CR 91-276 Landfill Project Change Orders 9/10December 11, 1991 Proposed Action. Overview. Council Report: 91 -276 LANDFILL PROJECT - CHANGE ORDER NOS. 9 & 10 Staff recommends adoption of the following motion: Move that Council authorize Change Order Nos. 9 and 10 as they concern the 7th Street South Landfill Gas Remediation Project 90 -18. Upon completion of the methane barrier unacceptable levels of methane were discovered near the Westbrooke Patio Homes. Field tests indicated the likelihood of the gas migrating over the liner on the landfill side of the anchor trench just beneath the densely compacted topsoil. Consultant engineers met with the MPCA and the consensus was to perform corrective repositioning of the liner. That work is contained in Change Order No. 9. Because post - monitoring indicated the presence of methane between the newly installed barrier and the Westbrooke property, several additional monitoring wells needed to be installed near the homes. The Westbrooke Association requested some means of mitigating the visual impact of the wells and their protective bollards. The planting of evergreen shrubs was the most effective means of camouflaging. Primary Issues to Consider. o What are the costs? Change Order No. 9 will cost an additional $26,746.40. Change Order No 10 will cost an additional $2,622.00. o What are the specifics of these change orders? See the attached supplements from RCM and Associates for description of change and justification. Supporting Information. o Change Order Nos. 9 and 10 4 04-4-4il James Gessele Engineering Superintendent • 1 ' CHANGE ORDER NO. 9 PROJECT: OWNER: City of Hopkins Owner's Project No.: 90 -18 TO: (Contractor): Ames Construction, Inc. Engineer's Project No.: 12079 14420 County Road 5 Burnsville, MN 55337 Contract Date: April 1, 1991 You are hereby directed to make the following change in the Contract Documents. Description of Change: 7th Street South Landfill Gas Remediation Date: November 22. 1991 Hopkins, Minnesota Refer to the attached Supplement to this Change Order (3 pages). CHANGE IN CONTRACT PRICE Original Bid Price Net change from previous Change Orders Contract Price prior to this Change Order Net increase (decrease) from this Change Order Contract Price including this Change Order CHANGE IN CONTRACT TIME Original Final Completion Date for Section 1 Original Final Completion Date for Section 2 Final Completion Date for Section 1 by previous Change Orders Final Completion Date for Section 2 by previous Change Orders Final Completion Date for Section 1 from this Change Order Final Completion Date for Section 2 from this Change Order Engineer's Recommendation, by -;x oiwye4. - date RIEKE CARROLL MULLER ASSOC., INC. Contractor's Acceptance, AMES CONSTRUCTION, INC. by 22i.4f ?ltmeKt date $1.332.821.20 84.047.14 $1.416,868.34 26.746.40 $1,443.614.74 July 8. 1991 August 1, 1991 July 8, 1991 August 1. 1991 Julv 8. 1991 August 1. 1991 il/zzfr/ Owner's Order, by date ITY OF HOPKINS Page 1 of 1 Council Report #91 -272 Page Two SUPPLEMENT to CHANGE ORDER NO. 9 for 7TH STREET SOUTH LANDFILL__ GAS R.F 1 flT A_-r_" Primary Issues to Consider o What changes are being made to Section 440? 1) Contractors who are licensed by the State would be exempt from being licensed by the City. Subd. 3. State license exemption. Contractors required to be licensed by the State of Minnesota are exempt from obtaining a city license under this section to perform work for which they are licensed by the State of Minnesota. A state licensed contractor must provide a copy of the state license to the City in order to obtain a permit from the City building inspector. This section will ensure that all contractors have either a state or City license. 2) Owners of commercial or industrial buildings would not need a contractor's license if they were working on their own building, the work did not involve plumbing, electrical or mechanical systems, and the total cost of the work was less than $2,000.00. Subd. 5. Owner rights and responsibility. An owner is not required to obtain a license under this section to personally perform any work in connection with the owner's residence or other dwelling and appurtenances including the right of the owner to engage the services of any aids or helpers ; -bttt- the- -requ-irecp fees- Est -be -paid - - The- work inset a -in - compliance with- -the - - various - rl-c rag- - other- - -re-lev t - code$, - - and - - tie- - ewner - - is responsible- and - 1Iabl-e -fer- any- -] &&e& -er- MA-eh -may - -arise- -or- -be eaused- by- -sueh - construction- -or - by- -the - violation- -G€ - any- - r- equ- irement-s- -under applieable- statutes - and - previsions - e € this - eerie: An owner of a commercial or industrial property is not required to obtain a contractor's license under this section in order to personally perform any general construction work not involving plumbing. mechanical, gas fitting. electrical, or fire suppression systems. when such work is in connection with the owner's building or appurtenance. including the right of the owner to engage the services of any aids or helpers. if the value of construction is less than $2.000.00 for any one project or $5,000.00 for any • La! C7 > Z 1 N t!? tR vo < v U — a. 0 CC 1 • CC CO to o < co o z o L o w — tD LiLaI 1 Z uaJ yO— <— Lai toCY) F•- -- U) X v) • < L.1 Li Wa. 0 O ` - o WtDCDV) C Z ca CD Z — t < t/ W 4 .< c� > CL Z Lv � U) Q QOV, D CC O Q (NIW) I10�I Z • Z 0 1-- 0 CL 0 O Z • Z 1 — Cr, J X La. La! O 0 a J ts.. O CC V) : a. t- 0 Li * CC t0 Z v M CC • • 0 0 0 Z a 5 1 SEVENTH STREET SOUTH LANDFILL GAS REMEDIATION HOPKINS. MINNESOTA 1— Lai CC 0 C LI 1-- '4f J - - M La_ 1— LLJ 0 Z C� — Z L. M REVISIONS (DATE l 11 /22/91 J CHANGE ORDER NO. 9 SHEET No. IOFI FILE N0. 120T9.06 October 11, 1991 Rieke, Carroll, Muller, Associates, Inc. 10901 Red Circle Drive Minnetonka, Minnesota 55343 Attention: James B. Hammer, P.E. Reference: Proposal Request No. 3 Ames Serial Letter Number 39 7th Street South Landfill Gas Remediation City of Hopkins Project Number 90 -18 Hopkins, Minnesota Gentlemen: We have reviewed the referenced proposed changes. Below is our proposed cost for the work as outlined. As discussed, we would reposition the top of the liner, replace the topsoil, and restore the disturbed area with seed and mulch. Our cost for this work would be a total of $28,140.00. This would result in a unit price of $13.40 per foot. This unit price would be valid for a reasonable length of work only Please let us know on this work as soon as possible so the work might be completed leted this fall. g p if there are any questions, please give me a call. Sincerely, Michael Moeller Project Manager. AMES CONSTRUCTION, INC. 14420 COUNTY ROAD 5 BURNSVILLE, MINNESOTA 55337 (612) 435 -7106 • FAX 435 -7142 OCT F 16 1991 issallits tat. Box 130 Hopkins Minn. 6534: cc: James Gessele City of Hopkins An Equal Opportunity Employer OFFICES IN: DENVER, COLORADO • PHOENIX, ARIZONA • SALT LAKE CITY, UTAH CHANGE ORDER NO. 10 PROJECT: OWNER: City of Hopkins Owner's Project No.: 90 -18 TO: (Contractor): You are hereby directed to make the following change in the Contract Documents. Description of Change: Justiciation of Change: Pricing Data: 7th Street South Landfill Gas Remediation Date: November 22. 1991 Hopkins, Minnesota Ames Construction, Inc. Engineer's Project No.: 12079 14420 County Road 5 Burnsville, MN 55337 Furnish and plant fifty - seven (57) Sea Green Juniper evergreen shrubs adjacent to various gas wells and piezometers. Unit price for this work shall be $46.00, resulting in an amount of $27662;00. Z, co U7e This change is intended to make the monitoring appurtenances more visually appealing. Attached is a copy of Serial Letter No. 40 from the Contractor, indicating a Unit Price of $46.00. The Engineer has reviewed this price and determined it is reasonable. Attachment: Letter from Contractor - 1 page. CHANGE IN CONTRACT PRICE Original Bid Price Net change from previous Change Orders Contract Price prior to this Change Order Net increase (decrease) from this Change Order Contract Price including this Change Order CHANGE IN CONTRACT TIME Original Final. Completion Date for Section 1 Original Final Completion Date for Section 2 Final Completion Date for Section 1 by previous Change Orders Final Completion Date for Section 2 by previous Change Orders Final Completion Date for Section 1 from this Change Order Final Completion Date for Section 2 from this Change Order Engineer's Recommendation, RIEKE CARROLL MULLER ASSOC., INC. Contractor's Acceptance, 111 04MES CONSTRUCTION, INC. Owner's Order, CITY OF HOPKINS by by . date by Page 1 of 1 Contract Date: April 1, 1991 $1.332.821.20 110,7 $1,443.614.74 2.622.00 $1.446.236.74 July 8. 1991 August 1. 1991 July 8. 1991 August 1. 1991 July 8. 1991 August 1. 1991 date /1/4- Z/9/ ///2 9/2/ date November 13, 1991 Rieke, Carroll, Muller, Associates, Inc. 10901 Red Circle Drive Minnetonka, Minnesota 55343 Sincerely, Michael Moeller Project Manager. cc: James Gessele City of Hopkins AMES CONSTRUCTION, INC. 14420 COUNTY ROAD 5 BURNSVILLE, MINNESOTA 55337 (612) 435 -7106 • FAX 435 -7142 D NOV 151991 Rieke-Carr Ass - ,;liz 1t c. Box 130 Hopkins, Minn. 5530 Attention: James B. Hammer, P.E. Reference: Proposal Request No 4 Ames Serial Letter Number 40 7th Street South Landfill Gas Remediation City of Hopkins Project Number 90 -18 Hopkins, Minnesota Gentlemen: We have reviewed the referenced proposed changes. The changes consist of adding 50 sea green juniper evergreen shrubs on the job. Apparently, you have met with Greenworks and have discussed the desired locations of the shrubs. Our cost for this work would be a total of $2,300.00. Please let us know on this work as soon as possible so the work might be completed this fall. If there are any questions, please give me a call. An Equal Opportunity Employer OFFICES IN DENVER, COLORADO • PHOENIX, ARIZONA • SALT LAKE CITY, UTAH