CR 91-178 Landfill Project - Change Order 7August 14, 1991 \ I Y O G � ti 5 0 P K 0 Council Report: 91 -178 LANDFILL PROJECT - CHANGE ORDER NO. 7 Proposed Action. Staff recommends adoption of the following motion: Move that Council authorize Change Order No. 7 as it concerns the 7th Street South Landfill Gas Remediation, Project 90 -18 ov rview.. As. the landfill project drew to a close, staff became aware of a need to improve drainage characteristics and landscaping in the northeast area of the site. Storm runoff from an area around the existing Public works storage garage and the north end - of the site as it approaches 7th Street South has been a perennial problem. The consultant engineer proposed a shallow holding pond and storm sewer pipe to an existing catch basin 'in 7th Street. Also proposed was additional grading, placement of topsoil, and seeding. The change order work was done concurrently with related work at the site by Ames Construction. Primary Is sues to Consider. o What are the costs? Change Order No. 7 will cost an additional $21,080.20. o What are the specifics of this change order.? See the attached supplement from RCM'and Associates for description of change and justification. Supporting'Information.. o Change Order No. 7 A lov,r,l James Gessele Engineering Superintendent CHANGE ORDER NO. 7 PROJECT: 7th Street South Landfill Gas Remediation Date: July 26, 1991 Hopkins, Minnesota OWNER: City of- Hopkins Owner's Project No.: 90 -18 TO: (Contractor): Ames Construction, Inc. Engineer's Project No.: 12079 14420 County Road 5 Burnsville, MN 55337' Contract Date: April 1, 1991 You are hereby directed to make the following change in the Contract Documents. Description of Change: Refer to the attached Supplement to this Change Order (1 page). CHANGE IN CONTRACT PRICE Original Bid Price $1.332,821420 Net change from previous Change Orders 44,766.94 Contract Price prior to this Change Order $1,377,588.14 Net increase (decrease) from this Change Order _ 21,080.20 Contract Price including this Change Order _ $1,398,668.34 CHANGE IN CONTRACT TIME Original Final Completion Date for Section 1 Judy 8, 1991 Original Final Completion Date for Section 2 August 1. 1991 Final Completion Date for Section 1 by previous Change Orders July 8. 1991 Final Completion Date for Section 2 by previous Change Orders ___ August 1, 1991 Final Completion Date for Section l from this Change Order _ July 8. 1991 Final Completion Date for Section 2 from this Change Order _ August 1, 1991 Engineer's Recommendation, by date RIEKE CARROLL MULLER ASSOC., INC. Contractor's Acceptance, b J • ��� d ate 27 1-It y ztc . AMES CONSTRUCTION, INC. Owner's Order, by date CITY OF HOPKINS Page i of I SUPPLEMENT to CHANGE ORDER NO. 7 for 7TH STREET SOUTH LANDFILL GAS REMEDIATION CITY OF HOPKINS PROJECT NO. 90 -18 RCM PROJECT NO. 12079 Date of Change Order: July 26, 1991 Description of Change 1. Construct drainage improvements in the northeast area of the site, including grading and storm sewer installation, as shown on revised Sheet No. 5 dated 7/1/91 as issued with Proposal Request No. 2 on July 1, 1991. 2. It shall be permissible to construct embankments with material excavated as a result of this work. 3. Restore disturbed areas with six (6) inches of Topsoil Borrow material and seed mixture No. 700. 4. The work of this Change Order shall be in accordance with the Contract Documents. Justif ication The purpose of this additional work is to improve site drainage as was requested by the Owner. Pricing Data Attached is a copy of Serial Letter No. 32 from the Contractor with the costs for this additional work submitted in response to Proposal Request No. 2. The Engineer , has reviewed these costs and has determined they are reasonable. Page 1 of 1 AMES CONSTRUCTION, INC. 14420 COUNTY ROAD 5 BURNSVILLE, MINNESOTA 55337 (612) 435 -7106 FAX 435 -7142 July 8, 1991 O � @ N -0, W Rieke, Carroll, Muller, Associates, Inc. JUL 1 10901 Red Circle Drive Minnetonka, Minnesota 55343 kwaffsli-:.. Assames lit. ' Box 1?0 Hopkins, Minn. 55343 Attention: James B. Hammer, P.E. Reference: Proposal Request No.2 Ames Serial Letter Number 32 7th Street South Landfill Gas Remediation City of Hopkins Project Number 90 -18 Hopkins, Minnesota Gentlemen: We have reviewed Proposal Request No. 2 dated 7/1/91. This document would change the grading in the north end of the site, add a pipe inlet with some 12" RCP draining into an existing catch basin, and add topsoil and seeding for the area. The cost for this additional work would be as follows. Item Quantity Unit Price Extension Pipe 12" RCP 120 f t $20.00 $2 12" FES w/ Trash Guard 1 ea $675.00 $675.00 Tie into Existing C.B. 1 ea $200.00 $200.00 Grading Excavation 3595 cy $2.35 $8,448.25 Topsoil 1613 cy $5.15 $8,306.95 Seeding 2 ac $525.00 $1,050.00 $21,080.20 We are assuming that this work would be done concurrently with the related work on our present contract, that the excess soil would be placed relatively closely on the site, and that no street repairs are included near the existing catch basin. If there are any questions, please give me a call. Sincerely, Michael Moeller Project Manager. cc James Gessele City of Hopkins An Equal Opportunity Employer OFFICES IN: DENVER, COLORADO • PHOENIX, ARIZONA SALT LAKE CITY, UTAH