Noitice/ Tabulation of Bids for Rebid of Public Works ConstructionTABULATION OF THIRTEEN BIDS OF THIRTEEN RECEIVED
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
ROJECT NO. 1981 -10 FILE NO. 15401
BID OPENING 2:00 P.M., C.S.T. THURSDAY, NOVEMBER 19, 1981
BONESTROO, ROSENE, ANDERLIK ASSOCIATES, INC. Consulting Engineers
2335 West Trunk Highway 36 SAINT PAUL, MINNESOTA 55113
Description
PROPOSAL ITEM
BASE BID
I /we propose to completely construct the Hopkins Public Works Building including all General, Mechanical, Electrical construction and related
appurtenances as described in the plans, specifications and related addenda
for the LUMP SUM of: L.S. $455,800.00 L.S. $458,235.00 L.S. $462,500.00 L.S. $467,000.00 L.S. $468,300.00
ALTERNATE BIDS (Contractor must submit bids on all alternates listed)
1. JAMES STEELE 2.A B J ENTERPRISES 3. JOHNSON BUILDING 4.ROBERT 0. WESTLUND 5.HENRY MIKKELSON
CONSTRUCTION CO. INC. COMPANY CONSTRUCTION COMPANY
ALTERNATE NO. 1 In the event the City wishes to add the air conditioning as specified
ADD the LUMP SUM of: L.S. 3,800.00 L.S. 3,999.00 L.S. 3,974.00 L.S. 3,900.00 L.S. 4,000.00
ALTERNATE NO. 2 In the event the City wishes to add the floor receptor service sinks in the water meter shop and sign shop as specified
ADD the LUMP SUM of: L.S. 850.00 L.S. 872.00 L.S. 903.00 L.S. 889.00 L.S. 1,000.00
ALTERNATE NO. 3 In the event the City wishes to add the exterior sign light fixtures as specified
ADD the LUMP SUM of:
Unit Total Unit Total Unit Total Unit Total Unit Total
L.S. 460.00 L.S. 439.00 L.S.
ALTERNATE NO. 4 In the event the City wishes to add the radio control for overhead door No. 33 as specified
ADD the LUMP SUM of: L.S. 250.00 L.S. 109.00 L.S. 276.00
I hereby certify that this is an
exact reproduction of bids recei
Reg. No.6231
1 ,mil
Brad ord A. Lemberg
ALTERNATE NO. 5 In the event the City wishes to add electrical items necessary for the building connection (Room 25) as specified
ADD the LUMP SUM of: L.S. 400.00 L.S. 435.00 L.S. 461.00 L.S. 500.00
f'
539.00 L.S.4 475.00 L.S. 500.00
L.S. 150.00 L.S. 200.00
L.S. 400.00
ALTERNATE NO. 6 In the event the City wishes to add concrete sidewalk as shown on plan as specified
ADD the LUMP SUM of: L.S. 1,500.00 L.S. 4,183.00 L.S. 2,550.00 L.S. 5,200.00 L.S. 1,600.00
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
PROJECT NO. 1981 -10 FILE NO. 15401
Description
ADD the LUMP SUM of:
ADD the LUMP SUM of:
PROPOSAL ITEM
PAGE 2.
1. JAMES STEELE 2.A B J ENTERPRISES 3. JOHNSON BUILDING 4.ROBERT 0. WESTLUND 5.HENRY MIKKELSON
CONSTRUCTION CO. INC. COMPANY CONSTRUCTION COMPANY
Unit Total Unit Total Unit Total Unit Total Unit Total
ALTERNATE NO. 7 In the event the City wishes to add concrete curb and gutter as shown on plan as specified
ADD the LUMP SUM of: L.S. 2,450.00 L.S. 2,834.00 L.S. 2,450.00 L.S. 2,800.00 L.S. 2,500.00
ALTERNATE NO. 8 In the event the City wishes to add wall structures, door and roof for connection to existing building (Room 25) as specified
L.S. 2,250.00 L.S. 2,625.00 L.S. 3,333.00 L.S. 3,500.00 L.S. 2,000.00
ALTERNATE NO. 9 In the event the City wishes to add ceramic tile floor covering in Rooms 14 and 15 as specified
L.S. 2,000.00 L.S. 2,093.00 L.S. 2,100.00 L.S. 2,500.00 L.S. 2,000.00
ALTERNATE NO. 10 In the event the City wishes to add vinyl asbestos tile floor covering with vinyl base in Rooms 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 17, 18,
21, and 28, as specified
ADD the LUMP SUM of: L.S. 2,450.00 L.S. 2,572.00 L.S. 2,602.00 L.S. 2,800.00 L.S. 2,700.00
ALTERNATE NO. 11 In the event the City wishes to add carpet floor covering as shown in Rooms 3, 4, 5, 6, 8, 9, and 10, and delete VAT in these rooms as
specified ADD the LUMP SUM of: L.S. 1,725.00 L.S. 1,160.00 L.S. 1,195.00 L.S. 2,400.00 L.S. 2,200.00
ALTERNATE NO. 12 In the event the City wishes to add wood privacy fencing as specified
ADD the LUMP SUM of: L.S. 3,325.00 L.S. 2,742.00 L.S. 4,400.00 L.S. 3,300.00 L.S. 2,400.00
ALTERNATE NO. 13 In the event the City wishes to add painting of walls in Rooms 11, 12, 13, 19, and 20 as specified
ADD the LUMP SUM of: L.S. 1,300.00 L.S. 1,092.00 L.S. 1,389.00 L.S. 1,000.00 L.S. 1,300.00
ALTERNATE NO. 14 In the event the City wishes to add Trocal, Carlisle, Flagon or other sheet system roof in lieu of builtup roofing as specified
ADD the LUMP SUM of: L.S. 2,175.00 L.S. 2,280.00 L.S. 7,413.00 L.S. 3,000.00 L.S. 1,600.00
ALTERNATE NO. 15 In the event the City wishes to add sodding and seeding as specified
ADD the LUMP SUM of: L.S. 1,400.00 L.S. 1,421.00 L.S. 1,877.00 L.S. 1,600.00 L.S. 1,800.00
ALTERNATE NO. 16 In the event the City wishes to add painting of walls in Rooms 23 and 24 as specified
ADD the LUMP SUM of: L.S. 2,520.00 L.S. 1,693.00 L.S. 2,597.00 L.S. 1,650.00 L.S. 2,000.00
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
PROJECT NO. 1981 -10 FILE NO. 15401
ADDITIONAL ALTERNATE BIDS
Contractors No. Item
1. NONE LISTED
2. Precast walls Panels- Carpet
3. NONE LISTED
4. NONE LISTED
5. Taylor Doors Monarch Operators Taylors Doors
SUB- CONTRACTORS
Item
Precast Concrete
Masonry
Fire Sprinkler System
Heating Ventilating
Vehicle Exhaust System
Plumbing
Electrical
Roofing
Vehicle Hoist System
Overhead Hoist System
COMPLETION DATESS:
BID BOND, CERT. CHECK, CASH DEP.
FIRM
BY
TITLE
ADDRESS
TELEPHONE NO.
7'268a
Description
PROPOSAL ITEM
Subcontractor
1.Wells Bladholm 2. None
I.J. Steele Const. Listed
1.Berghorst
1.Berghorst
1.Berghorst
1.Berghorst
1.E.I.M.
1.Hale Co.
Manufacturer
Wells Callaway
1. JAMES STEELE 2.A B J ENTERPRISES 3. JOHNSON BUILDING 4.ROBERT 0. WESTLUND 5.HENRY MIKKELSON
CONSTRUCTION CO. INC. COMPANY CONSTRUCTION COMPANY
DEDUCTS $2,000 Deduct $200.00
DEDUCTS 1,9
3.None 4.None 5.Wells Concrete Products
Listed Listed Henry 0. Mikkelson
Berghorst Plbg. Co.
car* *kz`cats'c k k 4csYir 7lc* cic* k x sE *ic4cirsY :c
July 1, 1981
5% Bond
Add or Deduct
JOHNSON BUILDING
COMPANY
ROBERT V. HANSEN ARTHUR B. JOHNSON ROBERT A. JOHNSON
JAMES STEELE A B J ENTERPRISES
CONSTRUCTION CO. INC.
TREASURER
1410 SYLVAN STREET
ST.PAUL, MN. 55117
(612) 488 -6755
Omitted
11
11
Collins Electric
John Dalsin Co.
Hale Company
July 1, 1981
5% Bond
PRESIDENT
BOX 435
EXCELSIOR, MN. 55331
(612) 474 -5941
PAGE 3.
Per Specifications
5% Bond
PRESIDENT
501 SO.GATE OFFICE P
BLOOMINGTON,MN.55437
(612)831 8777
Phone No.
WELLS 553 -3318
MIKKELSON 861 -2255
BERGHORST 755 -3250
BERGHORST 755 -3250
BERGHORST 755 -3250
BERGHORST 755 -3250
COLLINS 374 -3550
DALSIN 729 -9334
HALE 636 -7476
As Per Addem. #1
5% Bond
7
ROBERT 0. WESTLUND
CONSTRUCTION CO.
ROBERT 0. WESTLUND
PRESIDENT
1781 N. HAMLINE AVE.
ST. PAUL, MN. 55113
(612) 645 -6230
July 1, 1981
5% Bond
HENRY MIKKELSON
COMPANY
HENRY MIKKELSON
PRESIDENT
20 WEST 59TH ST.
MPLS., MN. 55419
(612) 861 -2255
Description
TABULATION OF THIRTEEN BIDS OF THIRTEEN RECEIVED
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
PROJECT NO. 1981 -10 FILE NO. 15401
BID OPENING 2:00 P.M., C.S.T. THURSDAY, NOVEMBER 19, 1981
BONESTROO, ROSENE, ANDERLIK ASSOCIATES, INC. Consulting Engineers
2335 West Trunk Highway 36 SAINT PAUL, MINNESOTA 55113
PROPOSAL ITEM
ADD the LUMP SUM of: L.S.
6. RUTLEDGE 7. HENNING NELSON 8.ACTON CONSTRUCTION 9. H AND H
CONSTRUCTION CO. CONSTRUCTION CO. COMPANY ENTERPRISES
BASE BID
I /we propose to completely construct the Hopkins Public Works Building including all General, Mechanical, Electrical construction and related
appurtenances as described in the plans, specifications and related addenda
for the LUMP SUM of: L.S. $468,884.00 L.S. $470,107.00 L.S. $487,780.00 L.S. $487,900.00 L.S. $490,775.00
ALTERNATE BIDS (Contractor must submit bids on all alternates listed)
ALTERNATE NO. 1 In the event the City wishes to add the air conditioning as specified
ADD the LUMP SUM of: L.S. 4,015.00 L.S. 2,600.00 L.S. 3,850.00 L.S. 3,840.00 L.S. 4,000.00
ALTERNATE NO. 2 In the event the City wishes to add the floor receptor service sinks in the water meter shop and sign shop as specified
850.00 L.S. 1,250.00 L.S. 900.00
880.00 L.S.
500.00 L.S.
ALTERNATE NO. In the event the City wishes to add the exterior sign light fixtures as specified
ADD the LUMP SUM of: L.S. 483.00 L.S. 460.00 L.S.
ALTERNATE NO. 4 In the event the City wishes to add the radio control for overhead door No. 33 as specified
ADD the LUMP SUM of: L.S. 232.00 L.S. 110.00 L.S. 110.00
ALTERNATE NO. 5 In the event the City wishes to add electrical items necessary for the building connection (Room 25) as specified
ADD the LUMP SUM of: L.S. 431.00 L.S. 1,000.00 L.S. 430.00 L.S. 391.00 L.S. 430.00
ALTERNATE NO. 6 In the event the City wishes to add concrete sidewalk as shown on plan as specified
ADD the LUMP SUM of: L.S. 2,410.00 L.S. 2,400.00 L.S.
I hereby certify that this is an
exact reproduction of bids recei,
Reg. No.6231
Unit Total Unit Total Unit Total Unit Total Unit Total
500.00 439.00 L.S. 500.00
L.S. 230.00 L.S. 230.00
L. 15.
Bradford A. Lemberg
10.KLOSTER MADSEN
INC.
2,370.00 L.S. 3,220.00 L.S. 2,500.00
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
1981 -10 FILE NO. 15401
PROJECT NO.
Description
PROPOSAL ITEM
PAGE 5.
6. RUTLEDGE 7. HENNING NELSON 8.ACTON CONSTRUCTION 9. H AND H 10.KLOSTER MADSEN
CONSTRUCTION CO. CONSTRUCTION CO. COMPANY ENTERPRISES
Unit Total Unit Total Unit Total Unit Total Unit Total
ALTERNATE NO. 7 In the event the City wishes to add concrete curb and gutter as shown on plan as specified
ADD the LUMP SUM of: L.S. 2,257.00 L.S. 2,200.00 L.S. 3,100.00 L.S.L.S. 2,220.00 L.S. 2,800.00
ALTERNATE NO. 8 In the event the City wishes to add wall structures, door and roof for connection to existing building (Room 25) as specified
ADD the LUMP SUM of: L.S. 2,629.00 L.S. 2,300.00 L.S. 4,180.00 L.S. 1,630.00 L.S. 2,900.00
ALTERNATE NO. 9 In the event the City wishes to add ceramic tile floor covering in Rooms 14 and 15 as specified
ADD the LUMP SUM of: L.S. 2,112.00 L.S. 2,300.00 L.S. 2,000.00 L.S. 1,920.00 L.S. 2,550.00
ALTERNATE NO. 10 In the event the City wishes to add vinyl asbestos tile floor covering with vinyl base in Rooms 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 17, 18,
21, and 28, as specified
ADD the LUMP SUM of: L.S. 2,596.00 L.S. 2,500.00 L.S. 2,700.00 L.S. 2,360.00 L.S. 2,700.00
ALTERNATE NO. 11 In the event the City wishes to add carpet floor covering as shown in Rooms 3, 4, 5, 6, 8, 9, and 10, and delete VAT in these rooms as
specified ADD the LUMP SUM of: L.S. 1,171.00 L.S. 1,800.00 L.S. 2,200.00 L,S. 1,064.00 L.S. 1,300.00
ALTERNATE NO. 12 In the event the City wishes to add wood privacy fencing as specified
ADD the LUMP SUM of: L.S. 2,737.00 L.S. 670.00 L.S. 5,100.00 L.S. 2,780.00 L.S. 3,920.00
6
ALTERNATE NO. 13 In,the event the City wishes to add painting of walls in Rooms 11, 12, 13, 19, and 20 as specified
ADD the LUMP SUM of: L.S. 1,033.00 L.S. 1,000.00 L.S. 1,310.00 L.S. 1,200.00 L.S. 1,360.00
ALTERNATE NO. 14 In the event the City wishes to add Trocal, Carlisle, Flagon or other sheet system roof in lieu of builtup roofing as specified
ADD the LUMP SUM of: L.S. 2,684.00 L.S. 5,800.00 L.S. 2,190.00 L.S. 5,100.00 L.S. 5,500.00
ALTERNATE NO. 15 In the event the City wishes to add sodding and seeding as specified
ADD the LUMP SUM of: L.S. 1,100.00 L.S. 3,000.00 L.S. No. Bid L.S. 2,500.00 L.S. No.Bid
ALTERNATE NO. 16 In the event the City wishes to add painting of walls in Rooms 23 and 24 as specified
ADD the LUMP SUM of: L.S. .1,634.00 L.S. 1,600.00 L.S. 2,540.00 L.S. 1,950.00 L.S. 2,640.00
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
PROJECT NO.
CONTRACTORS NO.:
6.
Item
NONE LISTED
7. NONE LISTED
SUB CONTRACTORS
CONTRACTORS NO. ITEM
Precast Concrete
Masonry
Fire Sprinkler System
Heating Ventilating
Vehicle Exhaust System
Plumbing
Electrical
Roofing
Vehicle Hoist System
Overhead Hoist System
COMPLETION DATES:
BID BOND, CERT. CHECK, 'CASH DEP.
FIRM
BY
TITLE
ADDRESS
TELEPHONE NO.
7268a
1981 -10 FILE NO. 15401
PROPOSAL ITEM
ADDITIONAL ALTERNATE BIDS NUMBERS INDICATE CONTRACTOR
8.Precast 1 -1/4" Int. Wythe,Roof 3 -1/2" Poly.
9.Dverhead Door, Insulation (Roof)
10.Overhead Door
6.NONE 7. Wells 8. Wells
LISTED Henning Nelson Acton
John Dalsin
Pump Meter
6. RUTLEDGE 7. HENNING NELSON 8.ACTON CONSTRUCTION 9. H AND H
CONSTRUCTION CO. CONSTRUCTION CO. COMPANY ENTERPRISES
Insul.,Roof 3.1 Comp.Poured Insul., Overhead Doors
Berghorst
Collins
July 1981
5% Bond
Subcontractor
9. Wells 10.Wells /Bladholm
Wachholtz K -M
Grendahl Berghorst
RUTLEDGE
CONSTRUCTION CO.
NORMAN JOHNSON
VICE PRESIDENT
1409 S0. 7TH STREET
HOPKINS, MN. 55343
(612) 935 -5558
ff 7
It 71
11 It
July 1, 1981
5% Bond
HENNING NELSON
CONSTRUCTION CO.
MARK C. REINERTSON
VICE PRESIDENT
3735 NO. HWY. 52
MPLS. MN. 55422
(612) 522 -6611
PAGE 6.
Manufacturer
Wells,Central Roof T.C.
Taylor, Polystyrene
Taylor
PHONE NOS.
Wells 553 -3138
Acton 426 -1331
Berghorst 755 -3250
Garage Deducts $2000,5520,3
Deducts $1,891,3300
Deducts $1,500
E I M Collins Collins 374 -3550
Curran- Neilson John A. Dalsin Dalsin 729 -9334
Hale Northwest Service Pump Meter 933 -4800
Not Included
All listed sub contractors subject to change depending on alternates
5% Bond
July 1, 1981
5% Bond
Add or Deduct
10.KLOSTER MADSEN
INC.
July 1, 1981
5% Bond
ACTON CONSTRUCTION H AND H KLOSTER
COMPANY INC. ENTERPRISES MADSEN, INC.
JAMES F. SZUREK LARRY D. MAGNUSON JOHN RYAN
VICE PRESIDENT SECRETARY VICE PRESIDENT
P.O. BOX 394 P.O. BOX 698 P. 0. Box 20106
HUGO, MN. 55038 WATERTOWN,MN. 55388 MPLS., MN. 55420
(612)426 1331 (612) 446 -1325 (612) 881 -9425
TABULATION OF THIRTEEN BIDS OF THIRTEEN RECEIVED
!ROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
PROJECT NO. 1981 -10 FILE NO. 15401
BID OPENING 2 :00 P.M., C.S.T. THURSDAY, NOVEMBER 19, 1981
BONESTROO, ROSENE, ANDERLIK ASSOCIATES, INC. Consulting Engineers
2335 West Trunk Highway 36 SAINT PAUL, MINNESOTA 55113
Description
PROPOSAL ITEM
ALTERNATE BIDS (Contractor must submit bids on all alternates listed)
ALTERNATE NO. 3 In the event the City wishes to add the exterior sign light fixtures as specified
ADD the LUMP SUM of: L.S. 483.00 L.S. 460.00 L.S.
I hereby certify that this is an
exact reproduction of bids receiv 1:
t
Reg. No.6231
6. RUTLEDGE 7. HENNING NELSON 8.ACTON CONSTRUCTION 9. H AND H
CONSTRUCTION CO. CONSTRUCTION CO. COMPANY ENTERPRISES
500.00
ALTERNATE NO. 4 In the event the City wishes to add the radio control for overhead door No. 33 as specified
ADD the LUMP SUM of: L.S. 232.00 L.S. 110.00 L.S. 110.00
Bradford A. Lemberg
Unit Total Unit Total Unit Total Unit Total Unit Total
BASE BID
I /we propose to completely construct the Hopkins Public Works Building including all General, Mechanical, Electrical construction and related°
appurtenances as described in the plans, specifications and related addenda
for the LUMP SUM of: L.S. $468,884.00 L.S. $470,107.00 L.S. $487,780.00
ALTERNATE NO. 1 In the event the City wishes to add the air conditioning as specified
ADD the LUMP SUM of: L.S. 4,015.00 L.S. 2,600.00 L.S. 3,850.00 L.S. 3,840.00 L.S. 4,000.00
ALTERNATE NO. 2 In the event the City wishes to add the floor receptor service sinks in the water meter shop and sign shop as specified
ADD the LUMP SUM of: L.S. 880.00 L.S. 500.00 L.S. 850.00 L.S. 1,250.00
L.S.
L.S. 230.00
ALTERNATE NO. 5 In the event the City wishes to add electrical items necessary for the building connection (Room 25) as specified
ADD the LUMP SUM of: L.S. 431.00 L.S. 1,000.00 L.S. 430.00 L.S. 391.00
10.KLOSTER MADSEN
INC.
L.S. $487,900.00 L.S. $490,775.00
L.S. 900.00
439.00 L.S. 500.00
L.S. 230.00
L.S. 430.00
ALTERNATE NO. 6 In the event the City wishes to add concrete sidewalk as shown on plan as specified
ADD the LUMP SUM of: L.S. 2,410.00 L.S. 2,400.00 L.S. 2,370.00 L.S. 3,220.00 L.S. 2,500.00
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION HOPKINS, MINNESOTA
PROJECT NO. 1981 -10 FILE NO. 15401
Description
ALTERNATE NO. 7 In the event the City wishes to add concrete curb and gutter as shown on plan as specified
L.S. 4,000.00 L.S. 2,905.00 L.S. 2,300.00
ADD the LUMP SUM of:
ALTERNATE NO. 8 In the event the City wishes to add wall structures, door and roof for connection to existing building (Room 25) as specified
L.S. 4,000.00 L.S. 4,750.00 L.S. 3,800.00
ADD the LUMP SUM of:
PROPOSAL ITEM
PAGE 8.
11. ADOLFSON 12.TRUCKER SHEEHY 13.LOEFFEL- ENGSTRAND
PETERSON, INC. CONSTRUCTORS, INC. COMPANY
Unit Total Unit Total Unit Total
ALTERNATE NO. 9 In the event the City wishes to add ceramic tile floor covering in Rooms 14 and 15 as specified
ADD the LUMP SUM of: L.S. 2,020.00 L.S. 2,120.00 L.S. 2,100.00
ALTERNATE NO. 10 In the event the City wishes to add vinyl asbestos tile floor covering with vinyl base in Rooms 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 17, 18,
21, and 28, as specified
ADD the LUMP SUM of: L.S. 2,700.00 L.S. 2,600.00 L.S. 2,500.00
ALTERNATE NO. 11 In the event the City wishes to add carpet floor covering as shown in Rooms 3, 4, 5, 6, 8, 9, and 10, and delete VAT in these rooms as
specified ADD the LUMP SUM of: L.S. 2,200.00 L.S. 1,175.00 L.S. 1,200.00
ALTERNATE NO. 12 In the event the City wishes to add wood privacy fencing as specified
ADD the LUMP SUM of: L.S. 3,100.00 L.S. 3,300.00 L.S. 4,800.00
ALTERNATE NO. 13 an the event the City wishes to add painting of walls in Rooms 11, 12, 13, 19, and 20 as specified
ADD the LUMP SUM of: L.S. 1,300.00 L.S. 1,040.00 L.S. 1,100.00
ALTERNATE NO. 14 In the event the City wishes to add Trocal, Carlisle, Flagon or other sheet system roof in lieu of builtup roofing as specified
ADD the LUMP SUM of: L.S. 8,500.00 L.S. 1,500.00 L.S. 2,500.00
ALTERNATE NO. 15 In the event the City wishes to add sodding and seeding as specified
ADD the LUMP SUM of: L.S. 4,200.00 L.S. 13,750.00 L.S. 1,600.00
ALTERNATE NO. 16 In the event the City wishes to add painting of walls in Rooms 23 and 24 as specified
ADD the LUMP SUM of: L.S. 2,520.00 L.S. 1,640.00 L.S. 1,600.00
f
PROPOSAL FOR REBID PUBLIC WORKS BUILDING CONSTRUCTION IIOPKINS, MINNESOTA
PROJECT NO. 1981 -10 FILE NO. 15401
PROPOSAL ITEM
ADDITIONAL ALTERNATE BIDS LISTED BY CONTRACTOR NUMBER:
Item Manufacturer Add or Deduct
11. NONE LISTED
12. Steel (Roof in pl. ofPrecast)
13. overhead Doors
SUB CONTRACTORS
Item
Precast Concrete
Masonry
Fire Sprinkler System
Heating Ventilating
Vehicle Exhaust System
Plumbing
Electrical
Roofing
Vehicle Hoist System
Overhead Hoist System
BID BOND, CERT. CHECK, CASH DEP.
FIRM
BY
TITLE
ADDRESS
TELEPHONE NO.
7268a
Taylor DEDUCT $1,400
Fabcon M S Steel ADD $3,950
Subcontractor
11.Wells /Bladholm 12. Wells /Bladholm 13.Wells /Bladholm
A P Trucker Sheehy Loeffel Engstrand
Berghorst D.W. Hickey
N H
/t ?I
11. ADOLFSON
PETERSON, INC.
Berghorst Plbg
Collins Electric Collins Electric
John A. Daisin Faircon Roofing
Pump Meter Serv. Hale Co.
No Bid
1!
COMPLETION DATES: July 1, 1981
5% Bond
ADOLFSON PETERSON
INC.
DAVID G. ADOLFSON
PRESIDENT
6701 W. 23rd STREET
MPLS., MN. 55440
(612) 544 -1561
5% Bond
PAGE 9.
12.TRUCKER SHEEHY 13.LOEFFEL- ENGSTRAND
CONSTRUCTORS, INC. COMPANY
Phone Nos.
WELLS 553 -3138 BLADHOLM 722 -229
A P 544 -1561 TRUCKER SHEEHY 874 -6420
BERGHORST 755 -3250 D.W. HICKEY 646 -7551
COLLINS 374 -3550
DALSIN 729 -9334 FAIRCON ROOFING 633 -7476
PUMP METER 933 -4800
**t
July 1, 1981 July 1, 1981
5% Bond
TRUCKER SHEEHY LOEFFEL ENGSTRAND
CONSTRUCTORS, INC. COMPANY
J. L. TRUCKER ROBERT L. LOEFFEL
PRESIDENT PRESIDENT
2344 NICOLLET AVE.S0 612 11TH AVE. SO.
MPLS., MN. 55404 HOPKINS, MN. 55343
(612) 874 -6420 (612)935 -0141