CR 96-134 CO - Residential Utility/Street ImprovementsAugust 16, 1996 Proposed Action. Overview. Supporting Information. • Change Order No. APPROVE CHANGE ORDER #2 1996 RESIDENTIAL UTILITY AND STREET IMPROVEMENTS Staff recommends adoption of the following motion: Move that Council authorize Change Order No. 2 as it relates to 1996 Residential Utility and Street Improvements, Project #95 -17. During construction, unsuitable organic soils were encountered under the south sections of 7 and 8 Avenues South. In order to provide adequate pavement subgrade strength, this material had to be removed and replaced with compacted select granular material, geotextile fabric and draintile. The subsurface soils report used during design to specify pavement design requirements stated that the south segments of 7 and 8 Avenues contained unsuitable soils. The report didn't further specify the extent of bad soils. However, the consultant didn't include additional subgrade excavation or back into the design of either avenue. This expected change order was reported to Council on July 16. At that time, staff estimated the total cost at $30,000 based on the extent of work necessary on 8 Avenue South. Unfortunately, the poor soils extended approximately 200 feet further up 7 Avenue. The amount of Change Order No. 2 is $47,821.21. Primary Issues to Consider. • What is the justification for a change order? • What are the costs? • Staff recommendation Steven J. Stadler, Public Works Director Council Report 96 -134 Council Report 96 -134 Page 2 Analysis of Issues • What is the justification for the change order? Correction of the unsuitable subgrade was necessary to ensure adequate subgrade strength and pavement life. • What are the costs? The total amount of the change order is $47,821.21. The cost of the additional work is based on extending the bid unit prices for subgrade . excavation, granular backfill and geotextile fabric. The costs are fair and reasonable. • Staff recommendation Staff concurs with MSA Consulting Engineers recommendation to approve change order no. 2 and recommends Council authorize change order no. 2. CHANGE ORDER (Instructions on reverse side) No. 7 PROJECT: 1996 Residential Street Improvements DATE OF ISSUANCE: July 3, 1996 OWNER: City of Hopkins (Name, 1010 First Street South OWNER's Project No. 95 -16 Sr 95 -17 Address) Hopkins, MN 55343 ENGINEER: MSA, Consulting Engineers CONTRACTOR:Hardrives, Inc. 1326 Energy Park Drive 14475 Quiram Drive St. Paul, MN 55108 -5202 Rogers, MN 55374 ENGINEER s Project No. 15R- 006 -30 CONTRACT FOR:1996 Residential Street Improve. You are directed to make the following changes in the Contract Documents. Description: See attached schedule. Purpose of Change Order: Extras associated 8th Street South. 7th Avenue South and 8th Avenue South Improvements Attachments: (List documents supporting change) Change Order No. 2 CHANGE IN CONTRACT PRICE: Original Contract Price $ 581.379 80 CHANGE IN CONTRACT TIME: Original Contract Time At _gust 5 1996 days or data Previous Change Orders No._1_ to No._1_ $ 6 718.80 Net change from previous Change Orders 0 days Contract Price prior to this Change Order $ 588.048 60 Contract Time Prior to this Change Order August 5 1996 days or dam Net Increase (D..,..,..,,,.) of this Change Order $ 47,87171 Net Increase (Decrease) of this Change Order -0- days Contract Price with all approved Change Orders $ 635 869.81 Contract Time with all approved Change Orders An pnct 5 19.6 e da, ae dam ' RECOMMENDED: APPROS u: _ ��.W. APPROVED: by JAI/ i lic -- iini%A By KROf by K i MSA, Consulting Enginee City of Hopkins fi' ardrives, Inc. EJCDC No. 1910-8 -8 (1983 Edition) • n: \clerical\ 158 \wordpert\co#2 - 158.006 158-006 -30 &\clerical \158 \excei\CONI-006.XiS CHANGE ORDER NO. 2 1996 RESIDENTIAL STREET IMPROVEMENTS CITY OF HOPKINS, MINNESOTA 158-006 -30 SCHFnu1.R 15 0 8T11 STRFFT STORM SEWER EXTRAS 1 EXTRA WORK & MAT. ASSOC./ STORM SEWER LF 294 T SCHEDULE 15.0 8TH STREET STORM SEWER EXTRAS -TOTAL SCHF.DITI.F. 16.0 8111 AVFMTR SANITARY SEWER RXTRAS 1 6' PVC SERVICE PIPE LF 58 7.70 T SCHEDULE 16.0 8T11 AVENUE SANITARY SEWER EXTRAS -TOTAL SCHB3MII.E 17.0 8TH AVENITR STREET CORRECTION EXTRAS 1 SUBGRADE EXCAVATION CY 496 7.65 3,794.40 2 SELECT GRANULAR BORROW (CV) CY 496 12.00 5,952.00 3 GEOTEXTILE FABRIC, TYPE V SY 612 1.00 612.00 4 PERFORATED 4" DIAMETER DRAINTILE LE 210 7.00 1.470.00 5 CONC. CURB & GUTTER. B6I8 LF 208 6.40 1331.20 T SCHEDULE 17.0 8TH AVENUE STREET CORRECTION EXTRAS -TOTAL 13.159.60 SCHRTHIT F 18.0 7TH AVFMTV S1'RFFT CORRECTION EXTRAS 1 SUBGRADE EXCAVATION CY 1391.4 7.65 10.644.21 2 SELECT GRANULAR BORROW (CV) CY 1391.4 12.00 16.696.80 3 GEOTEXTILE FABRIC, TYPE V SY 1534.4 _1.00 1534.40 4 PERFORATED 4" DIAN ETER DRAINTILE LF 578 7.00 4,046 T SCHEDULE 18.0 7TH AVENUE STREET CORRECTION EXTRAS -TOTAL 32.921.41 SUMMARY SCHEDULE 15.0 8TH STREET STORM SEWER EXTRAS -TOTAL SCHEDULE 16.0 8TH AVENUE SANITARY SEWER EXTRAS -TOTAL SCHEDULE 17.0 8TH AVENUE STREET CORRECTION EXTRAS -TOTAL SCHEDULE 18.0 7TH AVENUE STREET CORRECTION EXTRAS -TOTAL TOTAL AMOUNT OF CHANGE ORDER NO. 2 PAGE 1 4.40 1.293.60 1.293.60 446.60 446.60 1.293.60 446.60 13,159.60 32,921.41 47 158 - 006-30