State Aid 5-year Estimated Construction Planr --r --i ;ice ��Zf� I .7, 7 -!ll1 l i i I M Ifs •.Carr CITY OF HOPKINS INTER--OFFICE MEMO City Council through TO Mr. Craig, City Manager DATE December 10 19 82 FROM Gordon Anderson SUBJECT State Aid 5 year estimated construction program. Attached is the estimated construction and other expenditures which is anticipated to be paid out of State Aid Highway Funding in 1983 1989. This should fulfill the requirements as outlined in Gordon lay letter of 11/17/82 attached. Council approval is required as submitted or amended. If a plan is not on file with State Aid, portions of future allotments will be subtracted. The large cost of the llth Avenue viaduct may require some bonding, pledging future allotments. This is allowable under State Aid regulations. Construction costs of Milwaukee Street is contingent upon the City accepting the County Road turnback in the present condition. Year of Expenditure. Termini Project Description Estimated State Aid Expenditure 1979 on Blake Road (CSAH20) County Road widening surfacing. City partici- pation C &G, walks, traffi lights, storm sewer.Final reconsiliation pending. 20,000 From_5 xcel si or Aye jCSAH3) To State Highway #7 Length 0.927 1983 on Henn. Co. CSAH 18 Storm sewer Traffic lights $125,000 From 2nd St. N.E. To N. City Limits Length 0.50 1983 on llth St.So.(MSAH348) Complete construction together with City of Minnetonka $150,000 From llth Ave. So. To W. City Limits Length 0.25 1983 On Excelsior Ave.(CSAH3) Widening, curb and gutte storm sewer, traffic lights. 75,000 From Hawthorne Ave. To E. City Limits Length 0.331 .1983 on llth Ave.So.(MSAH346) Traffic lights 25,000 From at 5th Ave.So(MSAH354) To Length 0 1984 On llth Ave.So. (MSAH346) Reconstruction C G, surfacing 20,000 From 6th St.So. (MSAH354) To 300' South Length .057 MUNICIPAL STATE -AID STREET SYSTEM 5 -Year Construction Program For (State Aid Expenditures Only) REVENUE Present State Aid Construction Balance June 30, 19 g/ 'T 7 J 0 Estimated Annual Construction Allotment 0 to ,3 0- X 4 8 T 53 G Estimated Total State Aid Allotment for Programming Purposes I f 3 0 9 3 74' ESTIMATED EXPENDITURES Year of Expenditure Termini Project Description Estimated State Aid Expenditure 1984 On 7th St.So. 1MSAN347) Reconstruction C G, Surfacing 50,000 From llth Ave.So.(MSAH346 To 9th Ave.So. Length .125 1984 -1989 On llth Ave.So.(MSAH346) Construct RR•overpass Construct. sidewalks Reconstruct roadway C G Surfacing 1,400,000_ From 5th St.So. (MSAH354) To 400' south Length 07 6 1984 on Milwaukee St. (CR61) Complete reconstruction RR crossing, C G storm sewer 100,000 From Exce lsior Ave(CSAH3) To Washington AveSo(CSAH18)Surfacing, Length 1985 On 17th Ave. (MSAH349) Reconstruction 30,000 From State Highway #7. To Co. Rd. 3 Length, On From To Length On From To Length On From To Length On From To Length ESTIMATED EXPENDITURES November 17, 1982 FROM Minnesota Department of Transportation Transportation Building St. Paul, Minnesota 55155 Municipal. Engineers Gordon M. Fay, Director SUBJECT: Continuation of the 5 -Year Construction Program Reporting The Municipal Screening Committee at its October 19 and 20, 1982 meeting considered the present directive which states that: By January 1, 1983, each municipality shall submit a revised 5 -year construction program which has been approved by their city council. This program shall include sufficient projects to utilize all existing and anticipated funds accruing curing the life of the program. The program will be updated at 3- year intervals and a review trade at that time to ascertain program implementation. The requirements were reviewed and it was C'eterml that this information is valuable to the Unencumbered Construction Fund Subcommittee, as well as useful to the City Engineers in making the city councils more aware of State Aid funding. To comply with this directive, each city is requested to submit a council approved, itemized 5 -year program of proposed construction by priority, showing the termini, length, estimated cost, and tyre of anticipated pro jects on the enclosed forms. Include only State Aid expenditures in this report. This submittal should be returned to the District State Aid Engineer. by January 1, 1983. We are ret.urni a copy of your previous 5 -year construction program to those cities which submitted a report in 1979. These reports could be help- ful in preparing this year's submittal. I rk /7" ordo>t M., Fay, Dirt. :r.or Office of State laid Enclosure: 1979 5- -Year Construction P.'oc ;ram An Equal Opportunity Employer Phone 612 -296 -9872