PARKING
Last summer the City Council considered the repairs of the publ1C park1ng
.lots south of Excelsior Avenue between 8th and 9th (west of Burschs Restaurant
and also between the Blake and Drill Cl1n1cs. The Eng1neers report proposed that
conslderatlon be glven to pav1ng the north-south public alley w1th concrete, Slnce
th1S alley needs repalr. The proposed proJect was carrled over to 1985 because
hearings are requlred for any work that may be assessed
The cost of the concrete alley would probably be assessed to abuttlng property.
The Clty would pay 20% of the constructlon cost. The estlmated cost per assessable
foot is $13.52. For example, a 50 foot lot would be charged 50 x $13.52 per front
foot or $676.00. A 100 foot lot would be $1352.00.
For further informatlon, please call me at 935-8474 at your convenlence.
John J. Strojan
Clty Engineer
4-1-85