Loading...
PARKING Last summer the City Council considered the repairs of the publ1C park1ng .lots south of Excelsior Avenue between 8th and 9th (west of Burschs Restaurant and also between the Blake and Drill Cl1n1cs. The Eng1neers report proposed that conslderatlon be glven to pav1ng the north-south public alley w1th concrete, Slnce th1S alley needs repalr. The proposed proJect was carrled over to 1985 because hearings are requlred for any work that may be assessed The cost of the concrete alley would probably be assessed to abuttlng property. The Clty would pay 20% of the constructlon cost. The estlmated cost per assessable foot is $13.52. For example, a 50 foot lot would be charged 50 x $13.52 per front foot or $676.00. A 100 foot lot would be $1352.00. For further informatlon, please call me at 935-8474 at your convenlence. John J. Strojan Clty Engineer 4-1-85 IL SIOfl ~ ] 0 0 .. [ '" J 0 [ L~ .. . J/II// ! ] j 0 C ../ ... > r ~J- ~ m 0 F -..... '- [ 0 ... > ~ ] 0 ... > 0 ~ 1 1 ~ d ...