Loading...
Notice/ Tabulation of Bids for the Installation of Watermains(Official Publication) CITY OF HOPKINS Hennepin County, Minnesota NOTICE OF BIDS FOR THE INSTALLATION OF WATERMAINS SEALED BIDS will be received by the City Manager at the City Hall, Hopkins, Minnesota, until Thursday, March 12, 1981 at 10:00 A.M., local time, and then and there opened and publicly read, and as soon as possible thereafter, award of a contract will be made for the above work. Plans, specifications and further details are available at the office of the City Engineer. Approximate major quantities of work are 1650 feet 16" D.I.P. and 1100 feet 8" D.I.P. Each bid must be accompanied by a Cashier's Check, Certified Check, or Standard Bidder's Bond written by a corporate surety certified by the Minnesota State Insurance Commission at ten percent (10 of the total bid price, payable to the City of Hopkins, as a guarantee that the bidder will, if successful, promptly execute a satisfactory contract for the faithful performance of the work covered by this specification. The successful bidder shall, within 10 days after oral or written notice by the City, that his bid is accepted (which time may be extended in writing by the City for satisfactory cause shown by the bidder) execute a written contract and furnish a faithful performance surety bond in the sum equal to 100% of the bid, which bond shall also secure the City for a period of not less than one year from date of contract completion against any and all defective materials and workmanship and for timely payment of all contractor's bills. Upon the award of the contract the checks or bidder's bonds of the unsuccessful bidders will be returned to them. Upon the filing of the contract and performance bond, the check or bid bond of the successful bidder will be returned to him. The City provides proposal forms which are to be used. Each proposal must be plainly marked, "PROPOSAL FOR THE FURNISHING OF LABOR, TOOLS, EQUIP- MENT AND MATERIAL NECESSARY FOR THE INSTALLATION OF WATERMAINS and addressed to the City of Hopkins, Minnesota. The City reserves the right to reject any and all bids or parts thereof. Any incomplete bid will be rejected. In case of default the City may have the work done by others, and hold the original bidder or contractor liable for increased costs. To be published in the HOPKINS SUN, February 25, 1981. To be published in the CONSTRUCTION BULLETIN, February 27, 1981. CITY OF HOPKINS William P. Craig, City Manic Corrected Total Engineer's Recommendation: Low Bid of Burchville Construction Inc. J Burchville Parrott Jedlicke WALHUNT OPFIE NOLi,;,ND Specification Estimated Number Item Unit Quantities Unit Price Total Amounts Unit Price Total Amounts Unit Price Total Amount Unit Price Unit Price Unit Price 2101.513 Clear and Grub R/W Lump Sum 3,600.00 3,600.00 800.00 800.00 500.00 500.00 500.00 525.32 1,000.00 2611.4A 6" Ductile Iron Pipe Ln. Ft. 48 25.60 1,228.80 12.41 595.68 15.00 720.00 15.20 18.17 13.50 2611.4A 8" Ductile Iron Pipe Ln. Ft. 1020 10.45 10,659.00 14.16 14,443.20 19.00 19,380.00 17.00 17.84 15.00 2611.4A 16" Ductile Pipe Ln. Ft. 1685 18.35 30,919.75 24.90 41,956.51 23.00 38,755.00 26.50 29.33 25.20 2611.4B 6" G. V. Each 8 248.00 1,984.00 309.61 2,476.88 350.00 2,800.00 235.00 290.79 500.00 2611.48 8" G. V. Each 3 370.00 1,110.00 352.17 1,056.51 450.00 1,350.00 325.00 395.86 600.00 2611.48 16" Butterfly Valve Each 1 1,240.00 1,241.00 1, ?02.93 1,202.93 1,600.00 1,600.00 1,150.00 1,311.28 1,850.00 2611.4E Install 5" Hydrant Each 4 200.00 800.00 125.00 500.00 300.00 1,200.00 250.00 138.16 500.00 2611 .41 Cast Iron Fittings Lbs. 3450 1.00 3,450.00 1.00 3,450.00 1.00 3,450.00 1.00 0.95 1.20 2621.4A4 30" R.C. Carrier Pipe C1. III Ln. Ft. 140 72.85 10,199.00 27.32 3,824.80 40.00 5,600.00 31.00 31.28 60.00 2621.4A 8" Ductile Iron Sewer Pipe Ln. Ft. 130 21.85 2,840.50 16.46 2,139.80 20.00 2,600.00 17.00 23.21 30.00 TOTAL 68,032.05 72,446.30 77,955.00 CITY OF HOP` .TABULATION OF BIDS FO WAT0RMAIN Project 80:11 78,227.10 85,067.30 85,500.00 Ro -So PCI NORTHDALE G.L. H B H JOHNSON DELUXE .SMDMARK ERICKSON ORS 0 P Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Pr Unit Price Unit Price Unit Price 3,803.00 300.00 2,500.00 5,000.00 734.00 500.00 256.00 1,600. 3,833.00 500.00 1,800.00 19.50 15.00 14.10 18.00 14.75 20.00 10.75 20.00 13.95 28.00 31.50 22.00 21.25 23.00 20.00 12.50 24.00 28.50 20.50 29.86 25.00 35.80 28.30 30.00 30.00 28.00 26.00 35.00 33.00 40.00 26.77 33.00 36.30 125.00 310.00 240.00 400.00 335.00 322.00 282.00 350.00 302.00 775.00 305.00 425.00 450.00 340.00 500.00 425.00 412.00 375.00 425.00 422.00 525.00 410.00 1,400.00 1,500.00 1,250.00 1,500.00 1,750.00 1,306.00 1,225.00 1,450.00 1,576.00 1,800.00 1,285.00 100.00 200.00 220.00 500.00 500'.00 600.00 300.00 300.00 1,000.00 350.00 350.00 1.00 1.00 1.00 2.00 1.73 1.00 1.10 1.10 1.20 1.50 1.50 ;31.50 60.00 50.00 40.00 128.00 50.00 95.00 50.00 127.00 100.00 35.00 13.00 18.00 39.00 32.00 76.50 30.00 11.25 24.50 8.51 25.00 32.05 116.349.00 121.590.00 90,;656.50 93,565.00 97,776.80* 98,304.00 99,540.50 106,783.00 109,804.50* 111,575.00 112,351.55