September 9, 1991 Council Report: 91 -202
LANDFILL PROJECT - CHANGE ORDER NO. 8
Proposed Action.
Staff recommends adoption of the following motion: Move
that Council authorize Change Order No. 8 as it concerns the
7th Street S. Landfill Gas Remediation, Project 90 -18.
overview.
After the landfill remediation project got underway, the
MPCA requested a change in compaction requirements for the
24 inches of topsoil cover in the landfill area itself. A
work change directive was issued to Ames Construction by RCM
to execute this request. The contractor was requested to
submit an itemized proposal for additional compensation
because of the additional finish grading stage added to the
scope of the project.
Primary Issues to Consider.
o What are the costs?
Change Order No. 8 will cost an additional
$18,200.
o What are the specifics of this change order?
See the attached supplement from RCM . and
Associates for description of change and
justification.
Supporting Information.
o Change Order No. 8
James Gessele
Engineering Superintendent
f '
CHANGE ORDER NO. 8
PROJECT: 7th Street South Landfill Gas Remediation
Hopkins, Minnesota
OWNER: City of Hopkins
TO: (Contractor): Ames Construction, Inc.
14420 County Road 5
Burnsville, MN 55337
Date: August 27, 1991
Owner's Project No.: 90 -18
Engineer's Project No.: 12079
Contract Date: April 1, 1991
You are hereby directed to make the following change in the Contract Documents.
Description of Change:
Refer to the attached Supplement to this Change Order (7 pages).
CHANGE IN CONTRACT PRICE
Original Bid Price
$1.332.821.20
Net change from previous Change Orders
65.847.14
Contract Price prior to this Change Order
$1.398.668.34
Net increase (decrease) from this Change Order
18.200.00
Contract Price including this Change Order
$1. 416,868.34
CHANGE IN CONTRACT TIME
Original Final Completion Date for Section 1
July 8.
1991
Original Final Completion Date for Section 2
August 1.
1991
Final Completion Date for Section I by previous Change Orders
July 8,
1991
Final Completion Date for Section 2 by previous Change Orders
August 1.
1991
Final Completion Date for Section 1 from this Change Order
July 8.
1991
Final Completion Date for Section 2 from this Change Order
August 1.
1991
Engineer's Recommendation,
RIEKE CARROLL MULLER ASSOC., INC.
Contractor's Acceptance,
AMES CONSTRUCTION, INC.
by r,Q� �r,,,•,Q,./ date `a 2� 9/
Ir
by Q date f I-t g�
Owner's Order, by date
CITY OF HOPKINS
Page 1 of 1
r ,
r
SUPPLEMENT
to
CHANGE ORDER NO. 8
for
7TH STREET SOUTH LANDFILL GAS REMEDIATION
CITY OF HOPKINS PROJECT NO. 90 -18
RCM PROJECT NO. 12079
Date of Change Order: August 27, 1991
Descriotion of Change
Change the compaction requirement for the 24 inches of topsoil on the refuse disposal area
as follows:
Lower 18 inches: 95% Standard Proctor Density
Top 18 inches: Loose
Justification
This change is a requirement of the Minnesota Pollution Control Agency.
Pricinp, Data
Attached is a copy of Serial Letter No. 7 from the Contractor in response to Work Change
Directive No. 3. Attached is a copy of the cost estimate prepared by the Engineer for this
change. Attached is a copy of Serial Letter No. 23 from the Engineer requesting additional
cost information. Attached is a copy of Serial Letter No. 33 from the Contractor stating
their position on this change. Attached is ' a copy of Serial Letter No. 37 from the
Contractor stating the Contractor agreed with the cost for this additional work as estimated
by the Engineer.
Page 1 of 1
r
1
April 3, 1991
Rieke, Carroll, Muller, Associates, Inc.
10901 Red Circle Drive
Minnetonka, Minnesota 55343
Attention: James B. Hammer, P.E.
r
Reference: Change Directive No. 3 Ames Serial Letter Number 7
7th Street South Landfill Gas Remediation
City of Hopkins Project Number 90 -18
Hopkins, Minnesota
. Gentlemen:
We have reviewed the referenced document as it affects our scope of work on the
referenced project. This document would add a compaction requirement to the topsoil.
The revised requirement calls for 95% Standard Proctor Density in the lower 18 inches
and the top 6 inches is to be loose.
We resist this change in that it seems counterproductive. Should the change be
required; however, there would be additional costs associated. This revised
specification is not easily achieved. We would have to add an additional finish
grading stage to the entire black dirt area in order to meet the requirement. The
additional cost would be $25,667.00.
If there are any questions, please give me a call.
Sincerely,
n�
Michael Moeller
Project Manager.
cc: James Gessele City of Hopkins
AMES CONSTRUCTION, INC.
14420 COUNTY ROAD 5
BURNSVILM MINNESOTA 55337
(612) 435 -7106 -
D L LR
APR 8 1991
Rieke - Carton - e: Asse:atss lot.
Box 130 Hopkins, Minn. 55343
OFFICES IN: DE.NNSR. COLORADO • PHOENIX,, ARIZONA • SALT LAKE CITY. UTAH
� fzo D
Q, ADDPTIO"A L Er-fo x" W1 LL co N$ / o p Z o DN - wA
Y
Tsz)Rr Acwas.r 7m E A o LA �FiLL }�7zoPE njsRS 4 �� E �pP12a X�rf- J.4TEtf►
95D 1 J. l :-o D
h F Z4vr--f-. .SP£o or Sy Fool Carrlp4G7otz /S F�- T /S•v� f9N� 71-f-E �rf�c -TiY�
i w of T7+E .2>A&fAl u 6- D FE , 7Hz f - ' n D , wc?7a� i - r Z4- .SG? . F T, /SEcoNo ,
G - 1. o Ac- 1 ry L T?v u .. J� E7. 9 EL4T r VC ZVIVUi Ty, A.UDITI o V,4 L Q` gA 7-j A/C �2
RC:QkigeEb 70 R-6Vrrr.E Molr7tt4E g:;vN75v7 flF' KrEo wu
g -. S.»a LL Do aura A Duc —r PL -ate/. A- aD; u0",4L .4EV-4TIo„J g5-:Fr%>R-7
GoN11ST� o �- ss i. e . S o. -E--L-. a r2i mss) Acea r.r oNE - ,& c F or Ash of
fjAni�Dl =rat_ ��PER . �4vEL s of Esc is Z �c�5 - �S�toNo i4N� `77-fE fIV
wrD'f}f of `T'}} b ► sG' / - s 6 ���1'� TNzrs �F- abcrc7ly� 12ES'r�` � Z¢- sue. �1' �S�a .vim.
Z. E I- A7-E�S
'I. - S pco c m AQGTDic
ERA MV6 1504) PM Ef -r
L41vrr R6 9A
` Z D, oo Z
Y
U N ,r mpc- Ccr7
9, no
LAYox Csi r Cop Teg,
3S. Do J ocrR
' y
h"
UAv1r !z6;fi4L RA7= (vos;nc
Piv,T 0 P507746' COST D?1E1t-
1 S, as /Ilpu�
WN►r )ZFiv'r4L RRT5 MrC-�
l S. 00 a�tc
U - r r oPe1Twr cosrr Nra)
S; U D
LAZ-ax cos-r (orev--4TOO
T or-aL. 11'0 ZL RA-rr
D S o0
• l�l0�1�.
3. Q+f/P - T MME 1Rc r- Ea
9sv Pr X ;=r
a. <-4+(5vP-Cr l-r fir►, Cron ZO rR►ps 'A .��r /5 Oct#
S X b r-r X 360 '
HOW
b. �� rr.V g ��1 / P�lf • T ; g rte, ps x
f'Y X 3b�o S6c
sit hbuR
M o D1 FiE A ! 2'ac-T-o , DE - )V-V ry - ro ✓ CJ6LiVS.* T 1
�.
A S, y M P Pw is
Ps
t;577m4 7
f /
� /} ,04
. 46A 77N 6 5a? N/ Pm�T = 6 2 Hovpu 8 �/foujz = 6 6
l
�. u.w Tls7 A - TEib
-
1
E3 Z Q. Q
e
10901 red circle drive
box 130
minnetonka, minnesota 55343
612- 935 -6901
July 5, 1991
Mr. Michael Moeller
Project Manager
Ames Construction, Inc.
14420 County Road 5
Burnsville, MN 55337
RE: 7th Street South Landfill Gas Remediation
Hopkins, Minnesota
City Project No. 90 -18
RCM Project No. 12079 RCM Serial Letter No. 23
Topsoil Compaction
Dear Mr. Moeller:
rieke
This letter is in response to Ames Serial Letter No. 7.
carroll
mul� b
We have reviewed this letter regarding the additional costs you stated you
will incur in providing the additional efforts to compact the topsoil to the
ar itects
MPCA- required 95 percent Standard Proctor Density. Further information is
Lind survWom
needed for us to review the justification for the additional costs stated.
equal opportuni
Please submit promptly an itemized cost breakdown including the hourly rate
employer
and amount for each additional cost you will incur in performing this work.
Sincerely,
James B. Hammer, P.E.
RIEKE CARROLL MULLER ASSOCIATES, INC.
JBH /Jj
c: James Gessele; City of Hopkins
Jonathan ScoIl; Doherty Rumble & Butler
George Anderson; RCM
10901 red circle drive
box 130
minnetonka, minnesota 55343
612- 935 -6901
AMES CONSTRUCTION, INC..
14420 COUNTY ROAD 5
BURNSVILLE, MINNESOTA 553
(612) 435 -7106 FAX 435 -7 i s I:` i i
J
ip
uly 10 1991 P�.
Rieke, Carroll, Muller, Associates, Inc. JUL 121991
R't c -iaR�i ,:� -r: �y:. -� �;��,� ii% 3n .
10901 Red Circle Drive _.
Minnetonka, Minnesota 55343 Box 130 Hopkins. 55 3
Attention: James B. Hammer, P.E.
Reference: Compaction to 95% Standard Proctor Ames Serial Letter Number 33
7th Street South Landfill Gas Remediation
City of Hopkins Project Number 90 -18
Hopkins, Minnesota
Gentlemen:
We have received your serial letter no. 23. Our position has not changed since our
serial letter no. 7.
We have tried to discourage the upgrading of the compaction specification for the
topsoil to 95% standard proctor density. This modification does not make sense.
We are discussing the compaction of two feet of topsoil which overlie landfill debris.
We have been told that the change is required due to the. risk of settlement causing
poor surface drainage. Realistically, the settlement possible in the two feet of
topsoil is insignificant compared to the settlement from the landfill below.
If you insist on the change, the cost is the price we indicated previously, $25,667.00.
We realize that hourly costs do not fully account for the extra cost. The full amount is
justified; however, due to other concerns. We have a very real concern that the
increased compaction may not be physically possible. We have been able to achieve
the increased compaction so far; however, this is definitely a difficult process tryingto
compact the topsoil over the landfill which is extremely soft. The other concern is the
additional time this compaction is taking. There is the possibility that this additional
compaction could take so much time that we would not have the project completed by
the deadline. We could then be assessed .liquidated damages.
If there are any questions, please give me a call.
Sincerely,
" 7)�
Michael Moeller
Project Manager.
cc: James Gessele City of Hopkins
An Equal Cpportun4 EpVloyer
OFFICES IN: DENVER, COLORADO • PHOENIX, ARIZONA * SALT LAKE CITY. UTAH
AMES CONSTRUCTION, INC. !W
14420 COUNTY ROAD 5 C
BURNSVILLE, MINNESOTA X 55337
(612) 435 -7106 FAX 435 -7142
� 31991
August 12, 1991 AUG ,
t • -a
Rieke, Carroll, Mu ller, Associates,, Inc. ;-{¢p. tc;j-
10901 Red Circle Drive
Minnetonka, Minnesota 55343
Attention: James B. Hammer, P.E.
Reference: Compaction to 95% Standard Proctor Ames Serial Letter Number 37
7th Street South Landfill Gas Remediation
City of Hopkins Project Number 90 -18
Hopkins, Minnesota
Gentlemen:
As per our discussion today, we agree to the add of $18,200.00 to settle . this issue.
This letter superseeds our previous letter of July 10, 1991
If there are any questions, please give me a call.
Sincerely,
Michael Moeller
Project Manager.
cc: James Gessele City of Hopkins
An Equal Opportunity Employer
OFFICES IN: DENVER. COLORADO PHOENIX. ARIZONA - SALT LAKE CITY, UTAH