Bids for installation of sewerQ.R.S. CORPORATION
S.M. HENTGES SONS
G. L. CONTRACTING INC.
BERGHORST PLUMBING HTG.
WIDMER BROS. INC.
SULLIVAN'S SERVICES INC.
Engineer recommends: Q.R.S. has successfully completed
several jobs for the City, the most recent being sub-
contractor on the Year II Northside Project and on the
9th Avenue South reconstruction. Recommend award to
Q.R.S. Corporation.
TABULATION OF BIDS
FOR
INSTALLATION OF SANITARY SEWER
Bids Opened September 28, 1982 10:00 A.M.
16,401.00
16,482.50
18,395.00
18,523.00
18,843.75
20,568.00
0
O
(Official Publication)
CITY OF HOPKINS
Hennepin County, Minnesota
NOTICE OF BIDS FOR THE INSTALLATION
OF SEWER
SEALED BIDS will be received by the City Manager at the City Hall, Hopkins,
Minnesota, until Tuesday, September 28, 1982, at 10:00 A.M., local time, and then
and there opened and publicly read, and as soon as possible thereafter, award of
a contract will be made for the above work.
Plans, specifications and further details are available at the office of the
City Engineer. Approximate major quantities of work are 318 feet 8" PVC pipe.
Each bid must be accompanied by a Cashier's Check, Certified Check, or
Standard Bidder's Bond written by a corporate surety certified by the Minnesota
State Insurance Commission at ten percent (10 of the total bid price, payable
to the City of Hopkins., as a guarantee that the bidder will, if successful, promptly
execute a satisfactory contract for the faithful performance of the work covered by
this specification.
The successful bidder shall, within 10 days after oral or written notice by the
City, that his bid is accepted (which time may be extended in writing by the City for
satisfactory cause shown by the bidder) execute a written contract and furnish a
faithful performance surety bond in the sum equal to 100% of the bid, which bond
shall also secure the City for a period of not less than one year from date of contract
completion against any and all defective materials and workmanship and for timely pay
ment of all contractor's bills.
Upon the award of the contract the checks or bidder's bonds of the unsuccessful
bidders will be returned to them. Upon the filing of the contract and performance
bond, the check or bid bond of the successful bidder will be returned to him.
The City provides proposal forms which are to be used. Each proposal must be
plainly marked, "PROPOSAL FOR THE FURNISHING OF LABOR, TOOLS, EQUIPMENT AND MATERIAL
NECESSARY FOR THE INSTALLATION OF SEWERS and addressed to the City of Hopkins,
Minnesota.
The City reserves the right to reject any and all bids or parts thereof. Any
incomplete bid will be rejected.
In case of default the City may have the work done by others, and hold the
original bidder or contractor liable for increased costs.
To be published in the HOPKINS SUN, September 15„1982.
To be published in the CONSTRUCTION BULLETIN, September 10, 1982.
CITY OF HOPKINS
et CL-CL'n
William P. Craig, City Manager