SITE PLAN REVIEW - SUPERV ALU
Proposed Action
Staff recommends the following motion: Move to deny a site plan to construct an addition to the
building at 300 Second Avenue South and direct staff and the City Attorney to prepare findings
of fact to adopt at the April 19 City Council meeting.
At the Zoning and Planning meeting, Ms. Halverson moved and Mr. Kjos seconded a motion to
adopt Resolution RZ05-9, recommending denial of a site plan to construct an addition to the
building at 300 Second Avenue South. The motion was approved on a 3-2. Mr. Aarness and
Ms. Aristy voting nay.
Overview
Supervalu is proposing to construct a 130,000-square-foot addition to the existing building at 300
Second Avenue South. The proposed addition will be located on the east side of the existing
building. Supervalu is proposing to remove the existing parking on the east side and move that
parking to the south side. The parking area will be for employees, and there will be two access
points on Fifth Street into tlieparking area.
When the existing building was constructed, a height variance was granted. If the building
addition is to match the existing building, a height variance will have to be granted. The
applicant has also applied for a front yard setback variance.
Primary Issues to Consider
. What is the zoning of the property, and how has the Comprehensive Plan
designated the subject site?
. What are the specifics of the development?
. What is the staff recommendation?
· What was the discussion at the Zoning and Planning meeting?
Supportin2: Documents
. Analysis of issues
. Site plans
. Parking/traffic study
Financial Impact: $ NI A Budgeted:
Related Documents (CIP, ERP, etc.):
Notes:
Y/N
Source:
CR05-48
Page 2
Primary Issues to Consider.
. What is the zoning of the property, and how has the Comprehensive Plan
designated the subject site?
The zoning of the property is 1-2, General Industrial. The Comprehensive Plan has designated
this site as Industrial. The proposed development complies with both documents.
. What are the specifics of the development?
Building
The proposed 130,000-square-foot addition will be added to the east side of the existing building.
The exterior will match the existing building.
Parking
The parking has been moved to the south side of the site. The site is short 52 parking spaces
with the relocation of the parking lot. Supervalu can provide a proof of parking area if more
parking is needed in the future.
Landscaping
The landscape indicates landscaping on the south side will remain except for the area where the
new entrances will be located. The applicant is required to plant 65 additional plantings. The
plans indicate that Supervalu will provide additional plantings for the city's use.
Exterior
The exterior will be the same as the existing building, pre-cast concrete panels.
Access
Truck access to the site will not change. The existing truck access to the site is from Fifth
Avenue. The parking lot will be moved to the south side of the building. Access to this parking
area will be from Fifth Street. A traffic/parking study was completed for the new access points.
The intersections will function at an acceptable level. The traffic study indicated there will be
additional traffic on Fifth Street west of Second Avenue.
Setbacks
The building is required to have a 20-foot setback on the east side. The plan indicates a 10' 6"
setback on the east side. The applicant has applied for a front yard setback variance. No other
setbacks are affected.
CR05-48
Page 3
Engineering/Public Works
Storm Drainage
The drainage cales show a decrease in runoff :from the existing to proposed condition. This is
due to 2 factors. 1) There is an additional 0.65 acre unaccounted for in their computations; 2)
the time of concentration is longer for the proposed condition, which has the effect of reducing
the rainfall intensity for the calculations.
I recommend having the cales resubmitted for review clarifying and correcting these issues.
As a general comment, there are storm sewers crossing each other with some going to the pond
and others straight to the storm sewer system. It may make sense to try and limit the crossovers
by redirecting some of the roof drainage from the one outlet to the other while maintaining the
same total discharge for each.
Water System
Should the intemalloop 12" water main be connected to the public line on Fifth Street? It would
likely improve flows for the area in general.
Grading looked fine.
Fire Marshal
The Fire Marshal has reviewed the plans. He has found them acceptable.
Height
The Zoning Ordinance allows a maximum height of 45 feet. The proposed height at the highest
point is 47.5 feet. The applicant has applied for a height variance of 12.5 feet.
Watershed District
The Watershed District will have to approve this addition.
Surrounding Uses
The site is surrounded by residential on the south, Highway 169 to the east, SuperValu
perishables building to the west and industrial uses to the north.
. What is the staff recommendation?
.
Staff recommended approval of the south side addition and still feels that it would be a preferred
option to the east side addition. The east side brings traffic and parking a lot closer to the
neighborhood. The east side option also does not allow additional space for the additional
CR05-48
Page 4
landscaping that was proposed.. Fifth Street will still function at levels of service that are
acceptable with the east side addition, but it will bring more traffic to Fifth Street.
. What was the discussion at the Zoning and Planning meeting?
Ms. Anderson reviewed the proposed site plan and the request for the variances. Bob King,
representing Supervalu, appeared before tl1e meeting and reviewed the site plan and the
vanances.
The following individuals spoke at the public hearing:
.
Duffy Bren 626 West Park Valley Drive - opposed to east side addition
Mike Reinitz 533 Fifth Avenue South - in favor of east expansion
Don Roesner 618 West Park Valley Drive - opposed to east side addition
Ruby Olson - 625 Fifth Avenue South - opposed to the variances
Curt Wellumson 605 West Park Valley Drive - concerned about traffic with east side addition
Pam Tanaka 605 East Park Valley Drive - opposed to east side addition
Sandy Lien 629 Fifth Avenue South - opposed to east side addition
Kathy Understad 408 Seventh Street South - opposed to east side addition
Roger Peterson 513 Fifth Avenue South - in a quandary which addition would be better
Ellen Levernier - 638 West Park Valley Drive - concerned about the traffic with the east side
addition.
Alternatives.
1. Approve the site plan to construct an addition to the building at 300 Second Avenue South.
By approving of the site plan to construct an addition, the applicant will be able to construct
the addition as proposed. If the City Council considers this alternative, findings will have to
be identified that support this alternative.
2. Deny the site plan to construct an addition to the building at 300 Second Avenue South. By
denying the addition, the applicant will not be able to construct the addition as proposed.
3. Continue for further information. If the City Council indicates that further information is