Loading...
CR 06-035 Accept Bids & Award Contract Excel Blvd Streetscape Imp, Proj 04-07 CITY OF - March 15, 2006 HOPKINS Council Report 2006-035 ACCEPT BIDS AND AWARD CONTRACT EXCELSIOR BOULEVARD STREETSCAPE IMPROVEMENTS, PHASE III PROJECT 04-07 Proposed Action. Staff recommends adoption of the following motion: Move that Council adopt Resolution 2006- 020. Resolution for Award of Bid. Excelsior Blvd Streetscape Improvements. Phase III. Proiect 04- 07. Overview. On February 7, 2006 City Council approved final design plans and ordered bids for this project. The project was advertised, a pre-bid conference was held on March 7 and bids were publicly opened at 10:00 a.m. on Tuesday, March 14. Three bids were received with the low bid of $1,651,355.07 submitted by Pember Companies, Inc. from Menomonie, Wisconsin - see attached bid report. The second low bid of $1,999,893.95 was submitted by Park Construction Company. The final architect's estimate of construction cost was $1,761,984.45. Staff is now requesting approval to award the contract to the lowest responsible bidder, Pember Companies, Inc. in the amount of $1,651,355.07. Pember has completed many large street projects, including major streetscape work - their references have been checked with no problems noted. Additionally, they have chosen quality subcontractors. Primary Issues to Consider. · Project funding: Funding will come from the city's PIR and MSA funds with reimbursement of an estimated $340,000 from Hennepin County. The estimated total project cost is now: $1,651,355.07 (construction) + $92,649.00 (Xcel Energy) + $135,800 (design & construction services) = $1,879,804.07 . Project schedule: The construction will run from ola April 17 , 2006 to October 1, 2006. Supportina Information. . Pember Companies, Inc. references . Bid tabulation and architect estimate. . Res lution 20 -020 Steven J. Stadler, Public Works Director Financial Impact: $ 1.879.804.07 Budgeted: Y/N ~ Source: MSA, PIR elated Documents (CIP, ERP, etc.): Aooroved 2006 CIP oroiect otes: Mar. 15. 2006 4:06PM PEMBER EXCAVATiNG ~o. 8297 P. 2 -~. -~.d1J~ ~ Pemb r Companies, Inc. ~h N4449 - 469th Street. Menomonie, Wisconsin 54751 Phno<.715-23$.O)16 0Iwdln8. Ubbty1ftst3Daboll. CoaldGuaa. SllicwaBt fax: 7IS..2)~ References: Woodbury - Cottage Grove Drive 51.349,805.00 City of Woodbury 8301 Valley Cr.rek Road Woodbury. MN 55125 PH: 651-714-3500 Hastings - Dakota Hills and Zweber Lane $2,556.497.00 City of Hastings Nick Eggers 101 411> Street East Hastings, MN 55033 PH: 651-480.2350 Red Wing- Central Avenue, College Avenue City of Red Wing Ron Roscnthal 419 Bush Street Red Wing, MN 55066 PH: 651-385-3623 $2.440.690.00 Pine Island - 2003 Street Assessment City of Pine Island Mark Vahlsing 250 Main Street Pine Island, MN 55963 PH: 507-356-459l 5797,280.00 Eau Claire - Phoenix Park S3,651,464.00 City of Eau Claire 203 S. Farwell Street Eau Claire, WI 54702 PH: 715.839-4934 Sub.Contractors 1. Killmer Electric - Electrical 2. Peterson &. Sons - Irrigation/Landscaping 3. Glacial Ridge - Concrete Pavers 4. FPI Paving Contractors - Asphalt 5. United Rentals - T ranic Control If any more information is needed, please call Jon Johnson, 715-235-0316 Equal Oppornmity Employer . OWNER CITY OF HOPKINS - PUBLIC WORKS 11100 Excelsior Blvd Hopkins, MN 55343-3435 Bi"D'lAd - AS PER.UM #2 PROJECT: HOPKINS EXCELSIOR BLVD STREETSCAPE IMPROVEMENTS -PHASE PROJECT # 2004-07 HOPKINS, MN PRIME CONSULTANT: Hoisington Koegler Group Inc. 123 North 3rd Street - Suite 100 Minneapolis, MN 55401-1659 THOMAS AND SONS CONSTRUCTION UNIT PRICE UNIT TOTAL $ 161.000.00 LS $ 161,000.00 $ 0.75 SY $ 4,762.50 $ 0.75 SF $ 4,849.50 $ 1.65 SY $ 9,957.75 $ 75.00 CAL $ 1,125.00 $ 12.50 LF $ 17,462.50 $ 4.00 LF $ 1,800.00 $ 15.00 SY $ 16,425.00 $ 6.50 SY $ 32,272.50 $ 5.00 SY $ 7,340.00 $ 5.00 SY $ 7,800.00 $ 500.00 EA $ 500.00 $ 100.00 EA $ 600.00 $ 5.00 LF $ 1.950.00 $ 7,000.00 EACH $ 7,000.00 $ 781.00 EACH $ 2,343.00 $ 35.00 CY $ 13,300.00 $ 25.00 CY $ 500.00 $ 30.00 CY $ 7,800.00 $ 28.00 CY $ 42,6t6.00 $ 19,123.50 EA $ 19.123.50 $ 370.00 EA $ 370.00 $ 50.00 CY $ 5,500.00 $ 75.00 SY $ 36,000.00 $ 15.00 SY $ 3,600.00 $ 175.00 TON $ 7,525.00 $ 200.00 TON $ 4,000.00 $ 200.00 TON $ 8,600.00 $ 4.00 GAL $ 160.00 $ 25.00 LF $ 23,250.00 $ 155,000.00 LS $ 155,000.00 $ 100.00 LF $ 2,000.00 $ 500.00 EA $ 3,000.00 $ 500.00 EA $ 500.00 $ 2,200.00 EA $ 2,200.00 $ 3,600.00 EA $ 3,600.00 $ 600.00 EA $ 600.00 $ 475.00 EA $ 2,850.00 $ 3,800.00 EA $ 3,800.00 $ 3.67 SF $ 188,359.08 $ 4.70 SF $ 23,772.60 $ 6.00 SF $ 11,508.00 $ 7.20 SF $ 8,352.00 $ 5.00 SF $ 4,480.00 $ 16.85 LF $ 21,062.50 $ 28.95 LF $ 12,014.25 $ 23.90 LF $ 10,755.00 $ 71.00 SY $ 710.00 $ 445.00 EA $ 17.800.00 $ 96,500.00 LS $ 96,500.00 $ 21,000.00 LS $ 21,000.00 $ 500.00 EACH $ 500.00 $ 500.00 EACH $ 15,000.00 $ 700.00 EACH $ 25.200.00 $ 2.975.00 EACH $ 17,850.00 $ 250.00 LF $ 4,500.00 $ 20.00 LF $ 700.00 $ 3,000.00 EA $ 6,000.00 $ 3,000.00 EA $ 3,000.00 $ 4,000.00 EA $ 8,000.00 PAKK CONS I KUCTlON COP MANY UNIT PRICE UNIT TOTAL $ 110,141.00 LS $ 110,141.00 $ 5.70 SY $ 36,195.00 $ 0.72 SF $ 4.655.52 $ 3.40 SY $ 20,519.00 $ 60.00 CAL $ 900.00 $ 7.95 LF $ 11,106.15 $ 7.95 LF $ 3,577.50 $ 6.50 SY $ 7,117.50 $ 3.25 SY $ 16,136.25 $ 3.25 SY $ 4,771.00 $ 3.25 SY $ 5.070.00 $ 657.00 EA $ 657.00 $ 129.00 EA $ 774.00 $ 7.45 LF $ 2,905.50 $ 3,880.00 EACH $ 3,880.00 $ 727.00 EACH $ 2.181.00 $ 30.50 CY $ 11,590.00 $ 30.50 CY $ 610.00 $ 45.80 CY $ . 11,908.00 $ 45.10 CY $ 68.642.20 $ 15,100.00 EA $ 15,100.00 $ 901.00 EA $ 901.00 $ 49.40 CY $ 5,434.00 $ 78.80 SY $ 37,824.00 $ 6.65 SY $ 1,596.00 $ 91.10 TON $ 3,917.30 $ 96.30 TON $ 1,926.00 $ 91.10 TON $ 3,917.30 $ 5.10 GAL $ 204.00 $ 35.20 LF $ 32,736.00 $ 138,200.00 LS $ 138,200.00 $ 70.90 LF $ 1,418.00 $ 344.00 EA $ 2.064.00 $ 2,350.00 EA $ 2,350.00 $ 2,050.00 EA $ 2,050.00 $ 3,480.00 EA $ 3,480.00 $ 614.00 EA $ 614.00 $ 636.00 EA $ 3,816.00 $ 1,720.00 EA $ 1,720.00 $ 5.45 SF $ 279,715.80 $ 5.70 SF $ 28.830.60 $ 6.80 SF $ 13.042.40 $ 6.55 SF $ 7,598.00 $ 4.05 SF $ 3,628.80 $ 19.40 LF $ 24,250.00 $ 25.00 LF $ 10,375.00 $ 21.50 LF $ 9,675.00 $ 97.40 SY $ 974.00 $ 628.00 EA $ 25.120.00 $ 60,600.00 LS $ 60.600.00 $ 9,640.00 LS $ 9,640.00 $ 903.00 EACH $ 903.00 $ 643.00 EACH $ 19,290.00 $ 1,180.00 EACH $ 42,480.00 $ 2,770.00 EACH $ 16.620.00 $ 376.00 LF $ 6,768.00 $ 4.10 LF $ 143.50 $ 503.00 EA $ 1,006.00 $ 503.00 EA $ 503.00 $ 7,080.00 EA $ 14.160.00 PEMBER COMPANIES UNIT PRICE UNIT TOTAL $ 67,100.00 LS $ 67,100.00 $ 0.90 SY $ 5,715.00 $ 0.33 SF $ 2.133.78 $ 1.25 SY $ 7.543.75 $ 26.20 CAL $ 393.00 $ 5.30 LF $ 7,404.10 $ 5.30 LF $ 2,385.00 $ 6.50 SY $ 7,117.50 $ 2.85 SY $ 14,150.25 $ 2.20 SY $ 3,229.60 $ 2.55 SY $ 3.978.00 $ 308.00 EA $ 308.00 $ 119.00 EA $ 714.00 $ 10.10 LF $ 3,939.00 $ 2,510.00 EACH $ 2,510.00 $ 746.00 EACH $ 2,238.00 $ 18.40 CY $ 6,992.00 $ 46.30 CY $ 926.00 $ 21.70 CY $ 5,642.00 $ 38.70 CY $ 58,901.40 $ 18.300.00 EA $ 18.300.00 $ 353.00 EA $ 353.00 $ 41.10 CY $ 4.521.00 $ 65.50 SY $ 31,440.00 $ 6.85 SY $ 1,644.00 $ 132.00 TON $ 5,676.00 $ 98.80 TON $ 1,976.00 $ 132.00 TON $ 5,676.00 $ 5.25 GAL $ 210.00 $ 8.50 LF $ 7,905.00 $ 126,000.00 LS $ 126,000.00 $ 34.70 LF $ 694.00 $ 172.00 EA $ 1,032.00 $ 819.00 EA $ 819.00 $ 959.00 EA $ 959.00 $ 2.260.00 EA $ 2,260.00 $ 417.00 EA $ 417.00 $ 346.00 EA $ 2,076.00 $ 598.00 EA $ 598.00 $ 3.55 SF $ 182,200.20 $ 4.15 SF $ 20.990.70 $ 4.40 SF $ 8,439.20 $ 5.40 SF $ 6,264.00 $ 3.00 SF $ 2,688.00 $ 16.00 LF $ 20,000.00 $ 2350 LF $ 9,752.50 $ 17.90 LF $ 8,055.00 $ 47.80 SY $ 478.00 $ 150.00 EA $ 6.000.00 $ 34,200.00 LS $ 34,200.00 $ 9,090.00 LS $ 9,090.00 $ 915.00 EACH $ 915.00 $ 345.00 EACH $ 10,350.00 $ 409.00 EACH $ 14,724.00 $ 2.840.00 EACH $ 17,040.00 $ 225.00 LF $ 4,050.00 $ 15.80 LF $ 553.00 $ 1,760.00 EA $ 3.520.00 $ 1,730.00 EA $ 1,730.00 $ 1,910.00 EA $ 3,820.00 ENGiNttRfSTlMA 1'E TOTAL 130,000.00 3,175.00 1,616.50 3,017.50 1,500.00 3,492.50 1,125.00 7.884.00 24,825.00 7.340.00 7,800.00 500.00 1.800.00 195.00 1,000.00 1,500.00 6,460.00 340.00 .4.680.00 42.616.00 20,000.00 300.00 2,860.00 14,400.00 2,400.00 1,720.00 840.00 1,634.00 ----wo:oo 930.00 150,000.00 720.00 1,200.00 500.00 2,000.00 2,000.00 500.00 1,800.00 700.00 205.296.00 25.290.00 13,426.00 11,600.00 1,344.00 22.500.00 10.375.00 10,350.00 360.00 16,000.00 35,000.00 18,000.00 300.00 24,000.00 21,600.00 21.000.00 1,800.00 245.00 3.000.00 1,500.00 2,000.00 UNIT LS SY SF SY CAL IT IT SY SY SY SY EA EA IT EACH EACH CY CY CY CY """EA"' """EA"' CY SY SY TON TON TON GAL u: LS u: """EA"' """EA"' Ell Ell Ell Ell Ell SF SF SF SF SF LF LF LF SY EA LS LS EACH EACH EACH EACH IF IF Eli Eli Eli UNIT PRICE $~oo $ 0.50 $ 0.25 $ 0.50 $ 100.00 $ 2.50 $ 2.50 $ 7.20 $ 5.00 $ 5.00 $ 5.00 $ 500.00 $ 300.00 $ 0.50 $ 1,000.00 $ 500.00 $ 17.00 $ 17.00 $ 18.00 $ 28.00 $ 20,000.00 $ 300.00 $ 26.00 $ 30.00 $ 10.00 $ 40.00 $ 42.00 $ 38.00 $ 2.50 $ 1.00 $ 150,000.00 $ 36.00 $ 200.00 $ 500.00 $ 2,000.00 $ 2,000.00 $ 500.00 $ 300.00 $ 700.00 $ 4.00 $ 5.00 $ 7.00 $ 10.00 $ 1.50 $ 18.00 $ 25.00 $ 23.00 $ 36.00 $ 400.00 $ 35.000.00 $ 18,000.00 $" 300.00 $" 800.00 $" 600.00 $" 3,500.00 $" 100.00 $" -----yro $" 1,500.00 $" 1,500.00 $" 1,000.00 EST.QTY. ~ 6350.00 6466.00 6035.00 ~ 1397.00 450.00 1095.00 4965.00 1468.00 1560.00 ~ ----s:oo 390.00 ----uiO ~ 380.00 20.00 260.00 1522.00 -----,-:Qo ----uiO 110.00 480.00 240.00 43.00 20.00 ----.noD 4MO 930.00 ----uiO 20.00 ----s:oo ----uiO ----uiO ----uiO ~ ----s:oo ~ 51324.00 5058.00 1918.00 1160.00 896.00 1250.00 415.00 450.00 10.00 40.00 1:00 1:00 1:00 30.00 36.00 s:oo 18.00 35.00 2.00 1.00 2.00 UNIT LS SY SF SY CAL LF LF SY SY SY SY EA EA LF EACH EACH CY CY CY CY LS Ell CY $V $V TON TON TON GAL LF LS LF E"i\ E"i\ E"i\ E"i\ E"i\ E"i\ E"i\ SF SF SF SF SF LF LF LF SY EA LS LS EACH EACH EACH EACH IF IF Eli Eli Eli ITEM DESCRIPTION MOBILIZATION PREP TURF AREAS PH 1 REPLANTED MEDIAN REMOVAL PH 1 TURF BLVD REMOVAL TREE REMOVAL REMOVE CURB AND GUTTER REMOVE CURB AND GUTTER 2 REMOVE CONCRETE WALK REMOVE BITUMINOUS PAVEMENT REMOVE BITUMINOUS PAVEMENT 2 REMOVE BITUMINOUS PAVEMENT 3 REMOVE CATCHBASIN REMOVE CA TCHBASIN GRATE CASTING REMOVE PORTABLE CURB SALVAGE AND REINSTALL BUS SHELTER SALVAGE L1GHTPOLES COMMON EXCAVATION SUBGRADE EXCAVATION SELECT GRANULAR BORROW . SELECT TOPSOIL BORROW (CV) REFINISH SIGNAL POLES REFINISH SHOEBOX LIGHT POLES AGGREGATE BASE CLASS 5 BITUMINOUS PATCH SPECIAL MILL BITUMINOUS SURFACE (1.5') TYPE LV 4 WEARING COURSE MIXTURE (1.5' TYPE MV 4 WEARING COURSE MIXTURE (1.5 TYPE LV 3 NON WEARING COURSE MIXTURE (1.5 BITUMINOUS MATERIAL FOR TACK COAT 4' PERF PE PIPE DRAIN IRRIGATION SYSTEM PROVISION 12' RC PIPE SEWER DES 3006 CL V DRAIN PIPE ATTACHMENT TO CB CONNECT TO EXISTING STORM SEWER CONSTRUCT DRAINAGE STRUCTURE DESIGN SD-l CONSTRUCT DRAINAGE STRUCTURE DES 54-4020 CASTING ASSEMBLY R-3067 CASTING ASSEMBLY R-1642 (STORM SEWER) CASTING ASSEMBLY R-4999-HX 4' CONCRETE WALK SPECIAL 1 4' CONCRETE WALK SPECIAL 2 6' CONCRETE WALK SPECIAL 8' CONCRETE WALK 4' BITUMINOUS WALK CONCRETE CURB & GUTTER DESIGN B618 CONCRETE CURB & GUTTER DESIGN B624 - SPECIAL CONCRETE CURB & GUTTER DESIGN B612 - SPECIAL CONCRETE MEDIAN NOSE PEDESTRIAN CURB RAMP CITY SIGN ASSEMBL Y- 8TH AVE CITY SIGN MODIFICATION - 11 TH AVE METAL INFORMATION SIGN (L T AROOW/RT-THU ARROW) BOLLARD TYPE A BOLLARD TYPE B BANNER POLES NEWSTAND CORRAL LANDSCAPE EDGER BENCH TYPE A BENCH TYPE B FIRELANE GATE ITEM NUMBER 2021.501 2101.000 2101.000 2101.000 2101.000 2104.501 2104.501 2104.503 2104.503 2104.503 2104.505 2104.509 2104.509 2104.521 2104.000 2104.000 2105.501 2105.507 2105.507 2105.526 2565.000 2650.000 2211.503 2231.604 2232.501 2350.502 2350.501 2350.501 2357.502 2502.541 2502.600 2503.541 2503.602 2503.602 2506.502 2506.502 2506.516 2506.516 2506.516 2521.500 2521.500 2521.500 2521.500 2521.511 2531.501 2531.501 2531.501 2531.503 2531.602 2540.601 2540.601 2540.602 2540.602 2540.602 2540.602 2540.602 2540.603 2540.602 2540.602 2540.602 1 ;; 3" 4" 5 6" "7 8" 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 << 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 of pg BID TAB Addendum#2 CITY OF HOPKINS EXCELSIOR BLVD STREETSCAPE PH3 $ 27'000.~. $ 27,000.00 $ 3,500.00 $ 7,000.00 $ 3,500.00 $ 7,000.00 $ 900.00 EA $ 2,700.00 $ 1,500.00 EA $ 1,500.00 $ 800.00 EA $ 2,400.00 $ 7.00 SF $ 98,700.00 $ 3,341.00 EA $ 13,364.00 $ 5,247.00 EA $ 346,302.00 $ 2,200.00 EA $ 8,800.00 $ 2,250.00 EA $ 4,500.00 $ 2,119.00 EA $ 14,833.00 $ 2,155.00 EA $ 81,890.00 $ 6, t 40.00 EA $ 18,420.00 $ 22,500.00 LS $ 22,500.00 $ 1.82 LF $ 1,574.30 $ 1.10 LF $ 33.00 $ 1.10 LF $ 33.00 $ 5.15 SF $ 7,982.50 $ 805.00 EACH $ 4,025.00 $ 137.50 EACH $ 137.50 $ 137.50 EACH $ 137.50 $ 15.00 SF $ 25,500.00 $ 4.00 SY $ 12,048.00 $ _0.20 SF $ 534.00 .$-----315.00 TREE $ 4,410.00 $ 250.00 TREE $ 2,250.00 $ 250.00 TREE $ 500.00 $ 275.00 TREE $ 3,300.00 $ 350.00 TREE $ 51,100.00 $ 412.50 TREE $ 5,775.00 $ 275.00 TREE $ 3,300.00 $ 250.00 TREE $ 8,750.00 $ t2.1O EA $ 13,842.40 $ 11.00 PLT $ 11,396.00 $ 26.40 SHRUB $ 21,172.80 $ 28.60 SHRUB $ 1,372.80 $ 5.00 LF $ 2,500.00 $ 225.00 EA $ 5,625.00 $ 3.50 SY $ 37,086.00 $ 0.50 SF $ 7,500.00 $ 0.30 SF $ 22,564.80 $ 15,800.00 EA $ 15,800.00 $ 1,140.00 EA $ 2.280.00 $ 1,380.00 EA $ 2,760.00 $ 1,160.00 EA $ 3,480.00 $ 9,430.00 EA $ 9,430.00 $ 868.00 EA $ 2.604.00 $ 5.55 SF $ 78,255.00 $ 3,110.00 EA $ 12,440.00 $ 4,880.00 EA $ 322,080.00 $ 2,040.00 EA $ 8,160.00 $ 2,090.00 EA $ 4,180.00 $ 1,970.00 EA $ 13,790.00 $ 2,010.00 EA $ 76,380.00 $ 5,720.00 EA $ 17,160.00 $ 72,500.00 LS $ 72,500.00 $ 1.70 LF $ 1,470.50 $ 1.00 LF $ 30.00 $ 1.00 LF $ 30.00 $ 4.80 SF $ 7,440.00 $ 750.00 EACH $ 3,750.00 $ 128.00 EACH $ 128.00 $ 128.00 EACH $ 128.00 $ 12.00 SF $ 20,400.00 $ 3.05 SY $ 9,186.60 $ 0.10 SF $ 267.00 $ 292.00 TREE $ 4,088.00 $ 230.00 TREE $ 2,070.00 $ 230.00 TREE $ 460.00 $ 256.00 TREE $ 3,072.00 $ 323.00 TREE $ 47,158.00 $ 333.00 TREE $ 4,662.00 $ 256.00 TREE $ 3,072.00 $ 230.00 TREE $ 8,050.00 $ 11.30 EA $ 12,927.20 $ 10.20 PLT $ 10,567.20 $ 24.60 SHRUB $ 19,729.20 $ 26.60 SHRUB $ t .276.80 $ 3.05 LF $ 1,525.00 $ 0.01 EA $ 0.25 $ 2.25 SY $ 23,841.00 $ 0.12 SF $ 1,800.00 $ 0.18 SF $ 13,538.88 $ 21,000.00 EA $ 21,000.00 $ 2,380.00 EA $ 4,760.00 $ 2,350.00 EA $ 4,700.00 $ 616.00 EA $ 1,848.00 $ 5,420.00 EA $ 5,420.00 $ 873.00 EA $ 2.619.00 $ 6.10 SF $ 86.010.00 $ 3,190.00 EA $ 12,760.00 $ 5,010.00 EA $ 330,660.00 $ 2,090.00 EA $ 8,360.00 $ 2,150.00 EA $ 4,300.00 $ 2,020.00 EA $ 14,140.00 $ 2,060.00 EA $ 78,280.00 $ 5,870.00 EA $ 17.610.00 $ 20,600.00 LS $ 20,600.00 $ 1.75 LF $ 1,513.75 $ 1.05 LF $ 31.50 $ 1.05 LF $ 31.50 $ 4.90 SF $ 7,595.00 $ 769.00 EACH $ 3,845.00 $ 131.00 EACH $ 131.00 $ 131.00 EACH $ 131.00 $ 12.40 SF $ 21,080.00 $ 6.55 SY $ 19,728.60 $ 0.79 SF $ 2,109.30 $ 539.00 TREE $ 7,546.00 $ 309.00 TREE $ 2,781.00 $ 284.00 TREE $ 568.00 $ 295.00 TREE $ 3,540.00 $ 473.00 TREE $ 69,058.00 $ 637.00 TREE $ 8.918.00 $ 520.00 TREE $ 6,240.00 $ 444.00 TREE $ 15,540.00 $ 17.90 EA $ 20,477.60 $ 6.30 PLT $ 6,526.80 $ 31.50 SHRUB $ 25,263.00 $ 47.30 SHRUB $ 2,270.40 $ 2.10 LF $ 1,050.00 $ 105.00 EA $ 2,625.00 $ 2.45 SY $ 25,960.20 $ 0.07 SF $ 1,050.00 $ 0.09 SF $ 6,769.44 61 ,- 2540.CNIC SHELTER EA 1.00 $ 25,000.00 EA ~ 62 2540. CNIC TABLE TYPE A EA 2.00 $ 2.000.00 EA 00.00 63 2540.6 ICNIC TABLE TYPE B EA 2.00 $ 1,500.00 EA $ .000.00 64 2540.602 BIKE LOOP EA 3.00 $ 300.00 EA $ 900.00 65 2540.601 TRAIL KIOSK EA 1.00 $ 15,000.00 EA $ 15,000.00 66 2540.601 TRAIL SIGN POST EA 3.00 $ 800.00 EA $ 2,400.00 67 2540.618 CONCRETE PAVERS SF 14100.00 $ 7.50 SF $ 105,750.00 68 2545.511 POST STREET LIGHT-EXTRA EA 4.00 $ 3,500.00 EA $ 14,000.00 69 2545.511 POST STREET LIGHT EA 66.00 $ 5,400.00 EA $ 356,400.00 70 2545.511 INSTALL SHOEBOX STREET LIGHT EA 4.00 $ 2,500.00 EA $ 10,000.00 71 2545.511 ACCENT UPLlGHT-WASH SIGN EA 2.00 $ 500.00 EA $ 1,000.00 72 2545.511 ACCENT UPLlGHT - FLOOD COLUMN EA 7.00 $ 500.00 EA $ 3,500.00 73 2545.511 ACCENT UPLlGHT - FLOOD TREE EA 38.00 $ 500.00 EA $ 19,000.00 74 2545.541 SERVICE CABINET EA 3.00 $ 5,000.00 EA $ 15,000.00 75 2563.601 TRAFFIC CONTROL LS 1.00 $ 20,000.00 LS $ 20,000.00 76 2564.603 4' SOLID LINE WHITE-LATEX LF 865.00 $ 3.87 LF $ 3,347.55 77 2564.603 4' SOLID LINE WHITE-EPOXY LF 30.00 $ 2.00 LF $ 60.00 78 2564.603 4' DOUBLE SOLID LINE YELLOW PAINT LF 30.00 $ 3.50 LF $ 105.00 79 2564.618 ZEBRA CROSSWALK - WHITE EPOXY SF 1550.00 $ 3.87 SF $ 5,998.50 80 2565.602 NMC LOOP DETECTOR 6'X6' EACH 5.00 $ 1,000.00 EACH $ 5,000.00 81 2581.602 PAVEMENT MESSAGE (L T ARROW) EPOXY EACH 1.00 $ 100.00 EACH $ 100.00 82 2581.602 PAVEMENT MESSAGE (RT-THRU ARROW) EPOXY EACH 1.00 $ 120.00 EACH $ 120.00 83 2582.000 THERMOPLASTIC STRIPING SF 1700.00 $ 10.00 SF $ 17,000.00 84 2571.000 MULCH SY 3012.00 $ 0.25 SY $ 753.00 85 2571.000 WEED BARRIER SPECIAL SF 2670.00 $ 1.85 SF $ 4,939.50 86 2571.501 CONIFEROUS TREE 8' HT B&B TREE 14.00 $ 600.00 TREE $ 8,400.00 87 2571.501 CONIFEROUS TREE 6' HT B&B TREE 9.00 $ 400.00 TREE $ 3,600.00 88 2571.501 CONIFEROUS TREE 6' HT B&B TREE 2.00 $ 400.00 TREE $ 800.00 89 2571.501 CONIFEROUS TREE 5' HT B&B TREE 12.00 $ 300.00 TREE $ 3,600.00 90 2571.502 DECIDUOUS TREE 2.5' CAL B&B TREE 146.00 $ 350.00 TREE $ 51,100.00 91 2571.502 DECIDUOUS TREE 2.5' CAL B&B -BUR OAK TREE 14.00 $ 400.00 TREE $ 5,600.00 92 2571.502 DECIDUOUS TREE 1.5 CAL B&B- BUR OAK TREE 12.00 $ 350.00 TREE $ 4,200.00 93 2571.503 ORNAMENTAL TREE 6' HT B&B TREE 35.00 $ 250.00 TREE $ 8,750.00 94 2571.507 PERENNIAL 1 GAL CO NT EA 1144.00 $ 18.00 EA $ 20,592.00 95 2571.507 PERENNIAL 4' CONT PLT 1036.00 $ 10.00 PLT $ 10,360.00 96 2571.505 DECIDUOUS SHRUB NO 2 CO NT SHRUB 802.00 $ 40.00 SHRUB $ 32,080.00 97 2571.505 DECIDUOUS SHRUB NO 5 CO NT SHRUB 48.00 $ 50.00 SHRUB $ 2,400.00 98 2573.502 SILT FENCE, TYPE PREASSEMBLED LF 500.00 $ 3.50 LF $ 1,750.00 99 2573.530 INLET PROTECTION EA 25.00 $ 200.00 EA $ 5,000.00 100 2575.505 SODDING TYPE SALT RESISTANT SY 10596.00 $ 3.50 SY $ 37,086.00 101 2575.000 TURF ESTABLISHMENT - SEED SF 15000.00 $ 0.25 SF $ 3,750.00 102 2575.000 PRAIRIE ESTABLISHMENT - SEED SF 75216.00 $ 0.40 SF $ 30,086.40 2,031,504.28 2,045,004.28 pg 2 of 2 BID TAB Addendum#2 ,999,893.95 ,999,893.95 1,656,183.07 1,651,355.07 1$ 1,761,984.451 BID LINE 3A BID TOTAL CITY OF HOPKINS EXCELSIOR BLVD STREETSCAPE PH3 03 CITY OF HOPKINS HENNEPIN COUNTY MINNESOTA RESOLUTION NO. 2006-020 RESOLUTION FOR AWARD OF CONTRACT EXCELSIOR BOULEVARD STREETSCAPE IMPROVEMENTS, PHASE III CITY PROJECT 04-07 Whereas, the City solicited bids for the construction of various streetscape improvements along the Excelsior Boulevard between Shady Oak Road and Highway 169, and; Whereas, three (3) bids were received with Pember Companies, Inc. being the lowest cost, responsive bid, NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, that Pember Companies, Inc. with a low bid of $1 ,651 ,355.07 is the lowest responsible bid and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of Hopkins, Minnesota, this 21st day of March 2006. By Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk