Proposed Action.
Staff recommends adoption of the following motion: Move that Council
authorize Change Order No. 7 as it concerns the 7th Street South
Landfill Gas Remediation, Project 90 -18
ov rview..
As. the landfill project drew to a close, staff became aware of a need
to improve drainage characteristics and landscaping in the northeast
area of the site. Storm runoff from an area around the existing
Public works storage garage and the north end - of the site as it
approaches 7th Street South has been a perennial problem. The
consultant engineer proposed a shallow holding pond and storm sewer
pipe to an existing catch basin 'in 7th Street. Also proposed was
additional grading, placement of topsoil, and seeding. The change
order work was done concurrently with related work at the site by Ames
Construction.
Primary Is sues to Consider.
o What are the costs?
Change Order No. 7 will cost an additional $21,080.20.
o What are the specifics of this change order.?
See the attached supplement from RCM'and Associates for
description of change and justification.
Supporting'Information..
o Change Order No. 7
A lov,r,l
James Gessele
Engineering Superintendent
CHANGE ORDER NO. 7
PROJECT: 7th Street South Landfill Gas Remediation
Date: July 26, 1991
Hopkins, Minnesota
OWNER: City of- Hopkins
Owner's Project No.: 90 -18
TO: (Contractor): Ames Construction, Inc.
Engineer's Project No.: 12079
14420 County Road 5
Burnsville, MN 55337'
Contract Date: April 1, 1991
You are hereby directed to make the following change in the Contract Documents.
Description of Change:
Refer to the attached Supplement to this Change Order (1 page).
CHANGE IN CONTRACT PRICE
Original Bid Price
$1.332,821420
Net change from previous Change Orders
44,766.94
Contract Price prior to this Change Order
$1,377,588.14
Net increase (decrease) from this Change Order
_
21,080.20
Contract Price including this Change Order
_ $1,398,668.34
CHANGE IN CONTRACT TIME
Original Final Completion Date for Section 1
Judy 8, 1991
Original Final Completion Date for Section 2
August 1. 1991
Final Completion Date for Section 1 by previous Change Orders
July 8. 1991
Final Completion Date for Section 2 by previous Change Orders
___
August 1, 1991
Final Completion Date for Section l from this Change Order
_
July 8. 1991
Final Completion Date for Section 2 from this Change Order
_
August 1, 1991
Engineer's Recommendation, by
date
RIEKE CARROLL MULLER ASSOC., INC.
Contractor's Acceptance, b J • ��� d ate 27 1-It y ztc .
AMES CONSTRUCTION, INC.
Owner's Order, by
date
CITY OF HOPKINS
Page i of I
SUPPLEMENT
to
CHANGE ORDER NO. 7
for
7TH STREET SOUTH LANDFILL GAS REMEDIATION
CITY OF HOPKINS PROJECT NO. 90 -18
RCM PROJECT NO. 12079
Date of Change Order: July 26, 1991
Description of Change
1. Construct drainage improvements in the northeast area of the site, including grading
and storm sewer installation, as shown on revised Sheet No. 5 dated 7/1/91 as issued
with Proposal Request No. 2 on July 1, 1991.
2. It shall be permissible to construct embankments with material excavated as a result
of this work.
3. Restore disturbed areas with six (6) inches of Topsoil Borrow material and seed
mixture No. 700.
4. The work of this Change Order shall be in accordance with the Contract Documents.
Justif ication
The purpose of this additional work is to improve site drainage as was requested by the
Owner.
Pricing Data
Attached is a copy of Serial Letter No. 32 from the Contractor with the costs for this
additional work submitted in response to Proposal Request No. 2. The Engineer , has
reviewed these costs and has determined they are reasonable.
Page 1 of 1
AMES CONSTRUCTION, INC.
14420 COUNTY ROAD 5
BURNSVILLE, MINNESOTA 55337
(612) 435 -7106 FAX 435 -7142
July 8, 1991 O � @ N -0, W
Rieke, Carroll, Muller, Associates, Inc. JUL 1
10901 Red Circle Drive
Minnetonka, Minnesota 55343 kwaffsli-:.. Assames lit.
' Box 1?0 Hopkins, Minn. 55343
Attention: James B. Hammer, P.E.
Reference: Proposal Request No.2 Ames Serial Letter Number 32
7th Street South Landfill Gas Remediation
City of Hopkins Project Number 90 -18
Hopkins, Minnesota
Gentlemen:
We have reviewed Proposal Request No. 2 dated 7/1/91. This document would
change the grading in the north end of the site, add a pipe inlet with some 12" RCP
draining into an existing catch basin, and add topsoil and seeding for the area.
The cost for this additional work would be as follows.
Item Quantity Unit Price Extension
Pipe
12" RCP 120 f t $20.00 $2
12" FES w/ Trash Guard 1 ea $675.00 $675.00
Tie into Existing C.B. 1 ea $200.00 $200.00
Grading
Excavation 3595 cy $2.35 $8,448.25
Topsoil 1613 cy $5.15 $8,306.95
Seeding 2 ac $525.00 $1,050.00
$21,080.20
We are assuming that this work would be done concurrently with the related work on
our present contract, that the excess soil would be placed relatively closely on the site,
and that no street repairs are included near the existing catch basin.
If there are any questions, please give me a call.
Sincerely,
Michael Moeller
Project Manager.
cc James Gessele City of Hopkins