Loading...
1985-3208 ., a, o .CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 85-3208 RESOLUTION FOR HEARING ON PROPOSED SPECIAL ASSESSMENTS WHEREAS~ by Resolution No. 85-3203 passed and adopted by the Council on July 16th, 1985, the City Clerk and Engineer were directed to prepare proposed assessments of the costs of improving various streets, avenues, and thoroughfares and miscellaneous improvements in the City of Hopkins, all as more fully described in Exhibit A. hereto attached and attached to '41 Resolution No. 85-3203 and made apart hereof, and WHEREAS, the said Clerk has notified the Council that such proposed assessments have been completed and filed in his office for public inspection. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, as follows: 1. A hearing shall be held on September 17th, 1985, to pass upon such proposed assessments, and at such time and place, all persons owing property affected by such improvements and assessments will be given an opportunity to be heard with reference to such assessments. 2. The City Clerk is hereby directed to cause a Notice of the Hearing on the proposed assessments to be published at least two weeks prior to the . hearing, and he shall state in the Notice the total .cost of each of such improvements. Passed and adopted by the City Council of the City of Hopkins, this 20th day of August, 1985. J. SCOTT RENNE, Ci ty Cl erk ELLEN LAVIN, Mayor JERRE A. MILLER, Ci ty Attorney ~ , ~o E X H I BIT A 1. Project 82-07. Curb and Gutter on Tenth Street and Feltl Court from Eleventh Avenue to Eleventh Street South, total cost being $12,792.60 and the area proposed to be assessed being: Lot 1, Block 1 and Lot 1 Block 2, both in Opus II Ninth Addition. Project 82-08. Street surfacing on Tenth Street and Feltl Court from Eleventh Avenue to Eleventh Street South, total cost being $60,589.62 and the area proposed to be assessed being: Lot 1, Block 1 and Lot 1, Block 2, both in Opus II Ninth Addition. Project 82-08A. Lighting and Landscaping on Tenth Street and Feltl Court from Eleventh Avenue to Eleventh Street South, total cost being $35,501.36 and the area proposed to be assessed being: Lot 1, Block 1 and Lot 1, Block 2, both in Opus II Ninth Addition. 2. 3. 4. Project 82-09. Storm sewer on Tenth Street and Feltl Court from Eleventh Avenue to Eleventh Street South, total cost being $60,255.98 of which none is to be assessed. o 5. Project 83-02. Concrete alley east of Tenth Avenue South between Sixth Street South and Seventh Street South, total cost being $10,853.18 of which $9,031.00 is proposed to be assessed to Lots 13 thru 24, inclusive, Block 59, West Minneapolis and Units 1 thru 88, inclusive, Condominium No. 398, Westbrooke-North Condominium. 6. Project 84-01. Concrete curb, gutter and driveways on the north service road of State Highway No.7 from Robinwood Lane to County Road #73, total cost being $13,079.77 of,which $6,932.45 i.s proposed to be assessed to Tracts A, B, C, and G, Registered Land Survey No. 1053 and Lot 2, Block 1, Union Oil Second Addition I o 7. Project 84-02. Concrete alley between 16th Avenue North and 17th Avenue North from 4th Street North to 16th Avenue North, total cost being $11,224.04 of which $9,296.17 is proposed to be assessed to Lots 1 thru 7, inclusive, and Lots 14 thru 18, inclus'ive, Block 2, Gibb1s First Addition to West Minneapolis. 8. Project 84-05. Watermain extension on the east' and north side of Chapel View, total cost being $46,089.82 and the area proposed to be assessed being: (P.I.D. #24-117-22 12 0006) That part of the Northwest Quarter of Northeast Quarter lying west of east 486 87/100 feet thereof and southerly of State Highway No.7 and east of Gethsemane Road; (P.I.D. # 24-117-22 12 0007) That part of the north 1066 9/10 feet of east 486 87/100 feet of Northwest Quarter of Northeast Quarter lying south of State Highway No.7, except road; (P.I.D. #24-117-22 12 0008) South 200 feet of north 1266.9 feet of east 486.87 feet of Northwest Quarter of Northeast Quarter and south 45.22 feet of west 322.87 feet of east 486.87 feet of Northwest Quarter of Northeast Quarter, except road; (P.I.D. #24-117-22 13 0004) Commencing at intersection of northerly line of Minnetonka Mills Road and center line of Gethsemane Road, thence north along said center line to north line of Southwest Quarter of Northeast Quarter, thence east to a point 164 feet west from northeast corner thereof, thence south 179 78/100 feet, thence west 84 feet, thence south to northerly line of Minnetonka Mills Road, thence northwesterly to beginning, except road; (P.I.D. #24-117-22 13 0005) That part of west 84 feet of east 248 feet of Southwest Quarter of Northeast Quarter lying south of north 179.78 feet thereof and northerly of Minnetonka Mills Road; all the above properties in Section 24, Township 117, Range 22. o h o 9. Project 85-02. Retaining wall on the north side of 146-15th Avenue North, total cost being $4,197.50 proposed to be assessed to N. 45 feet of Lot 1, Block 5, Gibb's First Addition to West Minneapolis. 10. Tree and stump removal at the following locations: 1. 301-10th Avenue North, Lot 13, Block 99 West Minneapolis Second Division, total cost being $286.00. 2. 22-6th Avenue North, Lot 5, Block 65 West Minneapolis Second Division, total cost being $156.00. 3. 630 West Park Valley Drive, Lot 9, Block 3 Park Valley Second Addition, total cost being $329.00. 4. 101-12th Avenue North, Lot 11, Block 77 West Minneapolis Second Division, total cost being $339.00. 5. 203 Wilshire Walk, Lot 2, Block 2 Knollwood, total cost being $223.00. o o . ~=t-- .~ -c-