CR 96-193 Change Order #9 - Moline Plant RenovationProposed Action. Overview. November 21, 1996 Council Report 96 -193 APPROVE CHANGE ORDER #9 MOLINE PLANT RENOVATION Staff recommends adoption of the following motion: Move that Council authorize Change Order No. 9 as it relates to Moline Plant Renovation, Project No. 95 -05. The original contract didn't require the contractor to work with NSP regarding installation of new underground electrical service and pad - mounted transformer. This was to be handled by City staff with payment directly to NSP. It became increasingly difficult for City staff to work with NSP in order to schedule /coordinate the work and keep the project on schedule. As a result, the responsibility for working with NSP was transferred to the general contractor and his electrical subcontractor, Twin City Electric. The contractor paid NSP for the work and this change order allows us to reimburse him The change order includes only $50.00 in general contractor markup. Staff recommendation. S aff recommends Council authorize change order no. 9. Supporting Information Change Order No. 9 Steven J. Stadler, Director of Public Works m ange Order AIA Document G701 - Electronic Format PROJECT: (name, address) Hopkins Well House No. 1 913 County Road No. 3 Hopkins, Minnesota 55343 TO CONTRACTOR: (name, address) M.C. Magney Construction, Inc. 18889 Eastwood Drive Excelsior, Minnesota 55331 1 he Contract is changed as follows: Change well pre -Tube piping and valve. Add electrical transformer and underground feeder to project at City's request. (1111 Magney cost attached.) Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum)( )was Net change by previously authorized Change Orders The (Contract Sum)( ) prior to this Change Order was The (Contract Sum)( ) will be ( increased )(decreased)(unchanged) by this Change Order in the amount of The new (Contract Sum)(r cl R r n ) including this Change Order will be OWNER [X ] ARCHITECT [X ] CONTRACTOR [X FIELD [ ] OTHER [ CHANGE ORDER NUMBER: 9 DATE: October 29, 1996 ARCHITECT'S PROJECT NO: 14152.05 CONTRACT DATE: May 30, 1996 CONTRACT FOR: General Services $631,900.00 $6,977.00 $$638,877.00 $6,182.00 $645,059.00 THIS DOCUMENT HAS IMPORTANT LEGAL. CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. AIA DOCUMENT G701 - CHANGE ORDER - 19117 EDITION - AIA - COPYRIGHT 1987 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006-5292, WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced under license number 297001939 and tan be reproduced without violation until 2/27/97. Electronic Document Service G701 -1987 1 • The Contract Time will be ( increased )(decreased)(unchanged) by zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is December 11, 1996 NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. ARCHITECT Address Rieke Carroll Muller Associates, Inc. 10901 Red Circle Drive Minn a ',fit sota 55343 BY ` •!! —\ DATE CONTRACTOR Address M.C. Magney Construction, Inc. 18889 Eastwood Drive Excelsior M ingesota 5 31 BY DATE t d b1\ml• OWNER Address City of Hopkins 1010 1st Street Hopkins, Minnesota 55343 -7573 BY DATE AIA DOCUMENT G701 - CHANGE ORDER - 1987 EDITION - AIA - COPYRIGHT 1967 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006 -3292. WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document wm electronically produced under license number 297001939 and can be reproduced without violation until 2/27/97. Electronic Document Service G701 -1987 2 M.C. MAGNEY CONSTRUCTION INC. 18889 Eastwood Drive - Excelsior, MN 55331 (612)474 -1674 Fax 474 -1679 October 25, 1996 Mr. John L. Monnens, AIA Rieke, Carroll, Muller Associates, Inc. 10901 Red Circle Drive Minnetonka, Minnesota 55343 0 11 rej (����(��pp 23 199•'3 n C4ancii h'i%b fiswiatt f ItL, Box 130 Hopkins, Minn- 25343 Re: Hopkins Well House No. 1 Proposal Request No. 4 Dear John, We are offering the following price quotation to change pipe and valve size on the pre -lube line from 1/2" to 1". Materials: Pipe - price increase for 1/2" to 1" $ 28.00 Ball Valve - price increase 12.00 Solenoid Valve - price increase 46.00 Subtotal 86.00 Markup 13.00 Total $ 99.00 We will hold all further action on this item for your direction and approval. If you have any questions, please contact me. Sincerely, Mark Magney, PE President M.C. MAGNEY CONSTRUCTION, INC. 18889 Eastwood Drive - Excelsior, MN 55331 (612)474 -1674 Fax 474 -1679 October 25, 1996 Mr. John L. Monnens, AIA Rieke, Carroll, Muller Associates, Inc. 10901 Red Circle Drive Minnetonka, Minnesota 55343 Re: Hopkins Well House # 1 Dear John, Please find attached the Underground Service Form from NSP for the new electric service into the site. Twin City Electric has paid NSP for this service and has in turn requested payment from us. We are requesting that you include the following cost for this new electric service in a change order: Subcontractor. Twin City Electric - NSP Service $ 6033.00 Subtotal 6,033.00 Markup 50 00 Total $ 6,083.00 If you have any questions, please contact me. Sincerely, Mark Magney, PE President UNDERGROUND SERVICE FORM Foam 17.mss p.w) In consideration of NORTHERN STATES POWER COMPANY, hereinafter called "NSP', extending its facilities t make 480/277 volt, 3 phase, 4 wire underground service available to (customer) CITY OF HOPKINS at (service address) 918 EXCELSIOR AVE (city) HOPKINS the sum of SIX THOUSAND AND THIRTY THREE AND 00/100 Dollars ($ 6,033.00 will be paid to NSP by (otherthan above) TWIN CITY ELECTRIC Address {other than above) 10724 MORGAN AVE SO City BLMNGTN Zip 55431 in accordance with the following terms: CASH AND SIGNED CONTRACT PRIOR TO CONSTRUCTION Credit Approval 40 10/10/98 08:38 2Y812 881 5717 Receipt of the above amount hereby acknowledged on behalf of NSP by 1. The customer hereby grants NSP the right, privilege and easement to install, operate and maintain its underground facilities on Me property as described above and/or the approximate location as shown on the attached 'Exhibit A'. 2, The customer also agrees that, prior to NSP starting work: (a) the route of NSP's underground installation shag be accessible to NSP's equipment (b) all obstructions shall be removed from such route at no cost or expense to NSP; (c) ground elevation along the route shall not be above or more than four (4) inches below the finished grade; and (d) the area under the transformer pad shall be compacted to at least 2000 lbs. /sq. ft. 3 TWIN CITY ELECTRIC agrees to pay all additional installation costs incurred by NSP because of (a) soil conditions that impair the installation of underground facilities, such as rock formations, etc., and (b) sidewalks, curbing, black top, paving. sod or other landscaping and obstructions along the cable route. NSP will backfill trench with existing soil Restoration of construction area on customer property is the responsibility of the customer. 4. NSP is not responsible for any customer -owned underground facilities not exposed at the time service is installed. 5 The underground installation may be subject to a winter construction charge if it is installed between' October 1 and April 15. TWIN CITY ELECTRIC agrees to•pay this charge if NW determines winter conditions exist when the underground facilities are installed. NSP will waive the winter construction charge if prior to October 1st the customer is ready to accept electrical service, has executed this form and has notified NSP in writing that the requirements of Paragraph 2 hereof have been fulfilled. 8_ The underground facilities installed by NSP, shall be the property of NSP and arty payments made by the customer, or their contractor, shall not entitle the customer to any ownership interest or rights therein. 7. The customer agrees to pay the cost of relocating any portion of said underground facilities made to accommodate the. customers needs or required because of altering the grade, additions to structures, installing patios, decks or gardens or any other condition which makes maintenance of the company's facilities impractical. 8. Customer must provide the following minimum clearance around the transformer. front, 10 feet; sides and back, 2 feet. EXCEPTION: side racing building must have 30' clearance. These clearances must be at the same grade as the transformers. If screening is to be used, the area in front of the transformer must be lett open or a hinged door, easily operable by one person, must be provided. The area must be accessible 24 hours a day. $ Excess U.G. Distribution Lateral (Primary Cable) $ Excess U.G. Service Lateral $ U.G. Service Lateral (Secondary Service From Utility Pole) $ U.R.D. Installation Including U.G. Service Lateral 5 U.G. Distribution Lateral (Primary Cable) Trench Ft. "Customer agrees to pay monthly Residential Service Underground rate of the type of installation indicated by a double asterisk. ❑ Applicable ® Not Applicable Dated this day of 19 Dated this /6 day of c2c.47 Js-n 1g 'fy • Customer CITY OF HOPKiNS By By L. HIGGINS 10/8/96 Div EDINA NSP Proj/Serv. No. EXCE HPK AAG Maint. $ T. C. ELECTRIC CO. f3001 $ Winter Const Charge (See paragraph 5) $ Specific Service Locajion or Route $ Replace Overhead Line With Underground Line $ Temporary Service $ Other (explain) ./ tea 1e# 606058 KVA Contnetgr TWIN CITY ELECT f Oper. $ Transf, $ = Total $