Loading...
Exhibit A- Proposed Special AssessmentsE X H I B I T A 1. Concrete curb and gutter on Texas Avenue from Lake Street to State Highway No. 7 and on Division Street from Texas Avenue to a point 800 feet west, total cost of the project being $9,600.11 and the properties to be assessed being: Lots 1 thru 43., inclusive, Lot 68, Lots 71, 72 and 73, all in Auditors Subdivision No. 239; Lots 2 thru 11, inclusive, Auditors Subdivision No. 363; Lots 1 thru 9, inclusive, Q. R. Smith's Addition to Hopkins. 2. Bituminous surfacing on Texas Avenue from Lake Street of State Highway No. 7 and on Division Street from Texas Avenue to a point 800 feet west, total cost of the project being $27,484.23 and the properties proposed to be assessed being: Lots 1 thru 43, inclusive, Lot 68, Lots 71, 72 and 73, all in Auditors Subdivision No. 239; Lots 2 thru 11, inclusive, Auditors subdivision No. 363; Lots 1 thru 9, inclusive, Q. R. Smith's Addition to Hopkins. 3. Miscellaneous concrete repairs and driveways on Texas Avenue from Lake Street to State Highway No. 7 and on Division Street from. Texas Avenue to a point 800 feet west, total cost of the project being $12,333.54 of which $6324.55 is proposed to be assessed to the following properties: Lots 1 thru 12, inclusive and Lots 31 thru 35 inclusive, Lot 68, Auditors Subdivision No. 239; Lot 1, Q. R. Smith's Addition to Hopkins. 4. Tree removal at the following 102 Van Buren Avenue South, total cost being $182.26; 226 Van Buren Avenue North, cost being $248.20; 45 Harrison Avenue South, Lots total cost being $85.94; 5 Webster Place, Lots 13 and 14, Block $487.01; 337 -21st Avenue North, Lots 24 and 25, Division, total cost being $160.82; 26 -18th Avenue South, Lot 10, Block 1, $58.84; 29 -18th Avenue South, Lot 14, Block $144.29; 608 Minnetonka Mills Road, Lots 10 and 11, Second Division, total cost being $282.64; 370 Althea Lane, Lot 2, Block 3, Campbells $332.24; 41 -16th Avenue North, Lot 24, Block 8, Gibbs First Addition to West Minneapolis, total cost being $245.57; 26 -7th Avenue North, Lots 3 and 4, Block 66, West Minneapolis Second Division, total cost being $473.43; 733 -8th Avenue South, Lots 31, 32 and 33, Block 7, West Minneapolis Annex total cost being $104.60; 43 -6th Avenue South, Lot 22, $88.25; Property owned by Berglund and Johnson described as follows: West 1/2 of Southwest Quarter of Southwest Quarter in Section 25, Township 117, Range 22, total cost being $1,506.73. locations: Lot 1, Block 35, West Minneapolis Center Lot 4, Block 2, Stevens Oakwood Park, total 23 and 24, Block 19, West Minneapolis Center, 7, Bellgrove, total cost being Block 4, West Minneapolis Third Boulevard Manor, total cost being 2, Boulevard Manor, total cost being Block 102, West Minneapolis Addition, total cost being Block 1, West Minneapolis, total cost being 5. Snow removal at the following locations: 1521 West Excelsior Avenue, Lot 15, Block 8, Gibbs First Addition to West Minneapolis, total cost being $80.68; 317 Excelsior Avenue West, West 96 feet of Lot 14, Block 5, Parkridge, total cost being $37.96; 817 Excelsior Avenue West, Lot 12, Block 67, West Minneapolis, total cost being $9.49; 525 Excelsior Avenue West, Lots 9, 10 and 11, Block 64, West Minneapolis Second Division also that part of Lot 3, Auditors Subdivision No. 242 lying south of westerly extension of north line of Lot 4 of said Auditors Subdivision; total cost being $38.64; 818 Excelsior Avenue West, Lot 2, BLock 4, West Minneapolis, total cost being $9.50; 802 Excelsior Avenue West, Lot 6, Block 4, West Minneapolis, total cost being $18.98. O 6. Repair water service at 816 Excelsior Avenue West, Lot 3, Block 4, West Minneapolis, total cost being $2,119.15. 7. Storm sewer on Texas Avenue from Lake Street to State Highway No. 7 and on Division Street from Texas Avenue to a point 800 feet west, total cost being $12,409.50 of which none is proposed to be assessed.