CR 96-159 CO - Project 96-06September 25, 1996 Proposed Action. APPROVE CHANGE ORDER ALLEY PROJECT #96 -06 Staff recommends adoption of the following motion: Move that Council authorize payment of change order compensating adjacent property owners for drainage improvements as they relate to Alley Project #96 -06. Overview. This alley reconstruction project is located between 12 and 13 Avenues South and and 2n Streets South. The project was field surveyed and designed by MSA Consulting Engineers and construction staked and inspected by City staff. The project design presented a challenge as the existing parking area grades to the west were relatively low and flat and the grades to the east were relatively high. Therefore, the engineer had to balance the need to lower the alley to improve drainage from the west with the need to maintain acceptable slopes to the higher areas to the east. The final design, for the most part, met the challenges described above. However, • there was very little margin for error in alley edge elevations. For a variety of reasons the alley was constructed slightly higher than design. As a result, asphalt work on the private parking areas to the west was necessary to ensure proper drainage to the alley. The work in the private parking areas was negotiated with the owners and the owners were compensated for partial costs of parking lot reconstruction. Primary Issues to Consider. o What are the project costs and the amounts of the change order compensating the property owners? o Why did the alley get constructed higher than it was designed? o How can we prevent this from happening again? Supporting Information. o Analysis of Issues o L tter Agreeme is Steven 1 Stadler, Public Works Director Council Report 96 -159 • Analysis of Issues What are the project costs and the amounts of the change order compensating the property owners? The construction cost of the alley is approximately $33,000.00 Final payments haven't been made and staff has proposed a few bid item quantity adjustments which the contractor hasn't responded to yet. The change order amounts are $2,951.00 for work by Thomas and Dennis Roof at 135 13 Avenue South and $2,200.00 for work by Cecil and Isabel Kloss at 115 13 Avenue South. These additional costs should be partially offset by approximately $2,000 in savings to the City contract by not having to restore the parking areas at the edges of the alley. o Why did the alley get constructed higher than design? There were several contributing factors. However, the one factor which had the largest influence was the decision to split the responsibilities of initial surveying and design from construction staking and inspection. As mentioned, MSA Consulting Engineers performed project surveying and design while City staff did the construction staking and inspection. This was done to save engineering services fees. Unfortunately, in this case, it led to miscommunication between designer and inspectors and an improperly constructed alley. This could have been avoided if MSA had been responsible for design, construction staking and inspection. o How can we prevent this from happening again? In the future, City staff will be responsible for design and inspection or a consultant will be hired to perform both services. The alley reconstruction projects are fast -paced and it's important to maintain clear, timely communication between designer, inspector and contractor. This is best accomplished if duties are not split. Thomas Roof Dennis Roof 1260 Wildwood Place Chaska, MN 55318 c: \file\hopkins \roof C I T Y O F H O P K I N S September 5, 1996 Gentlemen: This will confirm receipt of your September 4, 1996 letter outlining a proposal to resolve the surface drainage affecting your apartment garages on 13th Avenue South and the acceptance of the City of Hopkins to your proposal. This will eliminate any involvement by the City in warranting or guaranteeing the workmanship by the contractor and the expected result in addressing the anticipated drainage problem. According to the attached, the City will pay your contractor, Jones & Son Asphalt Paving, the sum of $2,951.00 upon completion and acceptance by you of the work the contractor performs. I want to express my appreciation for the courteous and gentlemanly way you have resolved this matter. Accepted for and in behalf of the City of Hopkiips Steve Stadler Public Works Director 1010 First Street South Hopkins, Minnesota 55343 Phone: 612-935-8474 Fax: 612 An Equal Opportunity Employer PROJECT NO. 96 - aft. FOLDER NO. y INITIALS J 75 Thomas Roof and Dennis Roof September 5, 1996 Page 2 • Enclosure c: \file \hopkins \roof Accepted for Thomas Roof and in behalf of Dennis Roof Thomas Roof • 61/140t fred-ot frel tat 12e/n4144. R /3S 3 /iv& S, 0-7 88:53 t COUNTY MAKET-SHRKOPEE • 612 935 1834 JONES & SON BLACKTOPPING Box 105, Shakopee, Minnesota 55379 Telephone (612) 445-6211 e 5-cde 9- )4- f 167°S( /Or Share-C- 744.), Si 77 NO. 879 GI01 •.• • :••• !, • • . . • Cecil an Kloss 32 11th Avenue South J Hopkins, MN 55343 c: \file \hopkins \roof C I T Y O F H O P K I N S September 5, 1996 Dear Mr. and Mrs. Kloss: This will confirm receipt of your September 4, 1996 letter outlining a proposal to resolve the surface drainage affecting your apartment garages on 13th Avenue South and the acceptance of the City of Hopkins to your proposal. The contractor will be working solely for you, the property owners. Accordingly, this will eliminate any involvement by the City in warranting or guaranteeing the workmanship by the contractor. According to the attached, the City will pay your contractor, Jones & Son Asphalt Paving, the sum of $2,200.00 upon completion and acceptance by you of the work the contractor performs. I want to express my appreciation for the courteous way you have resolved this matter. Accepted for and in behalf of the City of Hopkir;s Steve Stadler Public Works Director 1010 First Street South Hopkins, Minnesota 55343 Phone: 612-935-8474 Fax: 612-935-1834 An Equal Opportunity Employer PROJECT NO 96 -o& FOLDER NO. INITIALS J 7 - Cecil and September 5, 1996 Page 2 Enclosure c : \file \hopkins \roof Accepted for Cecil Kloss and � lo/�s_s, 1 Kloss a Kloss A 2 to Septa 10, 1996 Cecil & Isabel Kloss 32 -11th Ave. South Condo #311 Hopkins, MN. 55343 Jones & -Son Asphalt Paving has completed the portion of the Parking Lot as described in the Sept. 4th, 1996 letter to the City of Hopkins and accepted by a letter to Cecil & Isabel Kloss stated wherein "The City will pay your contractor, Jones & Son Asphalt Paving the sum of $2,200.00 dollars upon completion and acceptance by you of the work the contractor performs." The work has been completed to our satisfaction amd we have given the contractor a check for $2,200.00. Received for labor and material the sum of $2.200.00 Jones & Son Asphalt Paving 445 -6211 Sept 10, 1996 City Of Hopkins Re; A check from'the City of Hopkins to Cecil & Isabel Kloss in the amount of $2,200.00 dollars. $2.200.00 is the amount payable to Jones & Son Asphalt Paving from the City of Hopkins for labor and material to complete a agreed upon portion of the parking lot at 115 -13th Ave. South. The work has been completed to our satisfaction and enclosed is a leis waiver from Jones & San Asphalt Paving stating he has received $2,200 from Cecil & Isabel Kloss. Sincerely, C 1 J Aa a.,E f ! L / . 04-1 X 311 ���� 1/, . fl3Y2