Loading...
1988-070 CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO. 88-70 RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENTS WHEREAS, certain improvements, all as more fully described in Exhibit A hereto attached and hereby made a part hereof have been previously ordered and completed: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HOPKINS, MINNESOTA, as follows: 1. That the cost of each such improvement to be specially assessed is hereby declared to be the cost of the amount to be assessed, whichever is greater, which appears in said Exhibit A. 2. That the City Clerk, with the assistance of Director of Engineering, forthwith calculate the proper amount to be specially assessed for each such improvement against every assessed piece or parcel of land within the various districts or locations affected without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessments in his office for public inspection. The Clerk shall, upon the completion of such proposed assessments, notify the Council thereof. Passed and adopted by the Council of the City of Hopkins, Minnesota, this 2nd day of August, 1988. JAMES A. GENELLIE City Clerk JERRE A. MILLER City Attorney DONALD J. MILBERT Mayor E X H I BIT A 1. Project 87-01 Installation of fire protection sprinkler system at 21 Harrison Avenue North, the area proposed to be assessed being Lots 14, 15 and 16 and that part of Lot 17 lying SEly of NWly 15 ft. thereof incl. adj. 1/2 of alley vac. and adj. 1/2 of st. vac. 4/67, West Minneapolis Center (P.I.D. 19-117-21 31 0043), and the total cost for the project being $34,860. ' 2. Project 87-02 Fire hydrant installation at 1002-2nd street Northeast, the area proposed to be assessed being Tract M and that part of Tracts P and L Reg Land Survey No. 561 lying NEly of a line run from a point on the NWly line of said Tract P a dis of 66.79 ft SWly from the most Nly cor of said Tract P to a point on the Sly line of said Tract L a dis of 770.15 ft E from the most Wly cor of said Tract L also that part of Lot 91 Aud. Sub. No. 239 lying E of a line run from a point on the N line of said Lot 91 a dis of 31.21 ft W from the most Ely cor of said Lot 91 to a point on the SEly line of said Lot 91 a dis of 29.96 ft SWly from the most Ely cor thof (P.I.D. 19-117-2l 13 0019) and that part of Tracts P and L Reg Land Survey No. 561 lying SWly of a line run from a point on the NWly line of said Tract P a dis of 66.79 ft SWly from the most Nly cor of said Tract P to a point on the Sly line of said Tract L a dis of 770.15 ft E from the most Wly cor of said Tract L also that part of Lot 91 Aud. Sub. No. 239 lying Wly of a line run from a point on the N line of said Lot 91 a dis of 31.21 ft W from the most Ely cor of said Lot 91 through a point on the SEly line of said Lot 91 a dis of 29.96 ft from the most Ely cor thof (P.I.D. 19-117-21 13 0020), and the total cost for the project being $7,015. 3. 87-04 Improving an Alley at 358-19th Avenue North by concrete surfacing, the area proposed to be assessed being (P.I.D. 23-117-22 14 0030) Lot 1 and North 16 ft of Lot 2 and (P.I.D. 23-117-22 14 0041) Lot 30 and North 16 ft of Lot 29, all in Block 3, West Minneapolis Third Division, the total cost being $4,692. 4. 87-07 Installation of a wat r main xtension, th area proposed to be assess d being that part of NW 1/4 of SW 1/4 desc as beg at a pt on N line thof dist 250.82 ft E from the intersection of said N line with SEly r/w line of C.M. st. P & PRy, th SWly to a pt on a line drawn SEly at ria's to said r/w line and dist 150 ft from said pt of intersection th SWly par and dist 150 ft SEly of said r/w line to W line of NW 1/4 of SW 1/4 th S to SW cor thof th E along S line thof to W line of Westbrooke Patio Homes th N along said W line to N line of NW 1/4 of SW 1/4 th W to beg, except road, Sec 25 T 117 R 22 (P.I.D. 25-117-22 32 0092); Lot 1, Block 1 (P.I.D. 25- l17-22 33 0003) and Lot I, Block 2 (P.I.D. 25-117-22 33 0004), Opus 2 Ninth Addition; and Lot 1 (P.I.D. 25 117-22 33 0005) and Lot 2 (P.I.D. 25-117-22 33 0006), Block 1, Hills of Oakwood, the total cost being $28,350. 5. 87-08 Installation of fire protection sprinkler system at 107 Shady Oak Road, the area proposed to be assessed being (P.I.D. 23-117-22 44 0016) the property commencing at SW cor of Tract A, Reg. Land Survey No. 610, th W along the extension of the S line of Tract A, R.L.S. No. 610 to W line of SE 1/4 of SE 1/4, th N along said W line dis 398 ft th E 168 ft th S 90 ft. th E to W line of 20th Avenue South, th S along 20th Ave. So. to N line of R.L.S. No. 610, th W to NW cor of Tract A, R.L.S. No. 610 th S to pt. of beg., ex road Sec 23 T 117 R 22, total cost being $35,259. 6. 88-01 Installation of a sprinkler system for fire protection at 10-12th Avenue South, the area proposed to be assessed being Lots 7 and 8, including 1/2 of vacated alley, Block 8, West Minneapolis (24-117-22 34 0085); total cost being $30,903.60. 7. 88-02 Installation of a sprinkler system for fire protection at 907-915 Hopkins Center, the area proposed to be assessed being Tract C, Tract D, Tract E and Tract F, Registered Land Survey No. 953 (P.I.D. 24-117- 22 31 0003, 24-117-22 31 0004, 24-117-22 31 0005, 24-117 22 31 0006); total cost being $24,234. 8. 88-03 Installation of a sprinkler system for fire protection at 901 Mainstreet, the area proposed to be assessed being Lot 10, Block 68, West Minneapolis Second Division (P.I.D. 24-117-22 31 0014); total cost being $19,003.95. 9. 88-05 Installation of a sprinkler system for fire protection at 1410 Mainstreet, the area proposed to be assessed being the property commencing at a pt in the S line of Excelsior Avenue 389 ft W from E line of SW 1/4 of SW 1/4, th W along said S line a dis of 239 4/10 ft th S 350 ft par with the Eline thereof th E 259 2/10 ft par with the S line of Excelsior Avenue, th Nly to beg. (P.I.D. 24-117-22 33 0003); total cost being $37,038.75 10. 88-09 Construction of a parking ramp at 26-10th Avenu South, the area proposed to be assessed being 1011 First Street South described as Lots 14, 15 & 16, also Lots 18 through 22 incl said Blk 6 & th S 15 ft of Lot 23 said Blk 6 incl the adj 1/2 of the vac alley (24-117-22 34 0123) and Lot 17 incl 1/2 vac alley (24-117-22 34 0049) total cost being $$391,998 for construction and $12,000 for maintenance. 11. Stump removal at 1020 Oakridge Road, N 80 ft of SE 1/4 of NW 1/4 of SE 1/4 except road, Sec 13 T 117 R 22 (13-117-22 42 0012), total cost being $271.00. 12. Tree removal at l25-12th Avenue South, Lot 12, Block 10, West Minneapolis (24-117-22 34 0108), total cost being $511.20. 13. Weed removal at 633-8th Avenue South, Lot 16, Block 61 West Minneapolis (P.I.D. 25-117-22 13 0075) and Lot 15 Block 61, West Minneapolis (P.I.D. 25-117-22 13 0074), total cost being $104.00. 14. Snow removal at 805 Mainstreet, Lot 9, Block 67, West Minneapolis 2nd Division (P.I.D. 24-117-22 42 0067), total cost being $130.20. 15. Delinquent utility bill at 402-10th Avenue North, Lot 3 and that part of Lot 2 lying S of N 19-6/10 ft thereof, Block 105, West Minneapolis Second Division (P.I.D. 24-117-22 21 0006), total cost being $332.00. 16. Delinquent utility bill at 1702 Mainstreet, North 122 ft of Lots 6, 7 and the E 25 ft of Lot 5, Block 2, Boulevard Manor (P.I.D. 23-117-22 44 0036), total cost being $396.60. 17. Delinquent utility bill at 25-9th Avenue North, N 40 ft of Lot 18, Block 67, West Minneapolis 2nd Division (P.I.D. 24-117-22 42 0075), total cost being $346.50. 18. Delinquent utility bill at 221-13th Avenue North, Lot 16 and N 25 ft of Lot 15, Block 91, West Minneapolis Second Division (P.I.D. 24-117-22 24 0080) total cost being $199.60.