical services. b. Cutside reproduction and repro graphic charges. c. Other acceptable costs far such additional items and services as may be required by the CLIENT to fulfill the terms afthis Agreement. 4. Addition!ll services as autlined in Sectian I.B will VllI)' depending upan praject conditions and will be billed ,)n an haurly basis at the rate described in Section m.A.l. B. The paymentta the CONSULTANT will be made by the CLIENT upon billing at intervals nat mare aften than manthlyat the herein rates. City of Hapkins T16.21739 Page 4 of 10 February 2, 2006 02/02/2006 13:28 FAX 9528908065 BOLTON & MENK ., Hopkins (CH ) 141006 SECTION IV - GENERAL A. STANDARD OF CARE Professional servi<:es provided under this Agreement win be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the Consultant's profession currently practicing under similar conditions. No warranty, express or implied, is made. B. CHANGE IN PROJECT SCOPE. In the event the CLIENT changes or is required to change the scope of the project from that described in Section I andlor the applicable addendum, and such changes require Additional Services by the CONSULTANT, the CONSULTANT shan be entitled to additional compensation at the applicable hourly rates. The CONSULTANT shall give notice to the CLIENT of any Additional Services, prior to furnishing such additional services, The CLIENT may request an estimate of additional cost from the CONSULTANT, and the CONSULTANT shaIl furnish such, prior to authorizing the changed scope of work. C. LIMITATIONOFLIABIUTY. CONSULTANT lIhan indemnify, defend, and hold harmless CLIENT and its officials, agents and employees from any loss, claim, liability, and expense (including reason,able attorneys' fees and expenses of litigation) arising from, or based in the whole, or in any part, on any negligence act or omission by CONSULTANT'S employees, agents, or subconsultants. In no event shall CLIENT be liable to CONSULTANT for consequential, incidental, indirect, special, or punitive damages. CLIENT shan indemnify, defend, and hold hannless CONSULTANT and its employees from any loss, claim, liability, 8I1d expense (including reasonable attorneys' fees and expenses of litigation) arising from, or based in the whole, or in any part, on any negligence act or omission by CLIENT'S employees, agents, or consultants. In no event shan CONSULTANT be liable to CLIENT for consequential, incidental, indirect, special, or punitive damages. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the CLIENT or the CONSULTANT. The CONSULTANT'S services under this Agreement are being performed solely for the CLIENT'S benefit, and no other entity shall have any claim against the CONSULTANT because of this Agreement or the performance or nonperformance of services hereunder. The CLIENT agrees to include a provision in all contracts with contractors and other entities involved in this p)'oject to cany out the intent of the paragraph. City of Hopkins T16.21739 Page 5 of! 0 February 2, 2006 02/02/2006 13:29 FAX 9528908065 BOLTON & MENK ., Hopkins (CH ) ~007 D. CONSTRUCll0N SERVICES. It is agreed that th.~ CONSULTANT and its representatives shall not be responsible for the means, methods, techniques, schedules or procedures of construction selected by the contractor or the safety precautions or programs incident to the work of the contractor. E. INSURANCE. The CONSULTANT agrees to maintain, at the CONSULTANTS expense, statUtory worker's compensation covlll'age. The CONSULTANT also agrees to maintain such general liability insurance for claims arising for bodily injury, death or property damage which may arise from the negligent performance by the CONSULTANT or its employees of its day-te-day general business activities (such as automobile use) and exclusive of the performance of thl> professional services described in this Agreement. F. REUSE OF DOCUMENTS. Drawings and Spe~ifications and all other documents (including electronic and digital versions of any documents) prepared or furnished by CONSULTANT pursuant to this AGREEMENT are instruments of service in respect to the Project and CONSULTANT shall retain an ownership interest therein. Upon payment of all feef' owed to the CONSULTANT, the CLIENT shall acquire an ownership interest in all identified deliverables, including Plans and Specifications, for any reasonable use relative to the Project and the general oJl'~rations of the CLIENT. CLIENT may make and disseminate copies for information and reference in connection with the use and maintenance of the Project by the CLIENT. However, such documents are not intended or represented to be suitable for reuse by CLIENT or others on extensions of the Project or on allY other project and any reuse other than that specifically intended by this AGREEMENT will be at CLIENTS sole risk and without liability or legal exposure to CONSULTANT. G. OPINIONS OR ESTIMATES OF CONSTRUCTION COST. Where provided by the CONSULTANT as part of Exhibit I or otherwise, opinions or estimates of construction cost will generally be based upon public construction cost information. Since the CONSULTANT has no control over the cost oflabor, materials, competitive bidding process, weather conditions and oth.lI' factors affecting the cost of construction, all cost estimates are opinions for general information of the CLIENT and the CONSULTANT does not warrant or guarantee the accuracy of construction cost opinions or estimates. The CLIENT acknowledges that costs for project financing shall be based upon con;:racted construction costs with appropriate contingencies, City of Hopkins T16.21739 Page 6 of 10 February 2, 2006 02/02/2006 13:29 FAX 9528908065 BOLTON & MENK .. Hopkins (CH ) 141008 H. USE OF ELECTRONICIDIGITAL DATA Because ofthe potcmtial instability of electronic/digital data and susceptibility to unauthorized changes, copies of documents that may be relied upon by CLIENT are limited to the printed copies (also known as hard copies) that are signed or s,:aled by CONSULTANT. Except for electronicldigital data which is specifically identified as a project deliverable by this AGREEMENT or except as otherwise explicitly provided in this AGREEMENT, all electronicldigital data developed by the CONSULTANT as part of the PROJECT is acknowledged to be an internal working document for the CONSULTANT'S purposes solely and any such information provided to the CLIENT shall be on an "AS IS" basis strictly for the convenience of the CLIENT without any warTlnties of any kind. As such, the CLIENT is advised and acknowledges that use of such information may require substantial modification and independent verification by the CLIENT (or its designees). Provision of electronic/digital data, whether required by this Agreement or provided as a convenience to the Client, does not include any license of software or other systems necessary to read, use or reproduce the infoJ'mation. It is the responsibility of the CLIENT to verity compatibility with its system and long-term stability of media. CLIENT shall indemnity and hold harmless CONSULTANT and its Subcon- suItants from all claims; damages, losses, and expenses, including attorneys' fees arising out of or resulting from third party use or any adaptation or distribution of electronicldigital data provided under this AGREEMENT, unless such third party use and adaptation or distribution is explicitly authorized by this AGREEMENT. I. PAYMENTS. If CLIENT fails to make any payment due CONSULTANT for services and expenses within thirty days after date of the CONSULTANT'S invoice, a service charge of one and one-half percent (1.5%) per month or the maximum rate permitted by law, whichever is less, will be charged on any unpaid balance. In addition after givin.g seven days' written notice to CLIENT, CONSULTANT may, without waiving any claim or right against the CLIENT and without incurring liability whatsoever to the CLIENT, suspend services and withhold project deliverables due under this Agreement until CONSULTANT has been paid in full all amounts due for services, expenses and charges. J. TERMINATION. This Agreement m.1Y be terminated by either party for any reason or for convenience by either party upon seven (7) days written notice. In the event of termination, the CLIENT shall be obligated to the CONSULTANT for payment of amounts due and owing including payment for services performed or furnished to the date and time of termination, computed in accordance with Section III of this Agreement. City of Hopkins T16.21739 Page 7 of! 0 February 2, 2006 02/02/2006 13:30 FAX 9528908065 BOLTON & MENK ., Hopk1ns (CH ) ~009 K. CONTINGENT FEE. The CONSULTANT warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT to solicit or secure this Contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift or any other consideration, contingent upon or resulting from award or making ofthis Agreement. L. NON-DISCRIMINATION. The provisions of ,my applicable law or ordinance relating to civil rights and discrimination shall be considered part of this Agreement as if fully set forth herein. The CONSULTANT is an Equal Opportunity Employer and it is the policy the CONSULTANT that all employees, pemons seeking employment, subcontractors, subconsultants and vendors are treated without regard to their race, religion, sex, color, national origin, disability, age, sexual orientation, marital status, public assistance status or any other characteristic protected by federal, state or local law. M. CONTROLLlNG LAW This Agreement is to be governed by the law of the State of Minnesota. N. DISPUTE RE~:OLUTION CLIENT and COl\"SUL T ANT agree to negotiate all disputes between them in good faith for a period 000 days from the date .)f notice of dispute prior to proceeding to fonnal dispute resolution or exercising their rights under law. Any 1:laims or disputes unresolved after good faith negotiations shall first be submitted to mediation by Minnesota District Court Rule 114 Roster. Disputes not resolved by mediation shall then be submitted to arbitration in accordance with provisions of the Construction Industry Arbitration Rules of the American Arbitration Association. CONSULTANT and the CLIENT agree to require an equivalent dispute resolution process governing all contractors, sub-contractors, suppliers, consultants, and fabricators concerned with this proj eet. O. SURVIVAL All obligations, representations and provisions made in or given in Section IV of this Agreement will survive the completion of all services of the CONSULTANT under this Agreement or the tennination of this Agreement for any reason. City of Hopkins T16.21739 Page 8 of 10 February 2, 2006 02/02/2006 13:30 FAX 9528908065 BOLTON & MENK ~ Hopkins (CH ) 141010 P. SEVERABILITY Any provision or part ofthe Agreement held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONSULTANT, who agree that the Agreement shall be refonned to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. Q. PERIOD OF AGREEMENT This agreement will remain in effect for the longer period of two years or such other explicitly identified completion period, after which time the Agreement may be extended upon mutual agreement of both parties. City of Hopkins T16.21739 Page 9 of 10 February 2, 2006 02/02/2006 13:30 FAX 9528908065 BOLTON & MENK ~ Hopkins (CH ) 141011 SECTION V - SIGNATURES THIS INSTRUMENT embodies the whole agreement of the parties, there being no promises, tenns, conditions or obligation refelTing to the subject matter other than contained herein. This Agreement may only be amended, supplemented, modified or canceled by a duly executed written instrument signed by both parties. IN WIlNESS WHEREOF, the parties hereto have caused this Agreement to be executed in their behalf. CLIENT: CIT{ OF HOPKINS CONSULTANT: BOLTON & MENl{. INC. Mark D. Kasma, BMI Office Manager Marcus A. Thomas, Associate Engineer Date Date City of Hopkins Tl6.21739 Page 10 of 10 February 2, 2006 02/02/2006 13:31 FAX 9528908065 BOLTON & MENK ~ Hopkins (CH ) 141012 EXHIBIT I 2006 STREET AND UTILITY IMPROVEMENTS FINAL DESIGN, CONSTRUCTION OBSERVATION, ADMINISTRATION & STAKING CITY OF HOPKINS, MINNESOTA A. BASIC SERVICES In accordance with the City of Hopkins' Preliminary Engineering Report, Bolton & Menk, Inc. has been reqwlsted to complete final design, bidding assistance, construction staking, construction observation and construction administration services for the City's 2006 Street and Utility Improvement~,. The project area includes: · 18th Avenue South, from Mainstreet to the cul de sac · 19th Avenue South, from Mainstreet to the cui de sac . 20th Avenue South, north of Excelsior Boulevard . 1.t Street South, from 17th Avenue South to 19th Avenue South Detailed tasks associated with the work are itemized in the attached Detailed Work Plan and are described as follows: Task 1: Final DesiWl Final design for the 2006 Street and Utility Improvements will be completed based on the Preliminary Engineering Report completed by Bolton & Menk, Inc. in December 200S. Detailed construction plans will be prepared in CAD, illustrating plan and profile views of the street reconstruction and utility improvements. Cross sections will be shown for reconstructed streets at a maximum of SO' spacing. Typical sections detailing roadway cross-slopes will be designed in lieu of profile~; and cross-sections for reconstructed road corridors that preserve the existing curblines. Required construction details and tabulations will be completed. Special Provisions, construction c.)81 estimates, and an assessment roll will also be prepared. Final plans and specifications will be completed in compliance with the City of Hopkins' Engineering Guidelines. Final plans will be submitted for review and comment by private utility owners. Pennit applications will be completed as noted in the Preliminary Engineering Report. The project will be advertised, bids will be taken, and recommendation will be made to accept or reject bids. Meetings included during final design include one (I) City Staff meetings for design review and two (2) City Council meetings for final plan presentation and an assessment hearing. Task 2: Construction Services Construction Staking Construction staking indicating cuts to the line and grade of the proposed utilities will be performed at intervals of no more than 100 feet. Curb stakes will be set along the reconstructed roadways at intervals of no more than 50 feet. Construction Observation and Administration Full time construction observation is proposed for this project. Administration duties include a pre-constructic,n meeting, required project meetings, review of shop drawings and preparation of pay estimates. Observation and administration services will be completed on an hourly basis. City of Hopkins T16.21739 February 2, 2006 02/02/2006 13:31 FAX 9528908065 BOLTON & MENK ., Hopkins (CH ) 141013 The projected fee estimate is based upon a 12-week construction schedule. Estimated weekly time spent for observation and administration is SOhrs/wk and IOhrs/wk, respectively. Record Drawi~ Record drawings detailing the completed improvements as recorded by the construction observer and the City of Hopkins' contractor will be completed and furnished to the City in hard copy and electronic fon:nat. . B. ADDITIONAL SERVICES Consulting selvices petformed other than those authorized under Section I.A. shall be considered not part of the Contract Services and may be authorized by the CLIENT as additional services, Additional Selvices consist of those services which are not generally considered to be Contract Services; or el:ceed the requirements of the Contract Services; or are not definable prior to the commencement ofthe project; or vary depending on the technique, procedures or schedule ofthe project contl'lwtor. Additional services may consist of the following: I. All other services not specifically identified in Section A. City of Hopkins Tl6.21739 February 2, 2006 ~ o '" "- o '" "- '" o o ". .- '" '" .- :i2 ... '" en '" CD '" o CD o ". en DETAILED WORK PLAN ESl1MA TED PERSON-HOURS 2006 STREET & UTILITY IMPROVEMENTS: FINAL DESIGN & CONSTRUCTION CITY OF HOPKINS, MINNESOTA r_ Clerical Survey Crew Construction Observer Engineering Technician Project Engineef Project Manager FINAL DESIGN & CON!>'TRUCTION CITY OF HOPKINS. MINNESOTA 2006 STREET & lJllLITY IMPROVEMENTS. BOLTON & MENK. INC. Work Task Description FINAL DESIGN '" o t:3 o Z !lO l::i ~ 34 170 50 60 70 16 68 12 8 16 504 20 4 8 10 80 20 10 10 20 70 20 40 40 10 30 10 4 8 252 4 20 10 10 10 2 20 2 4 8 '" Utility Engineering and Design Roadway Engineering and Design Private Utmty Coordination Construclion Quantities: and Cost Estimate: Construction Specifications Permit Applications Bidding Assistance Final Assessment Roll PrePllfatiOll CityStaffMeering,(1 meeting) em' CounCIl Mee," '2 meerin: CLIENT: PROJECT. CONSULTANT: Tas~o. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 " '" o '0 '" .- =' 01 ~ n '" 600 120 140 84 944 32 o 120 120 o 600 40 640 130 20 40 60 120 4 124 SUBTOTAL HOURS: TASK SOhrslweck) :cq 10 liD/week CONSTRUCTION SERVICES Constructicn Observation ( ] 2 weeks@ Construction Administration il2 weeks ConstruclionStakinj Record Drawinl 2.0 2,1 2.2 2,3 2,4 1448 o 32 120 640 1911 o 252 214 SUBTOTAL HOURS: TASK 2; TOTAL HOURS IE;l o .- ... o '" .... o '" .... '" o o 0) >" "" "" '" .." > ... CO en '" 00 CO o 00 o 0) en PROJECT FEES 2006 STREET & UTILITY IMPROVEMENTS: FINAL DESIGN & CONSTRUCTION CITY OF HOPKINS. MINNESOTA 21212006 CITY OF HOPKINS, MINNESafA 2006 STREET & UTILITY IMPROVEMENTS: BOLTON ~MEN1<, INC. CLIENT; PROJECT: CONSULTANT: TQtals Clerical Survey Crew Construction Obsel'Ver Engineering Technician Project Enginoor Project Manager FINAL DESIGN & CONSTRUCTION tl:l o ~ o Z ll" E:i ~ S2 620.00 $12 950.00 $3.950.00 $4.75000 $5 150.00 $1 180.00 $5490.00 S960.00 $i20.00 $1,440,00 539.210.001 $55.00 ~ $O.OOi $0.001 ~ ~1.100.00 illQ:QQ. $~ ~O.OO ~ ~ ~1~760.00 $IJO.OO ~ !Q:QQ. ~ $0.00 SO.OO' ~ ~ ~ SO.OO $(),OO 50.00 $70.00 !2:QQ. ~ ~ 50.001 ~ ~ !Q1!Q. SO.oo ~ ~ $0.00 $70.00 ~ 55,600.00 ~ !Q;QQ. $700.00 $0.00 $0.00 SO.OOI S9~100.00 $1.400,00 S700.00 $75.00 ~ $,5.250.00 Sl,5OO.oo1 S3.oo0,OO 53.000,00 ~ $2..250.00 ~ 5300.00 S6oo.oo1 g'8I900.00 5/05.00 ~ $2,100.00 SI,OSO.OOI $1.050.00 $1,050.00 $21O.00i S2,100.00 ~ $420.00 ~ $9,450.00 AVERAGE RATE: FINAL DESIGN Utili1\! Enltin~ril\~ and Desi~1\ ROlldway Enancerinll: and Desi~ Ptivm: Utility Coordination Construction Quantities and Cost Eslimates Construction SpedfiC81l.Olls PermttAptllications Bidding Assistance Final Assessment Roll Preparation City SlaffMeet1nlt ( I meetinl.!) Citv Council Medingt211leetin~s)_ SUBTOTAL FEES: l'ASK TASK !9. II g g !j. 1.5 ~ 1,7 ,! ~ .10 ~ 0= o '" '" ... .. '" ~ n 0= $42 000.00 $12600.00 517000.00 S6,~O.OO $0.00' 50.001 ~ $0,00 ~ ~ 600.00 $42,000.00 $(),OO ~ SO.OO $1.400.00 52.800.00 50,001 ~ ~ $000 ~ S12,600.00 ~ 5420,00 CONSTRUCTION SERVICES Consb'UcTlon Observation (12 weeks (iQ 50 hrsIweek) Construction Administration (12 weels@ 10 hrsIweek Construction Slakin~ Record Dra",inJ.$ ~ 2.1 2.2 2.3 2.4 577.620.001 5116,830.00 50.00 SI,76ii:iiii S15 ~ 515,600.00 SIS,600.00 ~ S2.800.00 544,800.00 $44,800.00 $4.200.00 SI3,.300.00 50.00 SI8,90ii:iiii 513,020.00 522,470.00 SUBTOTAL FEES: TASK Z TOTAL~'EES I!!l c >" " CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO. 2006-010 RESOLUTION ORDERING PUBLIC HEARING, 2006 STREET IMPROVEMENT PROJECT, PROJECT NO, 05-10 WHEREAS, a resolution of the City Council adopted the 3'd day of January 2006 fixed a date for a Council Hearing on the proposed street improvements to 18th, 19th, and 20th A venues South and 1 st Street South including concrete curb and gutter installation and storm sewer improvements and all necessary appurtenances, and WHEREAS, the City Council deems it appropriate and expedient to make such improvements, and WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held thereon on the 7th day of February 2006 ,at which all persons desiring to be heard were given an opportunity to be heard thereon. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Hopkins, Minnesota: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed in the Council Resolution adopted the 3'd day of January 2006. The total estimated project cost is $837,825. 3. Bolton and Menk, Inc. is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the City Council of the City of Hopkins this 7th day of February 2006. Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 2006-011 DECLARING THE OFFICIAL INTENT OF THE CITY OF HOPKINS TO REIMBURSE CERTAIN EXPENDITURES FROM GENERAL OBLIGATION IMPROVEMENT BOND PROCEEDS TO BE ISSUED BY THE CITY OF HOPKINS WHEREAS, the Internal Revenue Service has issued Treas. Reg. #1,150-2 providing that proceeds of tax-exempt bonds used to reimburse prior expenditures shall not be deemed spent unless certain requirements are met; and WHEREAS, the City expects to incur certain expenditures, which may be financed temporarily from sources other than bonds, and reimbursed from the bond proceeds; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HOPKINS, MINNESOTA (THE CITY) AS FOLLLOWS: 1. The City intends to incur expenditures for the project described in Council Report 2006-022, for City Project 05-10 (the "Project"), and intends to reimburse itself for such expenditures from the bond proceeds to be issued by the City in the maximum principal amount described in the "project". 2. The City Manager is authorized to designate additions to Project 05-10 in circumstances where time is of the essence, and any such designation shall be reported to the Council at the earliest practicable date and shall be filed with the official books and records of the City. 3. This resolution is intended to constitute a declaration of official intent for the purpose of Treas. Reg. #1.150-2 and any successor law, regulation, ruling or amendment pertaining thereto. Adopted by the City Council of the City of Hopkins, Minnesota, this ih day of February 2006. By Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk