.CITY OF HOPKINS
HENNEPIN COUNTY, MINNESOTA
RESOLUTION NO. 85-3208
RESOLUTION FOR HEARING ON PROPOSED SPECIAL ASSESSMENTS
WHEREAS~ by Resolution No. 85-3203 passed and adopted by the Council
on July 16th, 1985, the City Clerk and Engineer were directed to prepare
proposed assessments of the costs of improving various streets, avenues,
and thoroughfares and miscellaneous improvements in the City of Hopkins,
all as more fully described in Exhibit A. hereto attached and attached to
'41
Resolution No. 85-3203 and made apart hereof, and
WHEREAS, the said Clerk has notified the Council that such proposed
assessments have been completed and filed in his office for public inspection.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA,
as follows:
1. A hearing shall be held on September 17th, 1985, to pass upon such
proposed assessments, and at such time and place, all persons owing property
affected by such improvements and assessments will be given an opportunity
to be heard with reference to such assessments.
2. The City Clerk is hereby directed to cause a Notice of the Hearing
on the proposed assessments to be published at least two weeks prior to the
. hearing, and he shall state in the Notice the total .cost of each of such
improvements.
Passed and adopted by the City Council of the City of Hopkins, this
20th day of August, 1985.
J. SCOTT RENNE,
Ci ty Cl erk
ELLEN LAVIN,
Mayor
JERRE A. MILLER,
Ci ty Attorney
~
,
~o
E X H I BIT A
1.
Project 82-07. Curb and Gutter on Tenth Street and Feltl Court from
Eleventh Avenue to Eleventh Street South, total cost being $12,792.60
and the area proposed to be assessed being: Lot 1, Block 1 and Lot 1
Block 2, both in Opus II Ninth Addition.
Project 82-08. Street surfacing on Tenth Street and Feltl Court from
Eleventh Avenue to Eleventh Street South, total cost being $60,589.62
and the area proposed to be assessed being: Lot 1, Block 1 and Lot 1,
Block 2, both in Opus II Ninth Addition.
Project 82-08A. Lighting and Landscaping on Tenth Street and Feltl Court
from Eleventh Avenue to Eleventh Street South, total cost being $35,501.36
and the area proposed to be assessed being: Lot 1, Block 1 and Lot 1,
Block 2, both in Opus II Ninth Addition.
2.
3.
4.
Project 82-09. Storm sewer on Tenth Street and Feltl Court from Eleventh
Avenue to Eleventh Street South, total cost being $60,255.98 of which
none is to be assessed.
o
5. Project 83-02. Concrete alley east of Tenth Avenue South between Sixth
Street South and Seventh Street South, total cost being $10,853.18 of
which $9,031.00 is proposed to be assessed to Lots 13 thru 24, inclusive,
Block 59, West Minneapolis and Units 1 thru 88, inclusive, Condominium
No. 398, Westbrooke-North Condominium.
6. Project 84-01. Concrete curb, gutter and driveways on the north service
road of State Highway No.7 from Robinwood Lane to County Road #73, total
cost being $13,079.77 of,which $6,932.45 i.s proposed to be assessed to
Tracts A, B, C, and G, Registered Land Survey No. 1053 and Lot 2, Block 1,
Union Oil Second Addition I
o
7. Project 84-02. Concrete alley between 16th Avenue North and 17th Avenue
North from 4th Street North to 16th Avenue North, total cost being $11,224.04
of which $9,296.17 is proposed to be assessed to Lots 1 thru 7, inclusive,
and Lots 14 thru 18, inclus'ive, Block 2, Gibb1s First Addition to West
Minneapolis.
8. Project 84-05. Watermain extension on the east' and north side of Chapel
View, total cost being $46,089.82 and the area proposed to be assessed
being: (P.I.D. #24-117-22 12 0006) That part of the Northwest Quarter
of Northeast Quarter lying west of east 486 87/100 feet thereof and
southerly of State Highway No.7 and east of Gethsemane Road; (P.I.D. #
24-117-22 12 0007) That part of the north 1066 9/10 feet of east 486 87/100
feet of Northwest Quarter of Northeast Quarter lying south of State Highway
No.7, except road; (P.I.D. #24-117-22 12 0008) South 200 feet of north
1266.9 feet of east 486.87 feet of Northwest Quarter of Northeast Quarter
and south 45.22 feet of west 322.87 feet of east 486.87 feet of Northwest
Quarter of Northeast Quarter, except road; (P.I.D. #24-117-22 13 0004)
Commencing at intersection of northerly line of Minnetonka Mills Road and
center line of Gethsemane Road, thence north along said center line to north
line of Southwest Quarter of Northeast Quarter, thence east to a point 164
feet west from northeast corner thereof, thence south 179 78/100 feet, thence
west 84 feet, thence south to northerly line of Minnetonka Mills Road, thence
northwesterly to beginning, except road; (P.I.D. #24-117-22 13 0005) That
part of west 84 feet of east 248 feet of Southwest Quarter of Northeast Quarter
lying south of north 179.78 feet thereof and northerly of Minnetonka Mills
Road; all the above properties in Section 24, Township 117, Range 22.
o
h
o
9. Project 85-02. Retaining wall on the north side of 146-15th Avenue
North, total cost being $4,197.50 proposed to be assessed to N. 45
feet of Lot 1, Block 5, Gibb's First Addition to West Minneapolis.
10. Tree and stump removal at the following locations:
1. 301-10th Avenue North, Lot 13, Block 99 West Minneapolis Second
Division, total cost being $286.00.
2. 22-6th Avenue North, Lot 5, Block 65 West Minneapolis Second Division,
total cost being $156.00.
3. 630 West Park Valley Drive, Lot 9, Block 3 Park Valley Second
Addition, total cost being $329.00.
4. 101-12th Avenue North, Lot 11, Block 77 West Minneapolis Second
Division, total cost being $339.00.
5. 203 Wilshire Walk, Lot 2, Block 2 Knollwood, total cost being $223.00.