CR 96-179 Change Order - Parking Lot 500 Expansion• • October 31, 1996 Proposed Action Overview Primary Issues to consider Suuportina Information • Jhfnes Gessele Engineering Superintendent APPROVE CHANGE ORDER PARKING LOT 500 EXPANSION Council Report No. 96 -179 Staff recommends adoption of the following motion: Move that Council approve Change Order No. 1 as it relates to the expansion of Parking Lot 500. Proiect 95 -09. Work on the parking lot expansion at the former Dome site is now substantially complete. Staff found it practical to make a landscaping change in the field. This revision needs to be approved in a change order to the contract. o Justification Upon a second review of landscaping plans with a view to practicality and future maintenance, staff decided that placement of sod in the boulevard area should be stricken from the contract. Staff decided placement of landscape rock was more practical and eliminated mowing as a maintenance factor. Unforeseen was the issue of adjusting a manhole to grade to avoid creating a trip hazard. o Costs The additional cost for the rock and underlying fabric is $1,190.00. The cost of the manhole adjustment is $225.00. The cost of boulevard sod to be eliminated from the contract is $120.00. The net increase to the contract will be $1,295.00 o Recommendation Staff recommends approval of Change Order No. 1. o Change Order No. 1 o Pay item detail from Estimate No. 1 CHANGE ORDER (Instructions on reverse side) No. 1 PROJECT: Municipal Parking Lot No. 500 OWNER: City of Hopkins (Name, 1010 First Street South Address) Hopkins, MN 55343 CONTRACTOR:DMJ Corporation 2392 Pioneer Trail Hamel, MN 55340 CONTRACT FOR: Municipal Parking Lot No. 500 DATE OF ISSUANCE: October 3, 1996 OWNER's Project No 158- 003 -30 ENGINEER MSA, Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108 -5202 ENGINEER s Project No. 158- 003 -30 You are directed to make the following changes in the Contract Documents. Description: See attached schedule. Purpose of Change Order: Work scope change requested by the City. Attachments: (List documents supporting change) Change Order No. 1 CHANGE IN CONTRACT PRICE: Original Contract Price $ 40 096.10 CHANGE IN CONTRACT TIME: Original Contract Time October 11. 1990 days or date Previous Change Orders No - -- to No. - -- Net change from previous Change Orders -0- $ 0.00 days Contract Price prior to this Change Order $ 40 096.10 Contract Time Prior to this Change Order October 11. 1996 days or date Net Increase (D..,.....) of this Change Order $ 1.415.00 Net Increase (Decrease) of this Change Order - 0 - days Contract Price with all approved Change Orders $- 41. 511.10 Contract Time with all approved Change Orders October 11 1996 days or date RECOMMENDED: APPROVED: APPROVED: By by by MSA, Consulting Engineers City of Hopkins DMJ Corporation EJCDC No. 1910 -8 -B (1983 Edition) n: \clerical\ 158 \co#1 - 158.003 158- 003 -30 CHANGE ORDER NO. 1 MUNICIPAL PARKING LOT NO. 500 CITY OF HOPKINS, MI 158- 003 -30 SCHEDULE 2.0 CHANGE ORDER NO, 1 1 LANDSCAPE ROCK & GEO. MATERIAL SF 700 2 ADJUST EXISTING MANHOLE EA 1 T SCHEDULE 2.0 CHANGE ORDER NO. 1- -TOTAL n: \ clerical \ 158 \CO #1- 003.XLS PAGE 1 1.70 225.00 1,190.00 225.00 415.00 158- 003 -30 • FROM: SEPTEMBER 1, 1996 TO: SEPTEMBER 30, 1996 COMPLETION DATE ORIGINAL: OCTOBER 11, 1996 REVISED: PARTIAL PAYMENT ESTIMATE NO. 1 CONTRACTOR: DMI CORPORATION ADDRESS: 2392 PIONEER TRAIL, HAMEL, MN 55340 OWNER: CITY OF HOPKINS, MINNESOTA PROJECT: MUNICIPAL PARKING LOT NO. 500 (158-003 -30) AMOUNT OF CONTRACT: ORIGINAL: $ 40,096.10 REVISED: $ 41,511.10 SCHF.DIB R 1 0 MIINJCIPAL PARKING LOT I MOBILIZATION IS 2 REMOVE CURB & GUTTER LF 3 REMOVE SIDEWALK SF 4 REMOVE SIDEWALK & INT CURB SF 5 COMMON EXCAVATION CY 6 B618 CONCRETE CURB & GUTTER LF 7 4' CONCRETE SIDEWALK SF 8 6' CONCRETE SIDEWALK SF 9 UNDERWALK SWALE WITH CASTING LS 10 PEDESTRIAN RAMP EA 11 CONCRETE VALLEY GUTTER SF 12 CI ASS 5 AGGREGATE BASE TN 13 TYPE 31, BASE COURSE MIXTURE TN 14 TYPE 41, BASE COURSE MIXTURE TN 15 PAVEMENT MARKING (HANDICAP PARKIN EA 16 4" WHITE PAVEMENT STRIPING LF 17 TREE HACKBERRY (2 -1/2" - 3', B & B) EA 18 SHRUBS POTENTTLLA (GOLDDROP) EA 19 ORNAMENTAL LIGHT EA 20 CONCRETE TESTING IS 21 SUBGRADE TESTING 1S 22 AGGREGATE TESTING IS 23 BITUMINOUS TESTING LS 24 SIGNING EA 25 LAWN & BOULEVARD SY T SCHEDULE 1.0 MUNICIPAL PARKING LOT - TOTAL 1 3,000.00 1.00 3,000.00 1.00 3,000.00 137 3.00 171.00 513.00 171.00 513.00 680 1.00 782.00 782.00 '782.00 782.00 1050 1.00 0.00 0.00 0.00 0.00 155 8.00 155.00 1,240.00 155.00 1,240.00 631 9.30 578.00 5,375.40 578.00 5,375.40 980 2.50 1,428.60 3,571.50 1,428.60 3,571,50 1110 3.00 765.50 2,296.50 765.50 2,296.50 1 1,911.00 0.00 0.00 0.00 0.00 2 150.00 2.00 300.00 2.00 300.00 124 6.00 93.00 558.00 93.00 558.00 520 8.65 500.00 4,325.00 500.00 4,325.00 105 39.00 90.50 3,529.50 90.50 3,529.50 105 39.00 70.50 2,749.50 70.50 2,749.50 1 15.00 0.00 0.00 0.00 0.00 524 0.20 0.00 0,00 0.00 0.00 3 220.00 3.00 660.00 3.00 660.00 12 22.00 12.00 264.00 12.00 264.00 1 3,500.00 1.00 3,500.00 1.00 3,500.00 I 230.00 0.00 0.00 0.00 0.00 1 270.00 0.00 0.00 0.00 0.00 1 280.00 0.00 0.00 0.00 0.00 1 820.00 0.00 0.00 0.00 0.00 2 80.00 0.00 0.00 0.00 0.00 40 3.00 0.00 000 0.00 0.00 32,664.40 32,664.40 $CHEDTR R 2 0 CHANGE ORDER NO.1 1 LANDSCAPE ROCK & GEO. MATERIAL SF 700 1.7 700.00 1,190.00 700.00 1,190.00 2 ADJUST EXISTING MANHOLE EA 1 225 1.00 225.00 1.00 225.00 T SCHEDULE 2.0 CHANGE ORDER NO. 1 -TOTAL n: \clerical\ 158\ 158003# I . XLS PAGE 1 1,415.00 1,415.00 158-003 -30