CR 91-135 Landfill Project Change Order -- June 12, 1991 \ I Y 0 G /.' ~ .y Co o P K \ ~ Council Report: 91-135 LANDFILL PROJECT CHANGE ORDER Proposed Action. staff recommends adoption of the following motion: Move that council authorize Chanqe Order No. 3 as it concerns the 7th street S. Landfill Gas Remediation, proiect 90-18. Overview. Associated with the landfill project was considerable dewatering of the trenches. The Metro Waste Control Commission has required the dewatering discharge to be placed in the sanitary sewer system. The MWCC has further required this discharge volume to be measured and included in the monthly Special Discharge Report to be submitted to the MWCC. Primary Issues to Consider. o What are the specifics of Change Order No.3? See the attached supplement from RCM and Associates for description of change and justification. ~ Supportinq Information. o Change Order No. 3 di 0.. I {lA.'V(.(;'~ :ldC.kJ_(....j~-- James Gessele Engineering Superintendent e , CHANGE ORDER NO. 3 . PROJECT: 7th Street South Landfill Gas Remediation Hopkins, Minnesota Date: Mav 30. 199] OWNER: City of Hopkins Owner's Project No.: 90-18 TO: (Contractor): Ames Construction, Inc. 14420 County Road 5 Burnsville, MN 55337 Engineer's Project No.: 12079 Contract Date: April I, 1991 You are hereby directed to make the following change in the Contract Documents. Description of Change: Refer to the attached Supplement to this Change Order (12 pages). . CHANGE IN CONTRACT PRICE Original Bid Price Net change from previous Change Orders No..L through No.l Contract Price prior to this Change Order Net increase (decrease) from this Change Order Contract Price including this Change Order $] .332.82] .20 (] 0.834.70) $] .321.986.50 9.386.7 ] $1.331.373.2] CHANGE IN CONTRACT TIME Original Final Completion Date for Section I Original Final Completion Date for Section 2 Fina] Completion Date for Section I by previous Change Orders Final Completion Date for Section 2 by previous Change Orders Fina] Completion Date for Section 1 from this Change Order Fina] Completion Date for Section 2 from this Change Order Julv 8. 1991 August 1. 1991 Ju]y 8. ]99] August J. ]99] Julv 8. ]99] August 1. ]99] Engineer's Recommendation, RIEKE CARROLL MULLER ASSOC., INC. by ~j,)Ua-...vV date by ~O.~date S:/30/9/ I I Contractor's Acceptance, AMES CONSTRUCTION, INC. &wner's Order, CITY OF HOPKINS ~/' ! 1/ by date Page I of I .' . . . SUPPLEMENT to CHANGE ORDER NO.3 for 7TH STREET SOUTH LANDFILL GAS REMEDIATION CITY OF HOPKINS PROJECT NO. 90-18 RCM PROJECT NO. 12079 Date of Change Order: May 30, 1991 Descriotion of Change Provide the dewaterin~ discharge measurement system as shown on the three (3) 8%..inch by 1 I-inch attached drawmgs. Payment for this additional work will be on a time and material basis. The following shall be included in this additional work: 1. Discharge pipe of system shall enter existing sanitary sewer manhole through the adjusting rings below the casting, above the concentric cone section. 2. Provide a system of pipe and 90.degree elbows to provide a horizontal discharge at the bottom of the existing manhole. 3. Provide a device in the weir manhole to continuously record the depth of flow or flowrate. The power source for this equipment shall be I 10-volt AC carried from a fused circuit in the field office by a UF cable buried 2 feet below ground. This electric service shall terminate at an outlet mounted in a weatherproof enclosure of adequate size to house the equipment. 4. The Owner will retain the pipe, valve, manhole, and electric cable materials. Justification The Metropolitan Waste Control Commission (MWCC) required the dewatering discharge volume to be measured and included in the monthly Special Discharge Report to be submitted to the MWCC. Pricing Data Attached is Serial Letter No. 20 from the Contractor with the submitted costs to install this system including invoices from subcontractors and material suppliers. The Engineer has reviewed these submitted costs and has determined that the cost appears to be reasonable. Attachments to this Suoolement 1. Drawings by Engineer - 3 pages. 2. Letter from Contractor - 8 pages. Page 1 of I .., l\ AMES CONSTRUCTION., INC. 14420 COUNTY ROAD 5 BURNSVILLE, MINNESOTA 55331 (612) 435-1106 · FAX 435-1142 - 00 rn@rnnwrnrn MAY 7" 1991 May 6, 1991 Rick.-CmI!H~uIlM A.u.I!cbUt lIle. Box 130 Hopkins, Minn. 55343 Rieke, Carroll, Muller, Associates, Inc. 10901 Red Circle Drive Minnetonka, Minnesota 55343 Attention: James 8. Hammer, P.E. Reference: Dewatering Measurement System Ames Serial letter Number 20 7th Street South landfill Gas Remediation City of Hopkins Project Number 90-18 Hopkins, Minnesota e Gentlemen: As discussed, we have completed the installation of the dewatering measurement system. This was done according io your instructions in your serial letter number 15. The costs are summarized on the attached tabulation with the invoices also attached. As you can see, the total cost for this work was $9,386.71. It is our request that a change order be written for this amount. If there are any questions, please give me a caIl. Sincerely, ~~~ Michael Moeller Project Manager. . cc: James City of Hopkins .An LjIUJl OpporrWlity Empl~r OFFICES l:'t: OE:'Ii\'ER. COLORADO . PHOENIX, ARIZONA · SALT LAKE CITI', UTAH . . . Hopkins Landfill Gas Remediation Dewatering Measurement System Pipe Installation 4/15/91 Item Hours Rate ExtensIon CAT 235 Backhoe 8 135 $1,080.00 Pipelayer 12 30 $360.00 Pipe Foreman 12 35 $420.00 lowboy 2.5 75 $187.50 Subtotal $2,047.50 MaterIals Plywood $82.86 Fasteners $16.00 Concrete MH (North Star) $949.34 Pipe (Water Products) $3,395.52 ToolBox (Total TooQ $257.58 Subtotal $4.701.30 Subcontractors Dynamic Systems $1,447.86 Electrician $336.71 . Total $8,533.37 lOOk Profrt & Overhead $853.34 Grand Total $9,386.71 e